{"author": "BELL-2.codex", "generated_utc": "2026-10-13T21:53:38+00:00", "note": "Dated current/historical administrator reviews plus explicitly unresolved national discovery candidates. Only current PRIMARY verified records with verified geography and unexpired review/window can count as open.", "programs": [{"administrator": "Administering agency not yet verified", "afdc_ids": [11493], "afdc_topics": ["Alternative Fuel Vehicle (AFV) Conversion and Infrastructure Tax Credit"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["DC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fuel Vehicle (AFV) Conversion and Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11493", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fuel Vehicle (AFV) Conversion and Infrastructure Tax Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11493"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11493"], "source_url": "https://afdc.energy.gov/laws/11493", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fuel Vehicle (AFV) Conversion and Infrastructure Tax Credit", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fuel Vehicle (AFV) Conversion and Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [11558], "afdc_topics": ["Residential Electric Vehicle (EV) Charger Financing Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Residential Electric Vehicle (EV) Charger Financing Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11558", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Residential Electric Vehicle (EV) Charger Financing Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11558"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11558"], "source_url": "https://afdc.energy.gov/laws/11558", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Residential Electric Vehicle (EV) Charger Financing Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Residential Electric Vehicle (EV) Charger Financing Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [11562], "afdc_topics": ["Workplace and Fleet Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Workplace and Fleet Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11562", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Workplace and Fleet Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11562"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11562"], "source_url": "https://afdc.energy.gov/laws/11562", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Workplace and Fleet Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Workplace and Fleet Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colorado Energy Office", "afdc_ids": [11565], "afdc_topics": ["Electric Vehicle (EV) and Infrastructure Coaching Service"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) and Infrastructure Coaching Service. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11565", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) and Infrastructure Coaching Service", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colorado-energy-office", "provider_unit": "Colorado Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11565"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11565"], "source_url": "https://afdc.energy.gov/laws/11565", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) and Infrastructure Coaching Service", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) and Infrastructure Coaching Service. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [11610], "afdc_topics": ["Utility Electrification Plans and Return on Investment Authorization"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Utility Electrification Plans and Return on Investment Authorization. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11610", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Utility Electrification Plans and Return on Investment Authorization", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11610"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11610"], "source_url": "https://afdc.energy.gov/laws/11610", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Utility Electrification Plans and Return on Investment Authorization", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Utility Electrification Plans and Return on Investment Authorization. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [11642], "afdc_topics": ["Commercial Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Commercial Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11642", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Commercial Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11642"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11642"], "source_url": "https://afdc.energy.gov/laws/11642", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Commercial Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Commercial Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "San Joaquin Valley Air Pollution Control District", "afdc_ids": [11657], "afdc_topics": ["Electric Vehicle (EV) Charger Incentives - San Joaquin Valley"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Incentives - San Joaquin Valley. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11657", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Incentives - San Joaquin Valley", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "san-joaquin-valley-air-pollution-control-district", "provider_unit": "San Joaquin Valley Air Pollution Control District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11657"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11657"], "source_url": "https://afdc.energy.gov/laws/11657", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Incentives - San Joaquin Valley", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Incentives - San Joaquin Valley. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Department of Environmental Protection", "afdc_ids": [11701], "afdc_topics": ["Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11701", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-department-of-environmental-protection", "provider_unit": "New Jersey Department of Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11701"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11701"], "source_url": "https://afdc.energy.gov/laws/11701", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Transportation", "afdc_ids": [11803], "afdc_topics": ["Alternative Fueling Infrastructure Grant Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11803", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fueling Infrastructure Grant Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-transportation", "provider_unit": "Washington State Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11803"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11803"], "source_url": "https://afdc.energy.gov/laws/11803", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fueling Infrastructure Grant Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New York State Department of Environmental Conservation", "afdc_ids": [11897], "afdc_topics": ["Zero Emission Vehicle (ZEV) Rebate and ZEV Fueling Infrastructure Grant for Municipalities"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The Municipal ZEV Infrastructure Grant application period is closed. Its 2025 round ended February 27, 2026; no current open round was established.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": "February 27, 2026 at 4 p.m. (2025 round closed)", "deadline_date": "2026-02-27", "disposition": "historical", "disposition_reason": "Current DEC page explicitly closes this named application period; AFDC overview does not establish an open round.", "effective_status": "closed", "eligibility": "Historical round: New York counties, cities, towns and villages; other listed political subdivisions could participate only with an eligible lead municipality.", "equipment_conditions": "Historical round: approved lists, at least 7.2 kW L2 or 50 kW DC; principally public use.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "afdc-11897", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "New York Municipal ZEV Infrastructure Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-york-dec", "provider_unit": "New York State Department of Environmental Conservation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://dec.ny.gov/environmental-protection/climate-change/resources-for-local-governments/grants-for-climate-action"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["commercial"], "source_grade": "PRIMARY", "source_ids": ["ny-dec-municipal-zev-current", "source-https-afdc-energy-gov-laws-11897"], "source_url": "https://dec.ny.gov/environmental-protection/climate-change/resources-for-local-governments/grants-for-climate-action", "stacking_rules": "Historical round prohibited the same equipment funded under Charge Ready; permitted qualifying utility make-ready combinations.", "state": "NY", "states": ["NY"], "status": "closed", "summary": "The Municipal ZEV Infrastructure Grant application period is closed. Its 2025 round ended February 27, 2026; no current open round was established.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Eligible New York municipal public charging site with ownership or required easement/agreement", "title": "New York Municipal ZEV Infrastructure Grant", "unknown_fields": ["future funding round and terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Administering agency not yet verified", "afdc_ids": [11908], "afdc_topics": ["Electric Vehicle (EV) Charging Station Rebate - South Coast and MSRC"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Rebate - South Coast and MSRC. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11908", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charging Station Rebate - South Coast and MSRC", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11908"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11908"], "source_url": "https://afdc.energy.gov/laws/11908", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charging Station Rebate - South Coast and MSRC", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Rebate - South Coast and MSRC. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Connecticut Department of Energy and Environmental Protection", "afdc_ids": [11973], "afdc_topics": ["Heavy-Duty Vehicle Emissions Reduction Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Heavy-Duty Vehicle Emissions Reduction Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-11973", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Heavy-Duty Vehicle Emissions Reduction Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "connecticut-department-of-energy-and-environmental-protection", "provider_unit": "Connecticut Department of Energy and Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/11973"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-11973"], "source_url": "https://afdc.energy.gov/laws/11973", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Heavy-Duty Vehicle Emissions Reduction Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Heavy-Duty Vehicle Emissions Reduction Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Connecticut Green Bank", "afdc_ids": [12005], "afdc_topics": ["Loans for Residential Charging or Natural Gas Fueling Infrastructure"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Loans for Residential Charging or Natural Gas Fueling Infrastructure. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12005", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Loans for Residential Charging or Natural Gas Fueling Infrastructure", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "connecticut-green-bank", "provider_unit": "Connecticut Green Bank", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12005"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12005"], "source_url": "https://afdc.energy.gov/laws/12005", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Loans for Residential Charging or Natural Gas Fueling Infrastructure", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Loans for Residential Charging or Natural Gas Fueling Infrastructure. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [12021], "afdc_topics": ["Electric Vehicle (EV) Charger Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Rebate. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12021", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12021"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12021"], "source_url": "https://afdc.energy.gov/laws/12021", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Rebate", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Rebate. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont State Infrastructure Bank", "afdc_ids": [12033], "afdc_topics": ["Alternative Fueling Infrastructure Incentive"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Incentive. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12033", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fueling Infrastructure Incentive", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-state-infrastructure-bank", "provider_unit": "Vermont State Infrastructure Bank", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12033"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12033"], "source_url": "https://afdc.energy.gov/laws/12033", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fueling Infrastructure Incentive", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Incentive. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Oklahoma Department of Environmental Quality", "afdc_ids": [12081], "afdc_topics": ["Alternative Fuel School Bus and Electric Vehicle (EV) Charger Rebate Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fuel School Bus and Electric Vehicle (EV) Charger Rebate Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12081", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fuel School Bus and Electric Vehicle (EV) Charger Rebate Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oklahoma-department-of-environmental-quality", "provider_unit": "Oklahoma Department of Environmental Quality", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12081"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12081"], "source_url": "https://afdc.energy.gov/laws/12081", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fuel School Bus and Electric Vehicle (EV) Charger Rebate Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fuel School Bus and Electric Vehicle (EV) Charger Rebate Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [12159], "afdc_topics": ["Public Access Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Public Access Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12159", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Public Access Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12159"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12159"], "source_url": "https://afdc.energy.gov/laws/12159", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Public Access Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Public Access Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [12160], "afdc_topics": ["Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12160", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12160"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12160"], "source_url": "https://afdc.energy.gov/laws/12160", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Multi-Family Housing (MFH) and Educational Campus Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Department of Environment and Conservation", "afdc_ids": [12218], "afdc_topics": ["Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12218", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-department-of-environment-and-conservation", "provider_unit": "Tennessee Department of Environment and Conservation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12218"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12218"], "source_url": "https://afdc.energy.gov/laws/12218", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Maryland Department of the Environment", "afdc_ids": [12219], "afdc_topics": ["Zero Emission School Bus Grant Program and Study"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Zero Emission School Bus Grant Program and Study. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12219", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Zero Emission School Bus Grant Program and Study", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "maryland-department-of-the-environment", "provider_unit": "Maryland Department of the Environment", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12219"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12219"], "source_url": "https://afdc.energy.gov/laws/12219", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Zero Emission School Bus Grant Program and Study", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Zero Emission School Bus Grant Program and Study. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Transportation", "afdc_ids": [12222], "afdc_topics": ["Public Transportation Grant Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Public Transportation Grant Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12222", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Public Transportation Grant Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-transportation", "provider_unit": "Washington State Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12222"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12222"], "source_url": "https://afdc.energy.gov/laws/12222", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Public Transportation Grant Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Public Transportation Grant Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Alabama Department of Economic and Community Affairs", "afdc_ids": [12273], "afdc_topics": ["Electric Vehicle (EV) Charger and Medium- and Heavy-Duty Diesel Vehicle Replacement Rebates"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger and Medium- and Heavy-Duty Diesel Vehicle Replacement Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12273", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger and Medium- and Heavy-Duty Diesel Vehicle Replacement Rebates", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "alabama-department-of-economic-and-community-affairs", "provider_unit": "Alabama Department of Economic and Community Affairs", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12273"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12273"], "source_url": "https://afdc.energy.gov/laws/12273", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger and Medium- and Heavy-Duty Diesel Vehicle Replacement Rebates", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger and Medium- and Heavy-Duty Diesel Vehicle Replacement Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Illinois Environmental Protection Agency", "afdc_ids": [12308], "afdc_topics": ["Transportation Electrification Infrastructure Projects"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Transportation Electrification Infrastructure Projects. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12308", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Transportation Electrification Infrastructure Projects", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "illinois-environmental-protection-agency", "provider_unit": "Illinois Environmental Protection Agency", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12308"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12308"], "source_url": "https://afdc.energy.gov/laws/12308", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Transportation Electrification Infrastructure Projects", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Transportation Electrification Infrastructure Projects. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Bay Area Air Quality Management District", "afdc_ids": [12322], "afdc_topics": ["Electric Vehicle (EV) and Fuel Cell Electric Vehicle (FCEV) Grant - Bay Area"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) and Fuel Cell Electric Vehicle (FCEV) Grant - Bay Area. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12322", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) and Fuel Cell Electric Vehicle (FCEV) Grant - Bay Area", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "bay-area-air-quality-management-district", "provider_unit": "Bay Area Air Quality Management District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12322"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12322"], "source_url": "https://afdc.energy.gov/laws/12322", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) and Fuel Cell Electric Vehicle (FCEV) Grant - Bay Area", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) and Fuel Cell Electric Vehicle (FCEV) Grant - Bay Area. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Board of Public Utilities", "afdc_ids": [12364], "afdc_topics": ["Electric Vehicle (EV) Fleet Grant Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Fleet Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12364", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Fleet Grant Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-board-of-public-utilities", "provider_unit": "New Jersey Board of Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12364"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12364"], "source_url": "https://afdc.energy.gov/laws/12364", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Fleet Grant Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Fleet Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New York State Department of Environmental Conservation", "afdc_ids": [12419], "afdc_topics": ["Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12419", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-york-state-department-of-environmental-conservation", "provider_unit": "New York State Department of Environmental Conservation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12419"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12419"], "source_url": "https://afdc.energy.gov/laws/12419", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Vehicle Emissions Reduction and Electric Vehicle (EV) Charging Station Project Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colorado Energy Office", "afdc_ids": [12432], "afdc_topics": ["Direct Current (DC) Fast Charging Plazas Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Direct Current (DC) Fast Charging Plazas Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12432", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Direct Current (DC) Fast Charging Plazas Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colorado-energy-office", "provider_unit": "Colorado Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12432"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12432"], "source_url": "https://afdc.energy.gov/laws/12432", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Direct Current (DC) Fast Charging Plazas Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Direct Current (DC) Fast Charging Plazas Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Hawaii Green Infrastructure Authority", "afdc_ids": [12621], "afdc_topics": ["Transportation Electrification Loan Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["HI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Transportation Electrification Loan Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12621", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Transportation Electrification Loan Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "hawaii-green-infrastructure-authority", "provider_unit": "Hawaii Green Infrastructure Authority", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12621"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12621"], "source_url": "https://afdc.energy.gov/laws/12621", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Transportation Electrification Loan Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Transportation Electrification Loan Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [12648], "afdc_topics": ["Electric Vehicle (EV) Charger Tax Exemption"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12648", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Tax Exemption", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12648"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12648"], "source_url": "https://afdc.energy.gov/laws/12648", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Tax Exemption", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Maryland Energy Administration", "afdc_ids": [12676], "afdc_topics": ["Local Government Energy Modernization Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Local Government Energy Modernization Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12676", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Local Government Energy Modernization Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "maryland-energy-administration", "provider_unit": "Maryland Energy Administration", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12676"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12676"], "source_url": "https://afdc.energy.gov/laws/12676", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Local Government Energy Modernization Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Local Government Energy Modernization Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Efficiency Maine Trust", "afdc_ids": [12682], "afdc_topics": ["Clean Transportation and Infrastructure Financing"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ME"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Clean Transportation and Infrastructure Financing. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12682", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Clean Transportation and Infrastructure Financing", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "efficiency-maine-trust", "provider_unit": "Efficiency Maine Trust", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12682"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12682"], "source_url": "https://afdc.energy.gov/laws/12682", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Clean Transportation and Infrastructure Financing", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Clean Transportation and Infrastructure Financing. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Antelope Valley Air Quality Management District", "afdc_ids": [12719], "afdc_topics": ["Electric Vehicle (EV) Charger Grant – Antelope Valley"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grant – Antelope Valley. