FPL EVolution Make-Ready Credit
OpenFlorida Power & Light
A per-port credit toward the utility-side electrical work (service lines, transformers, switchgear, conduit, trenching, pads) needed to power new EV chargers; the customer buys and installs the chargers.
Who qualifies and how to apply
- How much
- Public DC fast chargers: 50-149 kW up to $20,000 per port (site cap $120,000); 150-249 kW up to $30,000 per port (site cap $180,000); 250 kW or greater up to $50,000 per port (site cap $300,000). Level 2: up to $1,200 per port. The credit is the lesser of that maximum or the actual make-ready cost.
- Who qualifies
- FPL customers installing public DC fast chargers (50 kW or greater), or Level 2 charging for public locations, workplaces, fleets or multifamily dwellings. Covers make-ready infrastructure only, not the chargers, customer-side equipment or maintenance. The infrastructure must be maintained through the performance period or the credit is repaid with interest and fees.
- When to apply
- Administrator application/credit agreement and site-specific make-ready approval apply; confirm before construction.
- Deadline
- No end date published; first come, first served until the budget is used up.