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12719", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Grant – Antelope Valley", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "antelope-valley-air-quality-management-district", "provider_unit": "Antelope Valley Air Quality Management District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12719"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12719"], "source_url": "https://afdc.energy.gov/laws/12719", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Grant – Antelope Valley", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grant – Antelope Valley. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Board of Public Utilities", "afdc_ids": [12832], "afdc_topics": ["Electric Vehicle (EV) and EV Charger Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) and EV Charger Rebate. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12832", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) and EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-board-of-public-utilities", "provider_unit": "New Jersey Board of Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12832"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12832"], "source_url": "https://afdc.energy.gov/laws/12832", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) and EV Charger Rebate", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) and EV Charger Rebate. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [12845], "afdc_topics": ["Electric Vehicle (EV) Charger Make-Ready Building Renovation Tax Credit"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NM"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Make-Ready Building Renovation Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12845", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Make-Ready Building Renovation Tax Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12845"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12845"], "source_url": "https://afdc.energy.gov/laws/12845", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Make-Ready Building Renovation Tax Credit", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Make-Ready Building Renovation Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Transportation", "afdc_ids": [12860], "afdc_topics": ["Zero Emission Vehicle (ZEV) Carshare and Infrastructure Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Zero Emission Vehicle (ZEV) Carshare and Infrastructure Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12860", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Zero Emission Vehicle (ZEV) Carshare and Infrastructure Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-transportation", "provider_unit": "Washington State Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12860"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12860"], "source_url": "https://afdc.energy.gov/laws/12860", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Zero Emission Vehicle (ZEV) Carshare and Infrastructure Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Zero Emission Vehicle (ZEV) Carshare and Infrastructure Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Illinois Environmental Protection Agency", "afdc_ids": [12899], "afdc_topics": ["Electric Vehicle (EV) Charger Incentives"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Incentives. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12899", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Incentives", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "illinois-environmental-protection-agency", "provider_unit": "Illinois Environmental Protection Agency", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12899"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12899"], "source_url": "https://afdc.energy.gov/laws/12899", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Incentives", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Incentives. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Connecticut Department of Energy and Environmental Protection", "afdc_ids": [12949], "afdc_topics": ["Zero Emission School Bus Funding and Technical Assistance"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Zero Emission School Bus Funding and Technical Assistance. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12949", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Zero Emission School Bus Funding and Technical Assistance", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "connecticut-department-of-energy-and-environmental-protection", "provider_unit": "Connecticut Department of Energy and Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12949"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12949"], "source_url": "https://afdc.energy.gov/laws/12949", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Zero Emission School Bus Funding and Technical Assistance", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Zero Emission School Bus Funding and Technical Assistance. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colorado Clean Diesel Program", "afdc_ids": [12992], "afdc_topics": ["Diesel Emissions Reduction Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Diesel Emissions Reduction Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12992", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Diesel Emissions Reduction Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colorado-clean-diesel-program", "provider_unit": "Colorado Clean Diesel Program", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12992"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12992"], "source_url": "https://afdc.energy.gov/laws/12992", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Diesel Emissions Reduction Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Diesel Emissions Reduction Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Alabama Department of Economic and Community Affairs", "afdc_ids": [12997], "afdc_topics": ["Electric Vehicle (EV) Chargers Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Chargers Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-12997", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Chargers Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "alabama-department-of-economic-and-community-affairs", "provider_unit": "Alabama Department of Economic and Community Affairs", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/12997"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-12997"], "source_url": "https://afdc.energy.gov/laws/12997", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Chargers Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Chargers Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Office of Future Mobility and Electrification and the Michigan Department of Transportation", "afdc_ids": [13035], "afdc_topics": ["Electrification Technology Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electrification Technology Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13035", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electrification Technology Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "office-of-future-mobility-and-electrification-and-the-michigan-department-of-transportation", "provider_unit": "Office of Future Mobility and Electrification and the Michigan Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13035"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13035"], "source_url": "https://afdc.energy.gov/laws/13035", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electrification Technology Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electrification Technology Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont Department of Housing and Community Development", "afdc_ids": [13040], "afdc_topics": ["Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13040", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-department-of-housing-and-community-development", "provider_unit": "Vermont Department of Housing and Community Development", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13040"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13040"], "source_url": "https://afdc.energy.gov/laws/13040", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Iowa Department of Transportation", "afdc_ids": [13080], "afdc_topics": ["Electric Vehicle (EV) Charger Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13080", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "iowa-department-of-transportation", "provider_unit": "Iowa Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13080"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13080"], "source_url": "https://afdc.energy.gov/laws/13080", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Board of Public Utilities", "afdc_ids": [13094], "afdc_topics": ["Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13094", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-board-of-public-utilities", "provider_unit": "New Jersey Board of Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13094"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13094"], "source_url": "https://afdc.energy.gov/laws/13094", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Board of Public Utilities", "afdc_ids": [13095], "afdc_topics": ["Public Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Public Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13095", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Public Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-board-of-public-utilities", "provider_unit": "New Jersey Board of Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13095"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13095"], "source_url": "https://afdc.energy.gov/laws/13095", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Public Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Public Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Oregon Department of Energy", "afdc_ids": [13181], "afdc_topics": ["Community Electric Vehicle (EV) Charger Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Community Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13181", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Community Electric Vehicle (EV) Charger Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oregon-department-of-energy", "provider_unit": "Oregon Department of Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13181"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13181"], "source_url": "https://afdc.energy.gov/laws/13181", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Community Electric Vehicle (EV) Charger Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Community Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [13238], "afdc_topics": ["Diesel Emission Reduction Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["HI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Diesel Emission Reduction Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13238", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Diesel Emission Reduction Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13238"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13238"], "source_url": "https://afdc.energy.gov/laws/13238", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Diesel Emission Reduction Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Diesel Emission Reduction Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colorado Energy Office", "afdc_ids": [13243], "afdc_topics": ["Fleet Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Fleet Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13243", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Fleet Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colorado-energy-office", "provider_unit": "Colorado Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13243"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13243"], "source_url": "https://afdc.energy.gov/laws/13243", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Fleet Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Fleet Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont Department of Housing and Community Development", "afdc_ids": [13259], "afdc_topics": ["Workplace Electric Vehicle (EV) Charger Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Workplace Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13259", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Workplace Electric Vehicle (EV) Charger Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-department-of-housing-and-community-development", "provider_unit": "Vermont Department of Housing and Community Development", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13259"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13259"], "source_url": "https://afdc.energy.gov/laws/13259", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Workplace Electric Vehicle (EV) Charger Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Workplace Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont Department of Housing and Community Development", "afdc_ids": [13260], "afdc_topics": ["Public Attraction Electric Vehicle (EV) Charger Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Public Attraction Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13260", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Public Attraction Electric Vehicle (EV) Charger Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-department-of-housing-and-community-development", "provider_unit": "Vermont Department of Housing and Community Development", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13260"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13260"], "source_url": "https://afdc.energy.gov/laws/13260", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Public Attraction Electric Vehicle (EV) Charger Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Public Attraction Electric Vehicle (EV) Charger Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [13266], "afdc_topics": ["Electric Vehicle (EV) Charger Property Tax Exemption"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Property Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13266", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Property Tax Exemption", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13266"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13266"], "source_url": "https://afdc.energy.gov/laws/13266", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Property Tax Exemption", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Property Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Department of Environmental Protection", "afdc_ids": [13278], "afdc_topics": ["Electric Vehicle (EV) and EV Charger Grant Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) and EV Charger Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13278", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) and EV Charger Grant Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-department-of-environmental-protection", "provider_unit": "New Jersey Department of Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13278"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13278"], "source_url": "https://afdc.energy.gov/laws/13278", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) and EV Charger Grant Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) and EV Charger Grant Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [13330], "afdc_topics": ["Electric Vehicle Charging Station Rebate – Northern and Southern California"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle Charging Station Rebate – Northern and Southern California. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13330", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle Charging Station Rebate – Northern and Southern California", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13330"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13330"], "source_url": "https://afdc.energy.gov/laws/13330", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle Charging Station Rebate – Northern and Southern California", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle Charging Station Rebate – Northern and Southern California. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Commerce", "afdc_ids": [13354], "afdc_topics": ["Community Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Community Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13354", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Community Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-commerce", "provider_unit": "Washington State Department of Commerce", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13354"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13354"], "source_url": "https://afdc.energy.gov/laws/13354", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Community Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Community Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Ecology", "afdc_ids": [13356], "afdc_topics": ["Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13356", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-ecology", "provider_unit": "Washington State Department of Ecology", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13356"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13356"], "source_url": "https://afdc.energy.gov/laws/13356", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [13358], "afdc_topics": ["Electric Vehicle (EV) Charging Station Energy Fee Exemption"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Energy Fee Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13358", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charging Station Energy Fee Exemption", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13358"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13358"], "source_url": "https://afdc.energy.gov/laws/13358", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charging Station Energy Fee Exemption", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Energy Fee Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New York State Energy Research and Development Authority", "afdc_ids": [13378], "afdc_topics": ["Zero Emission School Bus and Infrastructure Funding"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Zero Emission School Bus and Infrastructure Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13378", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Zero Emission School Bus and Infrastructure Funding", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-york-state-energy-research-and-development-authority", "provider_unit": "New York State Energy Research and Development Authority", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13378"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13378"], "source_url": "https://afdc.energy.gov/laws/13378", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Zero Emission School Bus and Infrastructure Funding", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Zero Emission School Bus and Infrastructure Funding. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Kentucky Energy and Environment Cabinet", "afdc_ids": [13428], "afdc_topics": ["EV Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["KY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: EV Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13428", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "EV Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "kentucky-energy-and-environment-cabinet", "provider_unit": "Kentucky Energy and Environment Cabinet", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13428"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13428"], "source_url": "https://afdc.energy.gov/laws/13428", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "EV Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: EV Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Ecology", "afdc_ids": [13453], "afdc_topics": ["School Bus Transition Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: School Bus Transition Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13453", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "School Bus Transition Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-ecology", "provider_unit": "Washington State Department of Ecology", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13453"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13453"], "source_url": "https://afdc.energy.gov/laws/13453", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "School Bus Transition Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: School Bus Transition Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "El Dorado County Air Quality Management District", "afdc_ids": [13508], "afdc_topics": ["Residential Electric Vehicle (EV) and EV Charger Rebates – El Dorado County"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Residential Electric Vehicle (EV) and EV Charger Rebates – El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13508", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Residential Electric Vehicle (EV) and EV Charger Rebates – El Dorado County", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "el-dorado-county-air-quality-management-district", "provider_unit": "El Dorado County Air Quality Management District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13508"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13508"], "source_url": "https://afdc.energy.gov/laws/13508", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Residential Electric Vehicle (EV) and EV Charger Rebates – El Dorado County", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Residential Electric Vehicle (EV) and EV Charger Rebates – El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "California Pollution Control Financing Authority", "afdc_ids": [13509], "afdc_topics": ["Medium- and Heavy-Duty (MHD) Zero Emission Vehicle (ZEV) and Fueling Station Financing Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Medium- and Heavy-Duty (MHD) Zero Emission Vehicle (ZEV) and Fueling Station Financing Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13509", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Medium- and Heavy-Duty (MHD) Zero Emission Vehicle (ZEV) and Fueling Station Financing Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "california-pollution-control-financing-authority", "provider_unit": "California Pollution Control Financing Authority", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13509"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13509"], "source_url": "https://afdc.energy.gov/laws/13509", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Medium- and Heavy-Duty (MHD) Zero Emission Vehicle (ZEV) and Fueling Station Financing Program", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Medium- and Heavy-Duty (MHD) Zero Emission Vehicle (ZEV) and Fueling Station Financing Program. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "California Energy Commission", "afdc_ids": [13534], "afdc_topics": ["Vehicle Grid Integration (VGI) Research and Development Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Vehicle Grid Integration (VGI) Research and Development Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13534", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Vehicle Grid Integration (VGI) Research and Development Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "california-energy-commission", "provider_unit": "California Energy Commission", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/13534"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-13534"], "source_url": "https://afdc.energy.gov/laws/13534", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vehicle Grid Integration (VGI) Research and Development Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Vehicle Grid Integration (VGI) Research and Development Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "California Energy Commission", "afdc_ids": [14221], "afdc_topics": ["Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14221", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "california-energy-commission", "provider_unit": "California Energy Commission", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14221"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14221"], "source_url": "https://afdc.energy.gov/laws/14221", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Multifamily Housing (MFH) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Board of Public Utilities", "afdc_ids": [14277], "afdc_topics": ["Medium- and Heavy-Duty (MHD) Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Medium- and Heavy-Duty (MHD) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14277", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Medium- and Heavy-Duty (MHD) Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-board-of-public-utilities", "provider_unit": "New Jersey Board of Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14277"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14277"], "source_url": "https://afdc.energy.gov/laws/14277", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Medium- and Heavy-Duty (MHD) Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Medium- and Heavy-Duty (MHD) Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Jersey Department of Environmental Protection", "afdc_ids": [14279], "afdc_topics": ["Electric School Bus Grant"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric School Bus Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14279", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric School Bus Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-jersey-department-of-environmental-protection", "provider_unit": "New Jersey Department of Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14279"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14279"], "source_url": "https://afdc.energy.gov/laws/14279", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric School Bus Grant", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric School Bus Grant. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Utah Department of Environmental Quality", "afdc_ids": [14347], "afdc_topics": ["Clean Fleet Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["UT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Clean Fleet Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14347", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Clean Fleet Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "utah-department-of-environmental-quality", "provider_unit": "Utah Department of Environmental Quality", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14347"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14347"], "source_url": "https://afdc.energy.gov/laws/14347", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Clean Fleet Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Clean Fleet Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [14351], "afdc_topics": ["Off-Peak Charger Rebates"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ME"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Off-Peak Charger Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14351", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Off-Peak Charger Rebates", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14351"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14351"], "source_url": "https://afdc.energy.gov/laws/14351", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Off-Peak Charger Rebates", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Off-Peak Charger Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Washington State Department of Transportation", "afdc_ids": [14353], "afdc_topics": ["Electric Vehicle Charger Reliability Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle Charger Reliability Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14353", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle Charger Reliability Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-state-department-of-transportation", "provider_unit": "Washington State Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14353"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14353"], "source_url": "https://afdc.energy.gov/laws/14353", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle Charger Reliability Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle Charger Reliability Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [14360], "afdc_topics": ["Alternative Fuel Excise Tax Exemption"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fuel Excise Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14360", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fuel Excise Tax Exemption", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14360"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14360"], "source_url": "https://afdc.energy.gov/laws/14360", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fuel Excise Tax Exemption", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fuel Excise Tax Exemption. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Minnesota Pollution Control Agency", "afdc_ids": [14361], "afdc_topics": ["Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14361", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "minnesota-pollution-control-agency", "provider_unit": "Minnesota Pollution Control Agency", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14361"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14361"], "source_url": "https://afdc.energy.gov/laws/14361", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "El Dorado County Air Quality Management District", "afdc_ids": [14396], "afdc_topics": ["Low-Income Electric Vehicle (EV) and EV Charger Rebates: El Dorado County"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Low-Income Electric Vehicle (EV) and EV Charger Rebates: El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14396", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Low-Income Electric Vehicle (EV) and EV Charger Rebates: El Dorado County", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "el-dorado-county-air-quality-management-district", "provider_unit": "El Dorado County Air Quality Management District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14396"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14396"], "source_url": "https://afdc.energy.gov/laws/14396", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Low-Income Electric Vehicle (EV) and EV Charger Rebates: El Dorado County", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Low-Income Electric Vehicle (EV) and EV Charger Rebates: El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "El Dorado County Air Quality Management District", "afdc_ids": [14397], "afdc_topics": ["Commercial Electric Vehicle (EV) Charger Grant: El Dorado County"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Commercial Electric Vehicle (EV) Charger Grant: El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14397", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Commercial Electric Vehicle (EV) Charger Grant: El Dorado County", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "el-dorado-county-air-quality-management-district", "provider_unit": "El Dorado County Air Quality Management District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14397"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14397"], "source_url": "https://afdc.energy.gov/laws/14397", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Commercial Electric Vehicle (EV) Charger Grant: El Dorado County", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Commercial Electric Vehicle (EV) Charger Grant: El Dorado County. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [14400], "afdc_topics": ["Electric Vehicle (EV) Charging Station Rebates"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["HI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14400", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charging Station Rebates", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14400"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14400"], "source_url": "https://afdc.energy.gov/laws/14400", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charging Station Rebates", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charging Station Rebates. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Oregon Department of Environmental Quality", "afdc_ids": [14418], "afdc_topics": ["Zero-Emission Fueling Infrastructure Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Zero-Emission Fueling Infrastructure Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14418", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Zero-Emission Fueling Infrastructure Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oregon-department-of-environmental-quality", "provider_unit": "Oregon Department of Environmental Quality", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/14418"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-14418"], "source_url": "https://afdc.energy.gov/laws/14418", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Zero-Emission Fueling Infrastructure Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Zero-Emission Fueling Infrastructure Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [5951], "afdc_topics": ["Alternative Fueling Infrastructure Tax Credit"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-5951", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fueling Infrastructure Tax Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/5951"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-5951"], "source_url": "https://afdc.energy.gov/laws/5951", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fueling Infrastructure Tax Credit", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fueling Infrastructure Tax Credit. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New York State Department of Taxation and Finance", "afdc_ids": [6017], "afdc_topics": ["Alternative Fueling Infrastructure Tax Credit"], "amount": "Lesser of $5,000 or 50% of eligible property and installation labor cost, less grant-paid costs, per qualifying installation", "amount_formula": "50% of eligible net cost, capped at $5,000 per qualifying installation", "application_route_notes": "Use the applicable IT-637 or CT-637 tax-return process; this is not a rebate reservation.", "application_route_type": "instructions", "application_sequence": "Establish qualifying property/business use; install and document net eligible costs; claim on applicable state tax return; retain records and monitor recapture conditions.", "application_url": "https://www.tax.ny.gov/forms/current-forms/it/it637i.htm", "application_url_source_id": "ny-tax-credit-instructions", "body": "A nonrefundable New York tax credit for qualifying charging property used at least 50% in a New York trade or business. Personal-use home charging alone does not meet this requirement.", "bucket": "money", "candidate_states": ["NY"], "cap": "$5,000 per qualifying installation; nonrefundable", "change_trigger": "Tax law, state filing instructions or property eligibility changes.", "covered_costs": "Qualifying recharging equipment and necessary installation labor", "deadline": "Available for taxable years beginning through December 31, 2028; this is a tax-year cutoff, not a universal installation or filing deadline.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Current official tax overview, linked instructions and statute reviewed.", "effective_status": "open", "eligibility": "Qualifying property in New York, used at least 50% in a New York trade or business; taxpayer and property must meet current tax-law/form rules.", "equipment_conditions": "Equipment needed to convey electricity from the grid or another power source to an onboard vehicle energy-storage system; located in New York and used at least 50% in a New York trade or business during the tax year.", "excluded_costs": "Grant-paid costs and personal-use property that does not satisfy the business-use test", "funding_limit": null, "geography_verified": true, "id": "afdc-6017", "kind": "tax-credit", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "New York alternative fuels and EV recharging property tax credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Claim through applicable state income/corporate tax form; no rebate reservation or automatic payment.", "provider_id": "new-york-tax", "provider_unit": "New York State Department of Taxation and Finance", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tax.ny.gov/pit/credits/alt_fuels_elec_vehicles.htm"}], "required_documents": "Applicable IT-637 or CT-637 calculation and supporting property, installation labor, grant, business-use and placed-in-service records; taxpayer-specific filing instructions control.", "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["commercial", "multifamily", "fleet"], "source_grade": "PRIMARY", "source_ids": ["ny-tax-credit-overview", "ny-tax-credit-instructions", "ny-tax-credit-statute", "source-https-afdc-energy-gov-laws-6017"], "source_url": "https://www.tax.ny.gov/pit/credits/alt_fuels_elec_vehicles.htm", "stacking_rules": "Subtract grant-paid costs; qualifying property cannot have been paid for from grants awarded before January 1, 2015. Separate tax limits and recapture rules apply.", "state": "NY", "states": ["NY"], "status": "open", "summary": "A nonrefundable New York tax credit for qualifying charging property used at least 50% in a New York trade or business. Personal-use home charging alone does not meet this requirement.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Qualifying property located in New York with the required New York business use", "title": "New York alternative fuels and EV recharging property tax credit", "unknown_fields": ["taxpayer-specific credit use and recapture", "2026 tax-return form instructions when published"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Nebraska Energy Office", "afdc_ids": [6252], "afdc_topics": ["Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NE"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-6252", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "nebraska-energy-office", "provider_unit": "Nebraska Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/6252"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-6252"], "source_url": "https://afdc.energy.gov/laws/6252", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Loans. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "California Energy Commission", "afdc_ids": [6307], "afdc_topics": ["Alternative Fuel and Vehicle Incentives"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Alternative Fuel and Vehicle Incentives. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-6307", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Alternative Fuel and Vehicle Incentives", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "california-energy-commission", "provider_unit": "California Energy Commission", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/6307"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-6307"], "source_url": "https://afdc.energy.gov/laws/6307", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alternative Fuel and Vehicle Incentives", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Alternative Fuel and Vehicle Incentives. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colorado Energy Office", "afdc_ids": [6578], "afdc_topics": ["Electric Vehicle (EV) Charger Grants"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-6578", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colorado-energy-office", "provider_unit": "Colorado Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/6578"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "home", "multifamily", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-6578"], "source_url": "https://afdc.energy.gov/laws/6578", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Grants", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Grants. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Administering agency not yet verified", "afdc_ids": [8385], "afdc_topics": ["Electric Vehicle (EV) Charger Financing Authorization"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Financing Authorization. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-8385", "kind": "", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Financing Authorization", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "administering-agency-not-yet-verified", "provider_unit": "Administering agency not yet verified", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://afdc.energy.gov/laws/8385"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-afdc-energy-gov-laws-8385"], "source_url": "https://afdc.energy.gov/laws/8385", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electric Vehicle (EV) Charger Financing Authorization", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Read the fresh AFDC discovery entry: Electric Vehicle (EV) Charger Financing Authorization. AFDC is a secondary program/law index, not its administrator. Its topic categories and summary amounts do not independently establish current applications. The jurisdiction-specific official agency review is recorded separately."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Alabama Power", "afdc_ids": [13536], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Transportation Business Programs. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13536", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Alabama Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "alabama-power", "provider_unit": "Alabama Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.alabamapower.com/business/business-customers-and-services/electric-transportation-business-programs.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-alabamapower-com-business-business-customers-and-services-electric-transportation-business-programs-html"], "source_url": "https://www.alabamapower.com/business/business-customers-and-services/electric-transportation-business-programs.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alabama Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Transportation Business Programs. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Alameda Municipal Power", "afdc_ids": [13537], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Alameda Municipal Power, CA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13537", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Alameda Municipal Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "alameda-municipal-power", "provider_unit": "Alameda Municipal Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.alamedamp.com/349/Electric-Vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-alamedamp-com-349-electric-vehicles"], "source_url": "https://www.alamedamp.com/349/Electric-Vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alameda Municipal Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Alameda Municipal Power, CA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Anaheim Public Utilities", "afdc_ids": [13539], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Anaheim, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13539", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Anaheim Public Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "anaheim-public-utilities", "provider_unit": "Anaheim Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://anaheim.net/6291/Electric-Vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-anaheim-net-6291-electric-vehicles"], "source_url": "https://anaheim.net/6291/Electric-Vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Anaheim Public Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Anaheim, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Applied Energy Services (AES) Indiana", "afdc_ids": [13540], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles (EV) | AES Indiana. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13540", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Applied Energy Services (AES) Indiana charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "applied-energy-services-aes-indiana", "provider_unit": "Applied Energy Services (AES) Indiana", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.aesindiana.com/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-aesindiana-com-electric-vehicles"], "source_url": "https://www.aesindiana.com/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Applied Energy Services (AES) Indiana charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles (EV) | AES Indiana. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duquesne Light Company (DLC)", "afdc_ids": [13543], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["PA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for PA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13543", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duquesne Light Company (DLC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duquesne-light-company-dlc", "provider_unit": "Duquesne Light Company (DLC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duquesnelight.com/energy-money-savings/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duquesnelight-com-energy-money-savings-electric-vehicles"], "source_url": "https://www.duquesnelight.com/energy-money-savings/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duquesne Light Company (DLC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for PA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "El Paso Electric", "afdc_ids": [13544], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NM"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on New Mexico EV Program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13544", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "El Paso Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "el-paso-electric", "provider_unit": "El Paso Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.epelectric.com/renewables-tech/electric-vehicles/new-mexico-programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-epelectric-com-renewables-tech-electric-vehicles-new-mexico-programs"], "source_url": "https://www.epelectric.com/renewables-tech/electric-vehicles/new-mexico-programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "El Paso Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on New Mexico EV Program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Holland Board of Public Works (HBPW)", "afdc_ids": [13547], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Charging and Electrification Rebates - Holland Board of Public Works. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13547", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Holland Board of Public Works (HBPW) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "holland-board-of-public-works-hbpw", "provider_unit": "Holland Board of Public Works (HBPW)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://hollandbpw.com/en/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-hollandbpw-com-en-electric-vehicles"], "source_url": "https://hollandbpw.com/en/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Holland Board of Public Works (HBPW) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Charging and Electrification Rebates - Holland Board of Public Works. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Indiana Michigan Power", "afdc_ids": [13548], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13548", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Indiana Michigan Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "indiana-michigan-power", "provider_unit": "Indiana Michigan Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.indianamichiganpower.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-indianamichiganpower-com-clean-energy-electric-cars"], "source_url": "https://www.indianamichiganpower.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Indiana Michigan Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Indiana Michigan Power", "afdc_ids": [13549], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13549", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Indiana Michigan Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "indiana-michigan-power", "provider_unit": "Indiana Michigan Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.indianamichiganpower.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-indianamichiganpower-com-clean-energy-electric-cars"], "source_url": "https://www.indianamichiganpower.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Indiana Michigan Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Jersey Central Power & Light (JCP&L)", "afdc_ids": [13550], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "JCP&L commercial/DCFC installation subprograms reached maximum funding and closed. Residential make-ready and off-peak credits closed June 30, 2025; the remaining BGS TOU credit is a rate program.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "historical", "disposition_reason": "JCP&L commercial/DCFC installation subprograms reached maximum funding and closed. Residential make-ready and off-peak credits closed June 30, 2025; the remaining BGS TOU credit is a rate program.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "afdc-13550", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Jersey Central Power & Light (JCP&L) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "jersey-central-power-light-jcp-l", "provider_unit": "Jersey Central Power & Light (JCP&L)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.firstenergycorp.com/help/electric-vehicles/nj-ev/new-jersey-ev.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "PRIMARY", "source_ids": ["source-https-www-firstenergycorp-com-help-electric-vehicles-nj-ev-new-jersey-ev-html"], "source_url": "https://www.firstenergycorp.com/help/electric-vehicles/nj-ev/new-jersey-ev.html", "stacking_rules": null, "state": "NJ", "states": ["NJ"], "status": "closed", "summary": "JCP&L commercial/DCFC installation subprograms reached maximum funding and closed. Residential make-ready and off-peak credits closed June 30, 2025; the remaining BGS TOU credit is a rate program.", "superseded_by": null, "technologies": [], "territory": "The named provider electricity account in NJ; no installation funding currently confirmed", "title": "Jersey Central Power & Light (JCP&L) charging-incentive discovery record", "unknown_fields": ["future installation funding round"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Madison Gas and Electric (MGE)", "afdc_ids": [13552], "afdc_topics": ["EV Charger Deployment Pilot Programs"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Basics - Madison Gas and Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13552", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Madison Gas and Electric (MGE) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "madison-gas-and-electric-mge", "provider_unit": "Madison Gas and Electric (MGE)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mge.com/our-environment/electric-vehicles/shift-save"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mge-com-our-environment-electric-vehicles-shift-save"], "source_url": "https://www.mge.com/our-environment/electric-vehicles/shift-save", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Madison Gas and Electric (MGE) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Basics - Madison Gas and Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "MCE", "afdc_ids": [13553], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved MCE article is dated September 21, 2021; its historical amounts do not certify a current application offer.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13553", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "MCE charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mce", "provider_unit": "MCE", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mcecleanenergy.org/mce-news/energy-101-electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mcecleanenergy-org-mce-news-energy-101-electric-vehicles"], "source_url": "https://www.mcecleanenergy.org/mce-news/energy-101-electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "MCE charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved MCE article is dated September 21, 2021; its historical amounts do not certify a current application offer."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Pacific Gas and Electric", "afdc_ids": [13555], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles (EV) | PG&E. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13555", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Pacific Gas and Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pacific-gas-and-electric", "provider_unit": "Pacific Gas and Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.pge.com/en/clean-energy/electric-vehicles.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-pge-com-en-clean-energy-electric-vehicles-html"], "source_url": "https://www.pge.com/en/clean-energy/electric-vehicles.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Pacific Gas and Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles (EV) | PG&E. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southern California Public Power Authority", "afdc_ids": [13559], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on SCPPA – Southern California Public Power Authority. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13559", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southern California Public Power Authority charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southern-california-public-power-authority", "provider_unit": "Southern California Public Power Authority", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://scppa.org/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-scppa-org"], "source_url": "https://scppa.org/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southern California Public Power Authority charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on SCPPA – Southern California Public Power Authority. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "United Electric Cooperative", "afdc_ids": [13560], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | United Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13560", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "United Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "united-electric-cooperative", "provider_unit": "United Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ueci.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ueci-coop"], "source_url": "https://www.ueci.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "United Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | United Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "United Illuminating (UI)", "afdc_ids": [13561], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CT; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13561", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "United Illuminating (UI) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "united-illuminating-ui", "provider_unit": "United Illuminating (UI)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.uinet.com/electric-vehicles?p_l_back_url=%2Fsearch%3Fq%3Delectric%2520vehicle"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-uinet-com-electric-vehicles-p-l-back-url-2fsearch-3fq-3delectric-2520vehicle"], "source_url": "https://www.uinet.com/electric-vehicles?p_l_back_url=%2Fsearch%3Fq%3Delectric%2520vehicle", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "United Illuminating (UI) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CT; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13562], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13562", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13563], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13563", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13564], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13564", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13565], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NM"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13565", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13566], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ND"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13566", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13567], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13567", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13568], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13568", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Xcel Energy", "afdc_ids": [13569], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13569", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Xcel Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "xcel-energy", "provider_unit": "Xcel Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nm-my-xcelenergy-com-s-our-commitment-ev-vision"], "source_url": "https://nm.my.xcelenergy.com/s/our-commitment/ev-vision", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Xcel Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO, MI, MN, ND, NM, SD, TX, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Appalachian Power Company", "afdc_ids": [13572], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13572", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Appalachian Power Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "appalachian-power-company", "provider_unit": "Appalachian Power Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.appalachianpower.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-appalachianpower-com-clean-energy-electric-cars"], "source_url": "https://www.appalachianpower.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Appalachian Power Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Appalachian Power Company", "afdc_ids": [13573], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13573", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Appalachian Power Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "appalachian-power-company", "provider_unit": "Appalachian Power Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.appalachianpower.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-appalachianpower-com-clean-energy-electric-cars"], "source_url": "https://www.appalachianpower.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Appalachian Power Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Appalachian Power Company", "afdc_ids": [13574], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WV"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13574", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Appalachian Power Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "appalachian-power-company", "provider_unit": "Appalachian Power Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.appalachianpower.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-appalachianpower-com-clean-energy-electric-cars"], "source_url": "https://www.appalachianpower.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Appalachian Power Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Arizona Public Service Company", "afdc_ids": [13575], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "APS says business EV charging incentives and make-ready infrastructure programs are not currently available.", "bucket": "money", "candidate_states": ["AZ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "historical", "disposition_reason": "APS says business EV charging incentives and make-ready infrastructure programs are not currently available.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "afdc-13575", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Arizona Public Service Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "arizona-public-service-company", "provider_unit": "Arizona Public Service Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.aps.com/en/About/Sustainability-and-Innovation/Technology-and-Innovation/Electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "PRIMARY", "source_ids": ["source-https-www-aps-com-en-about-sustainability-and-innovation-technology-and-innovation-electric-vehicles"], "source_url": "https://www.aps.com/en/About/Sustainability-and-Innovation/Technology-and-Innovation/Electric-vehicles", "stacking_rules": null, "state": "AZ", "states": ["AZ"], "status": "closed", "summary": "APS says business EV charging incentives and make-ready infrastructure programs are not currently available.", "superseded_by": null, "technologies": [], "territory": "The named provider electricity account in AZ; no installation funding currently confirmed", "title": "Arizona Public Service Company charging-incentive discovery record", "unknown_fields": ["future installation funding round"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Azusa Light & Water", "afdc_ids": [13576], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Plug-In Electric Vehicles | Azusa, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13576", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Azusa Light & Water charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "azusa-light-water", "provider_unit": "Azusa Light & Water", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.azusaca.gov/1625/Plug-In-Electric-Vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-azusaca-gov-1625-plug-in-electric-vehicles"], "source_url": "https://www.azusaca.gov/1625/Plug-In-Electric-Vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Azusa Light & Water charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Plug-In Electric Vehicles | Azusa, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Baltimore Gas and Electric Company (BGE)", "afdc_ids": [13577], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13577", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Baltimore Gas and Electric Company (BGE) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "baltimore-gas-and-electric-company-bge", "provider_unit": "Baltimore Gas and Electric Company (BGE)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.bge.com/smart-energy/innovation-technology/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-bge-com-smart-energy-innovation-technology-electric-vehicles"], "source_url": "https://www.bge.com/smart-energy/innovation-technology/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Baltimore Gas and Electric Company (BGE) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13579], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13579", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13580], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13580", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13581], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13581", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13582], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NE"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13582", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13583], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13583", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Black Hills Energy", "afdc_ids": [13584], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13584", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Black Hills Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "black-hills-energy", "provider_unit": "Black Hills Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-blackhillsenergy-com-efficiency-and-savings-ready-ev"], "source_url": "https://www.blackhillsenergy.com/efficiency-and-savings/ready-ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Black Hills Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The current Ready EV page limits these charger rebates to Colorado, South Dakota and Wyoming electric customers; its other corporate territories do not establish charger eligibility."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Braintree Electric Light Department (BELD)", "afdc_ids": [13585], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Braintree Electric Light Department – Your hometown electric provider. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13585", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Braintree Electric Light Department (BELD) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "braintree-electric-light-department-beld", "provider_unit": "Braintree Electric Light Department (BELD)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.beld.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-beld-com"], "source_url": "https://www.beld.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Braintree Electric Light Department (BELD) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Braintree Electric Light Department – Your hometown electric provider. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Burbank Water & Power", "afdc_ids": [13586], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Residential EV Charging Stations Rebate - Burbank Water And Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13586", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Burbank Water & Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "burbank-water-power", "provider_unit": "Burbank Water & Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.burbankwaterandpower.com/residential-ev-charging-stations-rebate"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-burbankwaterandpower-com-residential-ev-charging-stations-rebate"], "source_url": "https://www.burbankwaterandpower.com/residential-ev-charging-stations-rebate", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Burbank Water & Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Residential EV Charging Stations Rebate - Burbank Water And Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Burlington Electric Department (BED)", "afdc_ids": [13587], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Burlington Electric Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13587", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Burlington Electric Department (BED) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "burlington-electric-department-bed", "provider_unit": "Burlington Electric Department (BED)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.burlingtonelectric.com/ev#financing"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-burlingtonelectric-com-ev-financing"], "source_url": "https://www.burlingtonelectric.com/ev#financing", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Burlington Electric Department (BED) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Burlington Electric Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Butler Rural Electric Coop, Inc.", "afdc_ids": [13588], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Butler Rural Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13588", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Butler Rural Electric Coop, Inc. charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "butler-rural-electric-coop-inc", "provider_unit": "Butler Rural Electric Coop, Inc.", "published_date": null, "references": [{"description": "Primary administrator source", "url": "http://www.butlerrural.coop"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-http-www-butlerrural-coop"], "source_url": "http://www.butlerrural.coop", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Butler Rural Electric Coop, Inc. charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Butler Rural Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Central Hudson", "afdc_ids": [13589], "afdc_topics": ["EV Charger Deployment Pilot Programs", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13589", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Central Hudson charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "central-hudson", "provider_unit": "Central Hudson", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cenhud.com/en/my-energy/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-cenhud-com-en-my-energy-electric-vehicles"], "source_url": "https://www.cenhud.com/en/my-energy/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Central Hudson charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Colton Public Utilities", "afdc_ids": [13591], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Conservation Programs & Rebates | Colton, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13591", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Colton Public Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "colton-public-utilities", "provider_unit": "Colton Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ci.colton.ca.us/348/Conservation-Programs-Rebates"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ci-colton-ca-us-348-conservation-programs-rebates"], "source_url": "https://www.ci.colton.ca.us/348/Conservation-Programs-Rebates", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Colton Public Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Conservation Programs & Rebates | Colton, CA - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Con Edison", "afdc_ids": [13592], "afdc_topics": ["EV Charger Deployment Pilot Programs", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Con Edison. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13592", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Con Edison charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "con-edison", "provider_unit": "Con Edison", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.coned.com/en/our-energy-future/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-coned-com-en-our-energy-future-electric-vehicles"], "source_url": "https://www.coned.com/en/our-energy-future/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Con Edison charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Con Edison. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Consumers Energy", "afdc_ids": [13593], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home Charging Savings & Resources | Consumers Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13593", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Consumers Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "consumers-energy", "provider_unit": "Consumers Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.consumersenergy.com/residential/programs-and-services/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-consumersenergy-com-residential-programs-and-services-electric-vehicles"], "source_url": "https://www.consumersenergy.com/residential/programs-and-services/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Consumers Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home Charging Savings & Resources | Consumers Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Corn Belt Energy Corporation", "afdc_ids": [13594], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13594", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Corn Belt Energy Corporation charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "corn-belt-energy-corporation", "provider_unit": "Corn Belt Energy Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cornbeltenergy.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-cornbeltenergy-com"], "source_url": "https://cornbeltenergy.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Corn Belt Energy Corporation charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Corn Belt Energy Corporation", "afdc_ids": [13595], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13595", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Corn Belt Energy Corporation charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "corn-belt-energy-corporation", "provider_unit": "Corn Belt Energy Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cornbeltenergy.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-cornbeltenergy-com"], "source_url": "https://cornbeltenergy.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Corn Belt Energy Corporation charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Corn Belt Energy Corporation", "afdc_ids": [13596], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13596", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Corn Belt Energy Corporation charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "corn-belt-energy-corporation", "provider_unit": "Corn Belt Energy Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cornbeltenergy.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-cornbeltenergy-com"], "source_url": "https://cornbeltenergy.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Corn Belt Energy Corporation charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Corn Belt Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dakota Electric Association", "afdc_ids": [13601], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Programs & Rebates – Dakota Electric Association®. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13601", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dakota Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dakota-electric-association", "provider_unit": "Dakota Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dakotaelectric.com/member-services/programs-rebates/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dakotaelectric-com-member-services-programs-rebates"], "source_url": "https://www.dakotaelectric.com/member-services/programs-rebates/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dakota Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Programs & Rebates – Dakota Electric Association®. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Delmarva Power", "afdc_ids": [13602], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["DE"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for DE, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13602", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Delmarva Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "delmarva-power", "provider_unit": "Delmarva Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.delmarva.com/smart-energy/innovation-technology"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-delmarva-com-smart-energy-innovation-technology"], "source_url": "https://www.delmarva.com/smart-energy/innovation-technology", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Delmarva Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for DE, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Delmarva Power", "afdc_ids": [13603], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for DE, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13603", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Delmarva Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "delmarva-power", "provider_unit": "Delmarva Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.delmarva.com/smart-energy/innovation-technology"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-delmarva-com-smart-energy-innovation-technology"], "source_url": "https://www.delmarva.com/smart-energy/innovation-technology", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Delmarva Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for DE, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "DTE Energy", "afdc_ids": [13605], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Resources | DTE Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13605", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "DTE Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dte-energy", "provider_unit": "DTE Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dteenergy.com/us/en/residential/service-request/pev/plug-in-electric-vehicles-pev.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dteenergy-com-us-en-residential-service-request-pev-plug-in-electric-vehicles-pev-html"], "source_url": "https://www.dteenergy.com/us/en/residential/service-request/pev/plug-in-electric-vehicles-pev.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "DTE Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Resources | DTE Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13606], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13606", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13607], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13607", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13608], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["KY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13608", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13609], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13609", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13610], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13610", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13611], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13611", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Duke Energy", "afdc_ids": [13612], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13612", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Duke Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy", "provider_unit": "Duke Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-duke-energy-com-energy-education-electric-vehicles-ev-initiatives"], "source_url": "https://www.duke-energy.com/energy-education/electric-vehicles/ev-initiatives", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Duke Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Initiatives - Duke Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "East Central Energy", "afdc_ids": [13613], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on ELECTRIC VEHICLE CHARGER REBATE | East Central Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13613", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "East Central Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "east-central-energy", "provider_unit": "East Central Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.eastcentralenergy.com/electric-vehicle-charger-rebate"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-eastcentralenergy-com-electric-vehicle-charger-rebate"], "source_url": "https://www.eastcentralenergy.com/electric-vehicle-charger-rebate", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "East Central Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on ELECTRIC VEHICLE CHARGER REBATE | East Central Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Entergy", "afdc_ids": [13616], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13616", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Entergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "entergy", "provider_unit": "Entergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://entergyetech.com/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-entergyetech-com-electric-vehicles"], "source_url": "https://entergyetech.com/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Entergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Entergy", "afdc_ids": [13617], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["LA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13617", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Entergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "entergy", "provider_unit": "Entergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://entergyetech.com/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-entergyetech-com-electric-vehicles"], "source_url": "https://entergyetech.com/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Entergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Entergy", "afdc_ids": [13618], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MS"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13618", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Entergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "entergy", "provider_unit": "Entergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://entergyetech.com/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-entergyetech-com-electric-vehicles"], "source_url": "https://entergyetech.com/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Entergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Entergy", "afdc_ids": [13619], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13619", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Entergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "entergy", "provider_unit": "Entergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://entergyetech.com/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-entergyetech-com-electric-vehicles"], "source_url": "https://entergyetech.com/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Entergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles - eTech - Entergy electric technology program. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Evergy", "afdc_ids": [13620], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["KS"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Fleet Electrification - Evergy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13620", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Evergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "evergy", "provider_unit": "Evergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.evergy.com/ways-to-save/incentives-link/ev-charging-rebates/fleet-electrification"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-evergy-com-ways-to-save-incentives-link-ev-charging-rebates-fleet-electrification"], "source_url": "https://www.evergy.com/ways-to-save/incentives-link/ev-charging-rebates/fleet-electrification", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Evergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Fleet Electrification - Evergy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Evergy", "afdc_ids": [13621], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Fleet Electrification - Evergy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13621", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Evergy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "evergy", "provider_unit": "Evergy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.evergy.com/ways-to-save/incentives-link/ev-charging-rebates/fleet-electrification"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-evergy-com-ways-to-save-incentives-link-ev-charging-rebates-fleet-electrification"], "source_url": "https://www.evergy.com/ways-to-save/incentives-link/ev-charging-rebates/fleet-electrification", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Evergy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Fleet Electrification - Evergy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Eversource", "afdc_ids": [13622], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13622", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Eversource charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "eversource", "provider_unit": "Eversource", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-eversource-com-content-residential-save-money-energy-clean-energy-options-electric-vehicles"], "source_url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Eversource charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Eversource", "afdc_ids": [13623], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13623", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Eversource charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "eversource", "provider_unit": "Eversource", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-eversource-com-content-residential-save-money-energy-clean-energy-options-electric-vehicles"], "source_url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Eversource charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Eversource", "afdc_ids": [13624], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13624", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Eversource charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "eversource", "provider_unit": "Eversource", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-eversource-com-content-residential-save-money-energy-clean-energy-options-electric-vehicles"], "source_url": "https://www.eversource.com/content/residential/save-money-energy/clean-energy-options/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Eversource charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Eversource. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Glendale Public Service Department", "afdc_ids": [13626], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13626", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Glendale Public Service Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "glendale-public-service-department", "provider_unit": "Glendale Public Service Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.glendaleca.gov/government/departments/glendale-water-and-power/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-glendaleca-gov-government-departments-glendale-water-and-power-electric-vehicles"], "source_url": "https://www.glendaleca.gov/government/departments/glendale-water-and-power/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Glendale Public Service Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Glendale Water and Power", "afdc_ids": [13627], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13627", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Glendale Water and Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "glendale-water-and-power", "provider_unit": "Glendale Water and Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.glendaleca.gov/government/departments/glendale-water-and-power/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-glendaleca-gov-government-departments-glendale-water-and-power-electric-vehicles"], "source_url": "https://www.glendaleca.gov/government/departments/glendale-water-and-power/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Glendale Water and Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Jackson Electric Membership Corporation (GA)", "afdc_ids": [13630], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Jackson EMC | Electric Vehicles (EV). This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13630", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Jackson Electric Membership Corporation (GA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "jackson-electric-membership-corporation-ga", "provider_unit": "Jackson Electric Membership Corporation (GA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.jacksonemc.com/member-services/ev-and-renewable-energy/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-jacksonemc-com-member-services-ev-and-renewable-energy-electric-vehicles"], "source_url": "https://www.jacksonemc.com/member-services/ev-and-renewable-energy/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Jackson Electric Membership Corporation (GA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Jackson EMC | Electric Vehicles (EV). This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Jacksonville Electric Authority (JEA)", "afdc_ids": [13631], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Please enable JavaScript to view the page content.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13631", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Jacksonville Electric Authority (JEA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "jacksonville-electric-authority-jea", "provider_unit": "Jacksonville Electric Authority (JEA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.jea.com/environment/drive_electric/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-jea-com-environment-drive-electric"], "source_url": "https://www.jea.com/environment/drive_electric/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Jacksonville Electric Authority (JEA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Please enable JavaScript to view the page content.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Johnson County REMC", "afdc_ids": [13632], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - JCREMC - Your Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13632", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Johnson County REMC charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "johnson-county-remc", "provider_unit": "Johnson County REMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://jcremc.com/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-jcremc-com-electric-vehicles"], "source_url": "https://jcremc.com/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Johnson County REMC charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - JCREMC - Your Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Lansing Board of Water & Light (BWL)", "afdc_ids": [13634], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Plug-In Electric Vehicles (PEV) | lbwl.com. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13634", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Lansing Board of Water & Light (BWL) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "lansing-board-of-water-light-bwl", "provider_unit": "Lansing Board of Water & Light (BWL)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.lbwl.com/customers/save-money-energy/plug-electric-vehicles-pev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-lbwl-com-customers-save-money-energy-plug-electric-vehicles-pev"], "source_url": "https://www.lbwl.com/customers/save-money-energy/plug-electric-vehicles-pev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Lansing Board of Water & Light (BWL) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Plug-In Electric Vehicles (PEV) | lbwl.com. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Mountain View Electric Association", "afdc_ids": [13642], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13642", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Mountain View Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mountain-view-electric-association", "provider_unit": "Mountain View Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mvea.coop/save-energy-money/renewable-energy/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mvea-coop-save-energy-money-renewable-energy-electric-vehicles"], "source_url": "https://www.mvea.coop/save-energy-money/renewable-energy/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Mountain View Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "National Grid", "afdc_ids": [13643], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13643", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "National Grid charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "national-grid", "provider_unit": "National Grid", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nationalgridus.com/electric-vehicle-hub/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nationalgridus-com-electric-vehicle-hub"], "source_url": "https://www.nationalgridus.com/electric-vehicle-hub/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "National Grid charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "National Grid", "afdc_ids": [13644], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13644", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "National Grid charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "national-grid", "provider_unit": "National Grid", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nationalgridus.com/electric-vehicle-hub/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nationalgridus-com-electric-vehicle-hub"], "source_url": "https://www.nationalgridus.com/electric-vehicle-hub/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "National Grid charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "National Grid", "afdc_ids": [13645], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["RI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13645", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "National Grid charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "national-grid", "provider_unit": "National Grid", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nationalgridus.com/electric-vehicle-hub/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nationalgridus-com-electric-vehicle-hub"], "source_url": "https://www.nationalgridus.com/electric-vehicle-hub/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "National Grid charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Hub | National Grid. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Hampshire Electric Co-op (NHEC)", "afdc_ids": [13646], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Savings | New Hampshire Electric Co-op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13646", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "New Hampshire Electric Co-op (NHEC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-hampshire-electric-co-op-nhec", "provider_unit": "New Hampshire Electric Co-op (NHEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nhec.com/energy-savings/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nhec-com-energy-savings"], "source_url": "https://www.nhec.com/energy-savings/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "New Hampshire Electric Co-op (NHEC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Savings | New Hampshire Electric Co-op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Oklahoma Gas & Electric Company", "afdc_ids": [13652], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on OG&E - Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13652", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Oklahoma Gas & Electric Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oklahoma-gas-electric-company", "provider_unit": "Oklahoma Gas & Electric Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.oge.com/web/portal/label_ord/energy-solutions/electricvehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-oge-com-web-portal-label-ord-energy-solutions-electricvehicles"], "source_url": "https://www.oge.com/web/portal/label_ord/energy-solutions/electricvehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Oklahoma Gas & Electric Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on OG&E - Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Otter Tail Power", "afdc_ids": [13653], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13653", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Otter Tail Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "otter-tail-power", "provider_unit": "Otter Tail Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-otpco-com-ways-to-save-topics-electric-vehicles"], "source_url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Otter Tail Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Otter Tail Power", "afdc_ids": [13654], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ND"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13654", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Otter Tail Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "otter-tail-power", "provider_unit": "Otter Tail Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-otpco-com-ways-to-save-topics-electric-vehicles"], "source_url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Otter Tail Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Otter Tail Power", "afdc_ids": [13655], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13655", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Otter Tail Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "otter-tail-power", "provider_unit": "Otter Tail Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-otpco-com-ways-to-save-topics-electric-vehicles"], "source_url": "https://www.otpco.com/ways-to-save/topics/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Otter Tail Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric vehicles: An efficient option | Otter Tail Power Company. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Portland General Electric (PGE)", "afdc_ids": [13656], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Car Oregon | Chargers & Benefits | PGE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13656", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Portland General Electric (PGE) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "portland-general-electric-pge", "provider_unit": "Portland General Electric (PGE)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://portlandgeneral.com/energy-choices/electric-vehicles-charging/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-portlandgeneral-com-energy-choices-electric-vehicles-charging"], "source_url": "https://portlandgeneral.com/energy-choices/electric-vehicles-charging/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Portland General Electric (PGE) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Car Oregon | Chargers & Benefits | PGE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Public Service Co of NM", "afdc_ids": [13657], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on PNM Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13657", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Public Service Co of NM charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "public-service-co-of-nm", "provider_unit": "Public Service Co of NM", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.pnmdriveelectric.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-pnmdriveelectric-com"], "source_url": "https://www.pnmdriveelectric.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Public Service Co of NM charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on PNM Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Riverside Public Utilities Department", "afdc_ids": [13659], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Riverside Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13659", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Riverside Public Utilities Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "riverside-public-utilities-department", "provider_unit": "Riverside Public Utilities Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.riversideca.gov/utilities/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-riversideca-gov-utilities"], "source_url": "https://www.riversideca.gov/utilities/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Riverside Public Utilities Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Riverside Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Rocky Mountain Power", "afdc_ids": [13660], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ID"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13660", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Rocky Mountain Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "rocky-mountain-power", "provider_unit": "Rocky Mountain Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-rockymountainpower-net-savings-energy-choices-electric-vehicles-html"], "source_url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Rocky Mountain Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Rocky Mountain Power", "afdc_ids": [13661], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["UT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13661", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Rocky Mountain Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "rocky-mountain-power", "provider_unit": "Rocky Mountain Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-rockymountainpower-net-savings-energy-choices-electric-vehicles-html"], "source_url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Rocky Mountain Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Rocky Mountain Power", "afdc_ids": [13662], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13662", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Rocky Mountain Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "rocky-mountain-power", "provider_unit": "Rocky Mountain Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-rockymountainpower-net-savings-energy-choices-electric-vehicles-html"], "source_url": "https://www.rockymountainpower.net/savings-energy-choices/electric-vehicles.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Rocky Mountain Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Runestone Electric Association", "afdc_ids": [13664], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for MN; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13664", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Runestone Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "runestone-electric-association", "provider_unit": "Runestone Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.runestoneelectric.com/energy-wise-programs/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-runestoneelectric-com-energy-wise-programs-electric-vehicles"], "source_url": "https://www.runestoneelectric.com/energy-wise-programs/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Runestone Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for MN; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Salt River Project", "afdc_ids": [13666], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AZ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for AZ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13666", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Salt River Project charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "salt-river-project", "provider_unit": "Salt River Project", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.srpnet.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-srpnet-com"], "source_url": "https://www.srpnet.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Salt River Project charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for AZ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Sawnee Electric Membership Corporation", "afdc_ids": [13669], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Sawnee EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13669", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Sawnee Electric Membership Corporation charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "sawnee-electric-membership-corporation", "provider_unit": "Sawnee Electric Membership Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sawnee.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sawnee-coop"], "source_url": "https://www.sawnee.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Sawnee Electric Membership Corporation charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Sawnee EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Shakopee Public Utilities", "afdc_ids": [13670], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Shakopee Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13670", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Shakopee Public Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "shakopee-public-utilities", "provider_unit": "Shakopee Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://shakopeeutilities.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-shakopeeutilities-com"], "source_url": "https://shakopeeutilities.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Shakopee Public Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Shakopee Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Sonoma Clean Power", "afdc_ids": [13671], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on SCP Rewards | Sonoma Clean Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13671", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Sonoma Clean Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "sonoma-clean-power", "provider_unit": "Sonoma Clean Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://sonomacleanpower.org/programs/gridsavvyrewards"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-sonomacleanpower-org-programs-gridsavvyrewards"], "source_url": "https://sonomacleanpower.org/programs/gridsavvyrewards", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Sonoma Clean Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on SCP Rewards | Sonoma Clean Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southern California Edison", "afdc_ids": [13674], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Saving With Electric Vehicles | SCE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13674", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southern California Edison charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southern-california-edison", "provider_unit": "Southern California Edison", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sce.com/residential/ev-overview"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sce-com-residential-ev-overview"], "source_url": "https://www.sce.com/residential/ev-overview", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southern California Edison charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Saving With Electric Vehicles | SCE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tucson Electric Power", "afdc_ids": [13676], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AZ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Tucson Electric Power – Tucson Electric Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13676", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tucson Electric Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tucson-electric-power", "provider_unit": "Tucson Electric Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tep.com/electric-vehicles/#/find/nearest?fuel=ELEC&amp;location=tucson,%20az&amp;ev_levels=all"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-tep-com-electric-vehicles-find-nearest-fuel-elec-amp-location-tucson-20az-amp-ev-levels-all"], "source_url": "https://www.tep.com/electric-vehicles/#/find/nearest?fuel=ELEC&amp;location=tucson,%20az&amp;ev_levels=all", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tucson Electric Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Tucson Electric Power – Tucson Electric Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Wright-Hennepin Cooperative Electric Association", "afdc_ids": [13679], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Explore All Programs & Savings | Wright-Hennepin Cooperative Electric Association. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13679", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Wright-Hennepin Cooperative Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wright-hennepin-cooperative-electric-association", "provider_unit": "Wright-Hennepin Cooperative Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.whe.org/energy-savings-rebates.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-whe-org-energy-savings-rebates-html"], "source_url": "https://www.whe.org/energy-savings-rebates.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Wright-Hennepin Cooperative Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Explore All Programs & Savings | Wright-Hennepin Cooperative Electric Association. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "York Electric Coop", "afdc_ids": [13680], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles York Electric Cooperative, Inc.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13680", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "York Electric Coop charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "york-electric-coop", "provider_unit": "York Electric Coop", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.yorkelectric.net/energy-services/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-yorkelectric-net-energy-services-electric-vehicles"], "source_url": "https://www.yorkelectric.net/energy-services/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "York Electric Coop charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles York Electric Cooperative, Inc.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Connexus Energy", "afdc_ids": [13681], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Electric Vehicle Charging Station Rebate | Time-of-Day Rates | Connexus Energy | Ramsey, MN. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13681", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Connexus Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "connexus-energy", "provider_unit": "Connexus Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.connexusenergy.com/residential/save-money-and-energy/rebates-and-programs/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-connexusenergy-com-residential-save-money-and-energy-rebates-and-programs-electric-vehicles"], "source_url": "https://www.connexusenergy.com/residential/save-money-and-energy/rebates-and-programs/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Connexus Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Electric Vehicle Charging Station Rebate | Time-of-Day Rates | Connexus Energy | Ramsey, MN. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Los Angeles Department of Water and Power", "afdc_ids": [13685], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Los Angeles Department of Water and Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13685", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Los Angeles Department of Water and Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "los-angeles-department-of-water-and-power", "provider_unit": "Los Angeles Department of Water and Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ladwp.com/residential-services/programs-and-rebates-residential/electric-vehicles-evs?_adf_ctrl-state=1d4357epvd_4&amp;_afrLoop=4169220285521&amp;_afrWindowId=null&amp;_afrWindowMode=0"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ladwp-com-residential-services-programs-and-rebates-residential-electric-vehicles-evs-adf-ctrl-state-1d4357epvd-4-amp-afrloop-4169220285521-amp-afrwin"], "source_url": "https://www.ladwp.com/residential-services/programs-and-rebates-residential/electric-vehicles-evs?_adf_ctrl-state=1d4357epvd_4&amp;_afrLoop=4169220285521&amp;_afrWindowId=null&amp;_afrWindowMode=0", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Los Angeles Department of Water and Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Los Angeles Department of Water and Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Pasadena Water & Power", "afdc_ids": [13687], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Pasadena Water and Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13687", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Pasadena Water & Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pasadena-water-power", "provider_unit": "Pasadena Water & Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://pwp.cityofpasadena.net/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-pwp-cityofpasadena-net-ev"], "source_url": "https://pwp.cityofpasadena.net/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Pasadena Water & Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Pasadena Water and Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Turlock Irrigation District", "afdc_ids": [13689], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Saving Tips - TID Water & Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13689", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Turlock Irrigation District charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "turlock-irrigation-district", "provider_unit": "Turlock Irrigation District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tid.org/customer-service/save-energy-money/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-tid-org-customer-service-save-energy-money"], "source_url": "https://www.tid.org/customer-service/save-energy-money/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Turlock Irrigation District charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Saving Tips - TID Water & Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Alaska Power and Telephone", "afdc_ids": [13690], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on AP&T Power Incentive Programs & Rebates. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13690", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Alaska Power and Telephone charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "alaska-power-and-telephone", "provider_unit": "Alaska Power and Telephone", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.aptalaska.com/amp-up/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-aptalaska-com-amp-up"], "source_url": "https://www.aptalaska.com/amp-up/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Alaska Power and Telephone charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on AP&T Power Incentive Programs & Rebates. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Chugach Electric Association", "afdc_ids": [13691], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Chugach Electric Association Inc.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13691", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Chugach Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "chugach-electric-association", "provider_unit": "Chugach Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.chugachelectric.com/energy-solutions/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-chugachelectric-com-energy-solutions-electric-vehicles"], "source_url": "https://www.chugachelectric.com/energy-solutions/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Chugach Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Chugach Electric Association Inc.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Gunnison County Electric Association", "afdc_ids": [13692], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Gunnison County Electric Association. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13692", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Gunnison County Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "gunnison-county-electric-association", "provider_unit": "Gunnison County Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.gcea.coop/energy-efficiency/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-gcea-coop-energy-efficiency-electric-vehicles"], "source_url": "https://www.gcea.coop/energy-efficiency/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Gunnison County Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Gunnison County Electric Association. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Holy Cross Energy", "afdc_ids": [13693], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Member Programs Overview - Holy Cross Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13693", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Holy Cross Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "holy-cross-energy", "provider_unit": "Holy Cross Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.holycross.com/charge-at-home-charge-at-work/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-holycross-com-charge-at-home-charge-at-work"], "source_url": "https://www.holycross.com/charge-at-home-charge-at-work/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Holy Cross Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Member Programs Overview - Holy Cross Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "San Isabel Electric Association", "afdc_ids": [13694], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13694", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "San Isabel Electric Association charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "san-isabel-electric-association", "provider_unit": "San Isabel Electric Association", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://siea.com/empowereveducation/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-siea-com-empowereveducation"], "source_url": "https://siea.com/empowereveducation/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "San Isabel Electric Association charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Norwich Public Utilities", "afdc_ids": [13695], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Norwich Public Utilities, CT | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13695", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Norwich Public Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "norwich-public-utilities", "provider_unit": "Norwich Public Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://norwichpublicutilities.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-norwichpublicutilities-com"], "source_url": "https://norwichpublicutilities.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Norwich Public Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Norwich Public Utilities, CT | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Peninsula Clean Energy", "afdc_ids": [13697], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The original Peninsula Clean Energy URL redirects to WestLight Energy. Preserve original source identity and verify current program-specific terms before reuse.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13697", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Peninsula Clean Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "peninsula-clean-energy", "provider_unit": "Peninsula Clean Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.peninsulacleanenergy.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-peninsulacleanenergy-com"], "source_url": "https://www.peninsulacleanenergy.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Peninsula Clean Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The original Peninsula Clean Energy URL redirects to WestLight Energy. Preserve original source identity and verify current program-specific terms before reuse."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Pepco", "afdc_ids": [13707], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["DC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for DC, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13707", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Pepco charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pepco", "provider_unit": "Pepco", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.pepco.com/smart-energy/innovation-technology"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-pepco-com-smart-energy-innovation-technology"], "source_url": "https://www.pepco.com/smart-energy/innovation-technology", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Pepco charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for DC, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Pepco", "afdc_ids": [13708], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for DC, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13708", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Pepco charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pepco", "provider_unit": "Pepco", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.pepco.com/smart-energy/innovation-technology"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-pepco-com-smart-energy-innovation-technology"], "source_url": "https://www.pepco.com/smart-energy/innovation-technology", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Pepco charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for DC, MD; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Orlando Utilities Commission (OUC)", "afdc_ids": [13710], "afdc_topics": ["EV Charger Deployment Pilot Programs"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Rebates for Appliances & Efficiency Upgrades | Residential & Commercial. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13710", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Orlando Utilities Commission (OUC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "orlando-utilities-commission-ouc", "provider_unit": "Orlando Utilities Commission (OUC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ouc.com/residential/save-energy-water-money/rebates"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ouc-com-residential-save-energy-water-money-rebates"], "source_url": "https://www.ouc.com/residential/save-energy-water-money/rebates", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Orlando Utilities Commission (OUC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Rebates for Appliances & Efficiency Upgrades | Residential & Commercial. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Hawaii Energy", "afdc_ids": [13711], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["HI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Hawaii Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13711", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Hawaii Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "hawaii-energy", "provider_unit": "Hawaii Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://hawaiienergy.com/for-homes/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-hawaiienergy-com-for-homes-electric-vehicles"], "source_url": "https://hawaiienergy.com/for-homes/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Hawaii Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles – Hawaii Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southwestern Electric Power Company (SWEPCO)", "afdc_ids": [13726], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13726", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southwestern-electric-power-company-swepco", "provider_unit": "Southwestern Electric Power Company (SWEPCO)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.swepco.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-swepco-com-clean-energy-electric-cars"], "source_url": "https://www.swepco.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southwestern Electric Power Company (SWEPCO)", "afdc_ids": [13727], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["LA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13727", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southwestern-electric-power-company-swepco", "provider_unit": "Southwestern Electric Power Company (SWEPCO)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.swepco.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-swepco-com-clean-energy-electric-cars"], "source_url": "https://www.swepco.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southwestern Electric Power Company (SWEPCO)", "afdc_ids": [13728], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13728", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southwestern-electric-power-company-swepco", "provider_unit": "Southwestern Electric Power Company (SWEPCO)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.swepco.com/clean-energy/electric-cars/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-swepco-com-clean-energy-electric-cars"], "source_url": "https://www.swepco.com/clean-energy/electric-cars/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southwestern Electric Power Company (SWEPCO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Cars. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Great River Energy", "afdc_ids": [13732], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Charging. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13732", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Great River Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "great-river-energy", "provider_unit": "Great River Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://econdev.greatriverenergy.com/assistance-programs/p/item/2407/electric-vehicle-charging"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-econdev-greatriverenergy-com-assistance-programs-p-item-2407-electric-vehicle-charging"], "source_url": "https://econdev.greatriverenergy.com/assistance-programs/p/item/2407/electric-vehicle-charging", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Great River Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Charging. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Ameren Missouri", "afdc_ids": [13733], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EVs & The Grid - Ameren.com. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13733", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Ameren Missouri charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "ameren-missouri", "provider_unit": "Ameren Missouri", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ameren.com/missouri/company/environment-and-sustainability/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ameren-com-missouri-company-environment-and-sustainability-electric-vehicles"], "source_url": "https://www.ameren.com/missouri/company/environment-and-sustainability/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Ameren Missouri charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EVs & The Grid - Ameren.com. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Nebraska Public Power District (NPPD)", "afdc_ids": [13736], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NE"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EnergyWise | EnergyWise. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13736", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Nebraska Public Power District (NPPD) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "nebraska-public-power-district-nppd", "provider_unit": "Nebraska Public Power District (NPPD)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nppd.com/save-money/incentives-programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nppd-com-save-money-incentives-programs"], "source_url": "https://www.nppd.com/save-money/incentives-programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Nebraska Public Power District (NPPD) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EnergyWise | EnergyWise. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southern Public Power District (SPPD)", "afdc_ids": [13737], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NE"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on GoEV | A goEV incentive is waiting for you.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13737", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southern Public Power District (SPPD) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southern-public-power-district-sppd", "provider_unit": "Southern Public Power District (SPPD)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://southernpd.energywisenebraskagoev.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-southernpd-energywisenebraskagoev-com"], "source_url": "https://southernpd.energywisenebraskagoev.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southern Public Power District (SPPD) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on GoEV | A goEV incentive is waiting for you.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Powering New Mexico", "afdc_ids": [13738], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NM"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on PNM Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13738", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Powering New Mexico charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "powering-new-mexico", "provider_unit": "Powering New Mexico", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.pnm.com/evoffer"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-pnm-com-evoffer"], "source_url": "https://www.pnm.com/evoffer", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Powering New Mexico charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on PNM Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "NYSEG", "afdc_ids": [13739], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13739", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "NYSEG charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "nyseg", "provider_unit": "NYSEG", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nyseg.com/en/smartenergy/electricvehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nyseg-com-en-smartenergy-electricvehicles"], "source_url": "https://www.nyseg.com/en/smartenergy/electricvehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "NYSEG charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Orange & Rockland Utilities (O&R)", "afdc_ids": [13740], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles Incentives and Charging Programs | Orange & Rockland. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13740", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Orange & Rockland Utilities (O&R) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "orange-rockland-utilities-o-r", "provider_unit": "Orange & Rockland Utilities (O&R)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.oru.com/en/our-energy-future/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-oru-com-en-our-energy-future-electric-vehicles"], "source_url": "https://www.oru.com/en/our-energy-future/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Orange & Rockland Utilities (O&R) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles Incentives and Charging Programs | Orange & Rockland. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Orange & Rockland Utilities (O&R)", "afdc_ids": [13741], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles Incentives and Charging Programs | Orange & Rockland. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13741", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Orange & Rockland Utilities (O&R) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "orange-rockland-utilities-o-r", "provider_unit": "Orange & Rockland Utilities (O&R)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.oru.com/en/our-energy-future/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-oru-com-en-our-energy-future-electric-vehicles"], "source_url": "https://www.oru.com/en/our-energy-future/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Orange & Rockland Utilities (O&R) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles Incentives and Charging Programs | Orange & Rockland. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Rochester Gas and Electric (RG&E)", "afdc_ids": [13742], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13742", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Rochester Gas and Electric (RG&E) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "rochester-gas-and-electric-rg-e", "provider_unit": "Rochester Gas and Electric (RG&E)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.rge.com/en/electric-vehicles1"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-rge-com-en-electric-vehicles1"], "source_url": "https://www.rge.com/en/electric-vehicles1", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Rochester Gas and Electric (RG&E) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for NY; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Cape Hatteras Electric Cooperative (CHEC)", "afdc_ids": [13744], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Cape Hatteras Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13744", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Cape Hatteras Electric Cooperative (CHEC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cape-hatteras-electric-cooperative-chec", "provider_unit": "Cape Hatteras Electric Cooperative (CHEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.chec.coop/ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-chec-coop-ev"], "source_url": "https://www.chec.coop/ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Cape Hatteras Electric Cooperative (CHEC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Cape Hatteras Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Eugene Water & Electric Board (EWEB)", "afdc_ids": [13752], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Mobility | EWEB. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13752", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Eugene Water & Electric Board (EWEB) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "eugene-water-electric-board-eweb", "provider_unit": "Eugene Water & Electric Board (EWEB)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.eweb.org/ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-eweb-org-ev"], "source_url": "https://www.eweb.org/ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Eugene Water & Electric Board (EWEB) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Mobility | EWEB. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Central Lincoln", "afdc_ids": [13754], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency – Central Lincoln. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13754", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Central Lincoln charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "central-lincoln", "provider_unit": "Central Lincoln", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://clpud.org/energy-efficiency/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-clpud-org-energy-efficiency"], "source_url": "https://clpud.org/energy-efficiency/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Central Lincoln charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency – Central Lincoln. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Consumers Power Inc. (CPI)", "afdc_ids": [13755], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for OR; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13755", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Consumers Power Inc. (CPI) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "consumers-power-inc-cpi", "provider_unit": "Consumers Power Inc. (CPI)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.directefficiency.com/cpi-level-2-electric-vehicle-charger-rebate/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-directefficiency-com-cpi-level-2-electric-vehicle-charger-rebate"], "source_url": "https://www.directefficiency.com/cpi-level-2-electric-vehicle-charger-rebate/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Consumers Power Inc. (CPI) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for OR; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "PECO Energy Company", "afdc_ids": [13756], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["PA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for PA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13756", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "PECO Energy Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "peco-energy-company", "provider_unit": "PECO Energy Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.peco.com/smart-energy/innovation-technology/electric-vehicles-l3"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-peco-com-smart-energy-innovation-technology-electric-vehicles-l3"], "source_url": "https://www.peco.com/smart-energy/innovation-technology/electric-vehicles-l3", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "PECO Energy Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for PA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13757], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13757", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13758], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13758", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13759], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["KY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13759", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13760], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MS"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13760", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13761], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13761", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13762], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13762", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tennessee Valley Authority (TVA)", "afdc_ids": [13763], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13763", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-valley-authority-tva", "provider_unit": "Tennessee Valley Authority (TVA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://energyright.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-energyright-com-ev"], "source_url": "https://energyright.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tennessee Valley Authority (TVA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on All About Electric Vehicles - TVA EnergyRight. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "United Cooperative Services (UCS)", "afdc_ids": [13766], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Rebate Programs | United Cooperative Services. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13766", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "United Cooperative Services (UCS) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "united-cooperative-services-ucs", "provider_unit": "United Cooperative Services (UCS)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://ucs.net/rebate-programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-ucs-net-rebate-programs"], "source_url": "https://ucs.net/rebate-programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "United Cooperative Services (UCS) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Rebate Programs | United Cooperative Services. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont Electric Co-op (VEC)", "afdc_ids": [13767], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Transformation Programs — Vermont Electric Coop. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13767", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Vermont Electric Co-op (VEC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-electric-co-op-vec", "provider_unit": "Vermont Electric Co-op (VEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://vermontelectric.coop/energy-transformation-programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-vermontelectric-coop-energy-transformation-programs"], "source_url": "https://vermontelectric.coop/energy-transformation-programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vermont Electric Co-op (VEC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Transformation Programs — Vermont Electric Coop. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vermont Public Power Supply Authority (VPPSA)", "afdc_ids": [13770], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on 2025 VPPSA Rebates & Incentives – VPPSA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13770", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Vermont Public Power Supply Authority (VPPSA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vermont-public-power-supply-authority-vppsa", "provider_unit": "Vermont Public Power Supply Authority (VPPSA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://vppsa.com/resources/rebate-forms/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-vppsa-com-resources-rebate-forms"], "source_url": "https://vppsa.com/resources/rebate-forms/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vermont Public Power Supply Authority (VPPSA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on 2025 VPPSA Rebates & Incentives – VPPSA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13771], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["ID"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13771", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13772], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13772", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13773], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13773", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13774], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13774", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13775], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["VA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13775", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dominion Energy", "afdc_ids": [13776], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WY"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13776", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dominion Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dominion-energy", "provider_unit": "Dominion Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dominionenergy-com-virginia-save-energy-electric-vehicles-residential-charger-program"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/residential-charger-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dominion Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["The retrieved page is Dominion Virginia home-charger financing, not a cash rebate for every Dominion operating territory."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tacoma Public Utility (TPU)", "afdc_ids": [13777], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Charging - Tacoma Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13777", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tacoma Public Utility (TPU) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tacoma-public-utility-tpu", "provider_unit": "Tacoma Public Utility (TPU)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mytpu.org/ways-to-save/residential-incentives/ev-charging/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mytpu-org-ways-to-save-residential-incentives-ev-charging"], "source_url": "https://www.mytpu.org/ways-to-save/residential-incentives/ev-charging/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tacoma Public Utility (TPU) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Charging - Tacoma Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Clark Public Utilities (CPU)", "afdc_ids": [13778], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Program - Clark Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13778", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Clark Public Utilities (CPU) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "clark-public-utilities-cpu", "provider_unit": "Clark Public Utilities (CPU)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.clarkpublicutilities.com/residential-customers/reduce-energy-waste-and-lower-your-bill/all-rebates-incentives-and-low-interest-loans/electric-vehicle-program/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-clarkpublicutilities-com-residential-customers-reduce-energy-waste-and-lower-your-bill-all-rebates-incentives-and-low-interest-loans-electric-vehicle-"], "source_url": "https://www.clarkpublicutilities.com/residential-customers/reduce-energy-waste-and-lower-your-bill/all-rebates-incentives-and-low-interest-loans/electric-vehicle-program/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Clark Public Utilities (CPU) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Program - Clark Public Utilities. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Snohomish Public Utility District", "afdc_ids": [13779], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - Snohomish County PUD. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13779", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Snohomish Public Utility District charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "snohomish-public-utility-district", "provider_unit": "Snohomish Public Utility District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.snopud.com/save-energy/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-snopud-com-save-energy-electric-vehicles"], "source_url": "https://www.snopud.com/save-energy/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Snohomish Public Utility District charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - Snohomish County PUD. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Central Coast Community Energy", "afdc_ids": [13791], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Rebates & Incentives - Central Coast Community Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13791", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Central Coast Community Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "central-coast-community-energy", "provider_unit": "Central Coast Community Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://3cenergy.org/rebates-incentives/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-3cenergy-org-rebates-incentives"], "source_url": "https://3cenergy.org/rebates-incentives/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Central Coast Community Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Rebates & Incentives - Central Coast Community Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Firelands Electric Cooperative (FEC)", "afdc_ids": [13792], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Charger Rebates | Firelands Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13792", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Firelands Electric Cooperative (FEC) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "firelands-electric-cooperative-fec", "provider_unit": "Firelands Electric Cooperative (FEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.firelandsec.com/electric-vehicle-charger-rebates"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-firelandsec-com-electric-vehicle-charger-rebates"], "source_url": "https://www.firelandsec.com/electric-vehicle-charger-rebates", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Firelands Electric Cooperative (FEC) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle Charger Rebates | Firelands Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "PSE&G", "afdc_ids": [13793], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle (EV) Charging Program - PSE&G. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13793", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "PSE&G charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pse-g", "provider_unit": "PSE&G", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nj.myaccount.pseg.com/myservicepublic/electricvehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-nj-myaccount-pseg-com-myservicepublic-electricvehicles"], "source_url": "https://nj.myaccount.pseg.com/myservicepublic/electricvehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "PSE&G charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle (EV) Charging Program - PSE&G. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Atlantic City Electric (ACE)", "afdc_ids": [13795], "afdc_topics": ["Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NJ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for NJ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13795", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Atlantic City Electric (ACE) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "atlantic-city-electric-ace", "provider_unit": "Atlantic City Electric (ACE)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.atlanticcityelectric.com/SmartEnergy/InnovationAndTechnology/Pages/ElectricVehicleProgram.aspx"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-atlanticcityelectric-com-smartenergy-innovationandtechnology-pages-electricvehicleprogram-aspx"], "source_url": "https://www.atlanticcityelectric.com/SmartEnergy/InnovationAndTechnology/Pages/ElectricVehicleProgram.aspx", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Atlantic City Electric (ACE) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for NJ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tampa Electric Company (TECO)", "afdc_ids": [13797], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13797", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tampa Electric Company (TECO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tampa-electric-company-teco", "provider_unit": "Tampa Electric Company (TECO)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tampaelectric.com/electricvehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-tampaelectric-com-electricvehicles"], "source_url": "https://www.tampaelectric.com/electricvehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tampa Electric Company (TECO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Mississippi Power", "afdc_ids": [13800], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MS"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Mississippi Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13800", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Mississippi Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mississippi-power", "provider_unit": "Mississippi Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mississippipower.com/residential/products-and-services/electric-vehicles.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mississippipower-com-residential-products-and-services-electric-vehicles-html"], "source_url": "https://www.mississippipower.com/residential/products-and-services/electric-vehicles.html", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Mississippi Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Mississippi Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southern Maryland Electric Cooperative (SMECO)", "afdc_ids": [13801], "afdc_topics": ["EV Charger Deployment Pilot Programs"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MD"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Going electric? Start here. – Southern Maryland Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13801", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southern Maryland Electric Cooperative (SMECO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southern-maryland-electric-cooperative-smeco", "provider_unit": "Southern Maryland Electric Cooperative (SMECO)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.smeco.coop/services/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-smeco-coop-services-electric-vehicles"], "source_url": "https://www.smeco.coop/services/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southern Maryland Electric Cooperative (SMECO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Going electric? Start here. – Southern Maryland Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Great Lakes Energy", "afdc_ids": [13802], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Wise - Great Lakes Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13802", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Great Lakes Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "great-lakes-energy", "provider_unit": "Great Lakes Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.gtlakes.com/energy-wise/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-gtlakes-com-energy-wise"], "source_url": "https://www.gtlakes.com/energy-wise/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Great Lakes Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Wise - Great Lakes Energy. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Kirkwood Electric", "afdc_ids": [13804], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for MO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13804", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Kirkwood Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "kirkwood-electric", "provider_unit": "Kirkwood Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.kirkwoodelectric.org/residential/energy-efficiency"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-kirkwoodelectric-org-residential-energy-efficiency"], "source_url": "https://www.kirkwoodelectric.org/residential/energy-efficiency", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Kirkwood Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for MO; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Mohave Electric Cooperative (MEH)", "afdc_ids": [13806], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["AZ"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for AZ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13806", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Mohave Electric Cooperative (MEH) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mohave-electric-cooperative-meh", "provider_unit": "Mohave Electric Cooperative (MEH)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mohaveelectric.com/energy-solutions/rebates/mohave-charged-rebates/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mohaveelectric-com-energy-solutions-rebates-mohave-charged-rebates"], "source_url": "https://www.mohaveelectric.com/energy-solutions/rebates/mohave-charged-rebates/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Mohave Electric Cooperative (MEH) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for AZ; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Silicon Valley Power", "afdc_ids": [13808], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13808", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Silicon Valley Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "silicon-valley-power", "provider_unit": "Silicon Valley Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.siliconvalleypower.com/residents/electrification-programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-siliconvalleypower-com-residents-electrification-programs"], "source_url": "https://www.siliconvalleypower.com/residents/electrification-programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Silicon Valley Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Presque Isle Electric & Gas Co-Op", "afdc_ids": [13809], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Optimization & Rebates - Presque Isle Electric & Gas Co-Op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13809", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Presque Isle Electric & Gas Co-Op charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "presque-isle-electric-gas-co-op", "provider_unit": "Presque Isle Electric & Gas Co-Op", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://pieg.com/energy-optimization-rebates/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-pieg-com-energy-optimization-rebates"], "source_url": "https://pieg.com/energy-optimization-rebates/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Presque Isle Electric & Gas Co-Op charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Optimization & Rebates - Presque Isle Electric & Gas Co-Op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Cherryland Electric Cooperative", "afdc_ids": [13810], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV - Cherryland Electric Co-op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13810", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Cherryland Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cherryland-electric-cooperative", "provider_unit": "Cherryland Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cherrylandelectric.coop/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-cherrylandelectric-coop-ev"], "source_url": "https://cherrylandelectric.coop/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Cherryland Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV - Cherryland Electric Co-op. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Shrewsbury Electric and Cable Operations (SELCO)", "afdc_ids": [13813], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Rebate - Shrewsbury Electric & Cable Operations. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13813", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Shrewsbury Electric and Cable Operations (SELCO) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "shrewsbury-electric-and-cable-operations", "provider_unit": "Shrewsbury Electric and Cable Operations", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.selco.shrewsburyma.gov/ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-selco-shrewsburyma-gov-ev"], "source_url": "https://www.selco.shrewsburyma.gov/ev", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Shrewsbury Electric and Cable Operations (SELCO) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Rebate - Shrewsbury Electric & Cable Operations. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Seattle City Light", "afdc_ids": [13814], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Business EV Charging Program - City Light | seattle.gov. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13814", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Seattle City Light charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "seattle-city-light", "provider_unit": "Seattle City Light", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.seattle.gov/city-light/business-solutions/renewable-energy-services/fleet-electrification-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-seattle-gov-city-light-business-solutions-renewable-energy-services-fleet-electrification-program"], "source_url": "https://www.seattle.gov/city-light/business-solutions/renewable-energy-services/fleet-electrification-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Seattle City Light charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Business EV Charging Program - City Light | seattle.gov. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "San Francisco Public Utilities Commission", "afdc_ids": [13818], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Charge SF. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13818", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "San Francisco Public Utilities Commission charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "san-francisco-public-utilities-commission", "provider_unit": "San Francisco Public Utilities Commission", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sfpuc.org/programs/clean-energy/ev-charge-sf"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sfpuc-org-programs-clean-energy-ev-charge-sf"], "source_url": "https://www.sfpuc.org/programs/clean-energy/ev-charge-sf", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "San Francisco Public Utilities Commission charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Charge SF. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Commonwealth Edison (ComEd) Company", "afdc_ids": [13819], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13819", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "commonwealth-edison-comed-company", "provider_unit": "Commonwealth Edison (ComEd) Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-comed-com-about-us-clean-energy-residential-clean-energy"], "source_url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Commonwealth Edison (ComEd) Company", "afdc_ids": [13820], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13820", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "commonwealth-edison-comed-company", "provider_unit": "Commonwealth Edison (ComEd) Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-comed-com-about-us-clean-energy-residential-clean-energy"], "source_url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Commonwealth Edison (ComEd) Company", "afdc_ids": [13821], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13821", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "commonwealth-edison-comed-company", "provider_unit": "Commonwealth Edison (ComEd) Company", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-comed-com-about-us-clean-energy-residential-clean-energy"], "source_url": "https://www.comed.com/about-us/clean-energy/residential-clean-energy", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Commonwealth Edison (ComEd) Company charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Avista", "afdc_ids": [13824], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Transportation | Avista. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13824", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Avista charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "avista", "provider_unit": "Avista", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.myavista.com/energy-savings/electric-transportation/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-myavista-com-energy-savings-electric-transportation"], "source_url": "https://www.myavista.com/energy-savings/electric-transportation/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Avista charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Transportation | Avista. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Seattle", "afdc_ids": [13872], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Seattle.gov Home. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13872", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Seattle charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-seattle", "provider_unit": "City of Seattle", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.seattle.gov/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-seattle-gov"], "source_url": "https://www.seattle.gov/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Seattle charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Seattle.gov Home. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "PUD Number 1 of Snohomish County", "afdc_ids": [13874], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Snohomish County PUD. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13874", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "PUD Number 1 of Snohomish County charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pud-number-1-of-snohomish-county", "provider_unit": "PUD Number 1 of Snohomish County", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.snopud.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-snopud-com"], "source_url": "https://www.snopud.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "PUD Number 1 of Snohomish County charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Snohomish County PUD. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Tanner Electric Cooperative", "afdc_ids": [13877], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Tanner Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13877", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Tanner Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tanner-electric-cooperative", "provider_unit": "Tanner Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "http://www.tannerelectric.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-http-www-tannerelectric-coop"], "source_url": "http://www.tannerelectric.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Tanner Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Tanner Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Diverse Power Incorporated", "afdc_ids": [13897], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Diverse Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13897", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Diverse Power Incorporated charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "diverse-power-incorporated", "provider_unit": "Diverse Power Incorporated", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.diversepower.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-diversepower-com"], "source_url": "https://www.diversepower.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Diverse Power Incorporated charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Diverse Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Carroll Electric Member Corporation (GA)", "afdc_ids": [13903], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - Carroll EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13903", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Carroll Electric Member Corporation (GA) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "carroll-electric-member-corporation-ga", "provider_unit": "Carroll Electric Member Corporation (GA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://carrollemc.com/ev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-carrollemc-com-ev"], "source_url": "https://carrollemc.com/ev/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Carroll Electric Member Corporation (GA) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - Carroll EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Cobb Electric Membership Corporation", "afdc_ids": [13906], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV charging for business | Cobb EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13906", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Cobb Electric Membership Corporation charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cobb-electric-membership-corporation", "provider_unit": "Cobb Electric Membership Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cobbemc.com/ev-charging-business"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-cobbemc-com-ev-charging-business"], "source_url": "https://cobbemc.com/ev-charging-business", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Cobb Electric Membership Corporation charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV charging for business | Cobb EMC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Guadalupe Valley Electric Coop", "afdc_ids": [13967], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - GVEC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-13967", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Guadalupe Valley Electric Coop charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "guadalupe-valley-electric-coop", "provider_unit": "Guadalupe Valley Electric Coop", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.gvec.org/electric/electric-vehicles-2/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-gvec-org-electric-electric-vehicles-2"], "source_url": "https://www.gvec.org/electric/electric-vehicles-2/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Guadalupe Valley Electric Coop charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - GVEC. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Norwalk Third Taxing District", "afdc_ids": [14007], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Third Taxing District | East Norwalk Electric Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14007", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Norwalk Third Taxing District charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "norwalk-third-taxing-district", "provider_unit": "Norwalk Third Taxing District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://ttd.gov/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-ttd-gov"], "source_url": "https://ttd.gov/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Norwalk Third Taxing District charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Third Taxing District | East Norwalk Electric Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "South Norwalk Electric and Water", "afdc_ids": [14008], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CT"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on SNEW: South Norwalk Electric and Water. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14008", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "South Norwalk Electric and Water charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "south-norwalk-electric-and-water", "provider_unit": "South Norwalk Electric and Water", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.snew.org/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-snew-org"], "source_url": "https://www.snew.org/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "South Norwalk Electric and Water charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on SNEW: South Norwalk Electric and Water. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "United Power", "afdc_ids": [14014], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | United Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14014", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "United Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "united-power", "provider_unit": "United Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.unitedpower.com/EV"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-unitedpower-com-ev"], "source_url": "https://www.unitedpower.com/EV", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "United Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | United Power. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "CORE Electric Cooperative", "afdc_ids": [14015], "afdc_topics": ["EV Charger Deployment Pilot Programs", "EV Level 2 Charging Station Installation Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - CORE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14015", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "CORE Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "core-electric-cooperative", "provider_unit": "CORE Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://core.coop/electric-vehicles/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-core-coop-electric-vehicles"], "source_url": "https://core.coop/electric-vehicles/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "CORE Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles - CORE. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Osage Valley Electric Cooperative", "afdc_ids": [14022], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Osage Valley Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14022", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Osage Valley Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "osage-valley-electric-cooperative", "provider_unit": "Osage Valley Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.osagevalley.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-osagevalley-com"], "source_url": "https://www.osagevalley.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Osage Valley Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Osage Valley Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Platte-Clay Energy Cooperative", "afdc_ids": [14023], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home » Platte-Clay Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14023", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Platte-Clay Energy Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "platte-clay-energy-cooperative", "provider_unit": "Platte-Clay Energy Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://pcec.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-pcec-coop"], "source_url": "https://pcec.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Platte-Clay Energy Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home » Platte-Clay Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Three Rivers Electric Cooperative", "afdc_ids": [14025], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Three Rivers Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14025", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Three Rivers Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "three-rivers-electric-cooperative", "provider_unit": "Three Rivers Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.threeriverselectric.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-threeriverselectric-com"], "source_url": "https://www.threeriverselectric.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Three Rivers Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Three Rivers Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "West Central Electric Cooperative, Inc.", "afdc_ids": [14026], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | West Central Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14026", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "West Central Electric Cooperative, Inc. charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "west-central-electric-cooperative-inc", "provider_unit": "West Central Electric Cooperative, Inc.", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://westcentralelectric.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-westcentralelectric-coop"], "source_url": "https://westcentralelectric.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "West Central Electric Cooperative, Inc. charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | West Central Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Cuivre River Electric Cooperative", "afdc_ids": [14029], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Cuivre River Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14029", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Cuivre River Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cuivre-river-electric-cooperative", "provider_unit": "Cuivre River Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cuivre.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-cuivre-com"], "source_url": "https://www.cuivre.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Cuivre River Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Cuivre River Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Farmers' Electric Cooperative", "afdc_ids": [14030], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Farmers' Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14030", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Farmers' Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "farmers-electric-cooperative", "provider_unit": "Farmers' Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.fec-co.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-fec-co-com"], "source_url": "https://www.fec-co.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Farmers' Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Farmers' Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Minnesota Valley Electric Cooperative", "afdc_ids": [14038], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Homepage - Minnesota Valley Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14038", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Minnesota Valley Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "minnesota-valley-electric-cooperative", "provider_unit": "Minnesota Valley Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mvec.net/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mvec-net"], "source_url": "https://www.mvec.net/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Minnesota Valley Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Homepage - Minnesota Valley Electric. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Buffalo Utilities", "afdc_ids": [14042], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle (EV) Info | Buffalo, MN. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14042", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Buffalo Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-buffalo-utilities", "provider_unit": "City of Buffalo Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://ci.buffalo.mn.us/679/Electric-Vehicle-EV-Info"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-ci-buffalo-mn-us-679-electric-vehicle-ev-info"], "source_url": "https://ci.buffalo.mn.us/679/Electric-Vehicle-EV-Info", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Buffalo Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicle (EV) Info | Buffalo, MN. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Chaska", "afdc_ids": [14043], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Chaska, MN - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14043", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Chaska charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-chaska", "provider_unit": "City of Chaska", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.chaskamn.gov/782/Electric-Vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-chaskamn-gov-782-electric-vehicles"], "source_url": "https://www.chaskamn.gov/782/Electric-Vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Chaska charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Electric Vehicles | Chaska, MN - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Anoka", "afdc_ids": [14046], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Anoka, MN | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14046", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Anoka charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-anoka", "provider_unit": "City of Anoka", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.anokaminnesota.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-anokaminnesota-com"], "source_url": "https://www.anokaminnesota.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Anoka charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Anoka, MN | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Central Rural Electric Cooperative", "afdc_ids": [14072], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Central Rural Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14072", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Central Rural Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "central-rural-electric-cooperative", "provider_unit": "Central Rural Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://mycentral.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-mycentral-coop"], "source_url": "https://mycentral.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Central Rural Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Central Rural Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "CKenergy Electric Cooperative", "afdc_ids": [14077], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency - EV Project — CK Energy Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14077", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "CKenergy Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "ckenergy-electric-cooperative", "provider_unit": "CKenergy Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ckenergy.coop/energy-efficiency-ev-project"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-ckenergy-coop-energy-efficiency-ev-project"], "source_url": "https://www.ckenergy.coop/energy-efficiency-ev-project", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "CKenergy Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency - EV Project — CK Energy Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Cleco Power LLC", "afdc_ids": [14083], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["LA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for LA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14083", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Cleco Power LLC charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cleco-power-llc", "provider_unit": "Cleco Power LLC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cleco.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-cleco-com"], "source_url": "https://www.cleco.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Cleco Power LLC charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for LA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Consolidated Electric Coop, Inc.", "afdc_ids": [14111], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Main – Consolidated Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14111", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Consolidated Electric Coop, Inc. charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "consolidated-electric-coop-inc", "provider_unit": "Consolidated Electric Coop, Inc.", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.consolidated.coop/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-consolidated-coop"], "source_url": "https://www.consolidated.coop/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Consolidated Electric Coop, Inc. charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Main – Consolidated Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Licking Rural Electric Inc.", "afdc_ids": [14114], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | The Energy Cooperative.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14114", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Licking Rural Electric Inc. charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "licking-rural-electric-inc", "provider_unit": "Licking Rural Electric Inc.", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://myenergycoop.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-myenergycoop-com"], "source_url": "https://myenergycoop.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Licking Rural Electric Inc. charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | The Energy Cooperative.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Pioneer Rural Electric Coop Inc. (OH)", "afdc_ids": [14118], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Homepage | Pioneer Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14118", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Pioneer Rural Electric Coop Inc. (OH) charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "pioneer-rural-electric-coop-inc-oh", "provider_unit": "Pioneer Rural Electric Coop Inc. (OH)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://pioneerec.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-pioneerec-com"], "source_url": "https://pioneerec.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Pioneer Rural Electric Coop Inc. (OH) charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Homepage | Pioneer Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Union Rural Electric Coop, Inc", "afdc_ids": [14122], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OH"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for OH; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14122", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Union Rural Electric Coop, Inc charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "union-rural-electric-coop-inc", "provider_unit": "Union Rural Electric Coop, Inc", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://ure.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-ure-com"], "source_url": "https://ure.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Union Rural Electric Coop, Inc charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for OH; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Mansfield Municipal Electric", "afdc_ids": [14131], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for MA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14131", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Mansfield Municipal Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mansfield-municipal-electric", "provider_unit": "Mansfield Municipal Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.mansfieldelectric.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-mansfieldelectric-com"], "source_url": "https://www.mansfieldelectric.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Mansfield Municipal Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for MA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "North Attleborough Electric Department", "afdc_ids": [14134], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on NAED Electric Vehicle Charger Rebate Application  | North Attleborough Electric, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14134", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "North Attleborough Electric Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "north-attleborough-electric-department", "provider_unit": "North Attleborough Electric Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.naelectric.com/289/NAED-Electric-Vehicle-Charger-Rebate-App"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-naelectric-com-289-naed-electric-vehicle-charger-rebate-app"], "source_url": "https://www.naelectric.com/289/NAED-Electric-Vehicle-Charger-Rebate-App", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "North Attleborough Electric Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on NAED Electric Vehicle Charger Rebate Application  | North Attleborough Electric, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Belmont Light", "afdc_ids": [14135], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Welcome to Belmont Light | Belmont Light. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14135", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Belmont Light charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "belmont-light", "provider_unit": "Belmont Light", "published_date": null, "references": [{"description": "Primary administrator source", "url": "http://www.belmontlight.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-http-www-belmontlight-com"], "source_url": "http://www.belmontlight.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Belmont Light charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Welcome to Belmont Light | Belmont Light. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Reading Municipal Light Department", "afdc_ids": [14136], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on RMLD, MA | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14136", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Reading Municipal Light Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "reading-municipal-light-department", "provider_unit": "Reading Municipal Light Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.rmld.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-rmld-com"], "source_url": "https://www.rmld.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Reading Municipal Light Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on RMLD, MA | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Taunton Municipal Light Plant", "afdc_ids": [14137], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on TMLP, MA | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14137", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Taunton Municipal Light Plant charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "taunton-municipal-light-plant", "provider_unit": "Taunton Municipal Light Plant", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tmlp.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-tmlp-com"], "source_url": "https://www.tmlp.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Taunton Municipal Light Plant charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on TMLP, MA | Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Wakefield Municipal Gas & Light", "afdc_ids": [14138], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home - Wakefield Municipal Gas & Light Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14138", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Wakefield Municipal Gas & Light charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wakefield-municipal-gas-light", "provider_unit": "Wakefield Municipal Gas & Light", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://wmgld.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-wmgld-com"], "source_url": "https://wmgld.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Wakefield Municipal Gas & Light charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home - Wakefield Municipal Gas & Light Department. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Concord Municipal Light", "afdc_ids": [14139], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Municipal Light Plant | Concord, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14139", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Concord Municipal Light charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "concord-municipal-light", "provider_unit": "Concord Municipal Light", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://concordma.gov/464/Municipal-Light-Plant#:~:text=Concord%20Municipal%20Light%20Plant%20(CMLP)%20is%20a%20municipal-owned"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-concordma-gov-464-municipal-light-plant-text-concord-20municipal-20light-20plant-20-cmlp-20is-20a-20municipal-owned"], "source_url": "https://concordma.gov/464/Municipal-Light-Plant#:~:text=Concord%20Municipal%20Light%20Plant%20(CMLP)%20is%20a%20municipal-owned", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Concord Municipal Light charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Municipal Light Plant | Concord, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Danvers Electric", "afdc_ids": [14140], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Conservation and Rebates  | Danvers, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14140", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Danvers Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "danvers-electric", "provider_unit": "Danvers Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.danversma.gov/272/Energy-Conservation-and-Rebates"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-danversma-gov-272-energy-conservation-and-rebates"], "source_url": "https://www.danversma.gov/272/Energy-Conservation-and-Rebates", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Danvers Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Conservation and Rebates  | Danvers, MA. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Hingham Municipal Light Plant", "afdc_ids": [14143], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Hingham Municipal Lighting Plant | A resident owned municipally run electric utility established to  \tprovide low cost, safe, reliable electricity to the residents of Hingham with a high level of service and customer satisfaction.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14143", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Hingham Municipal Light Plant charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "hingham-municipal-light-plant", "provider_unit": "Hingham Municipal Light Plant", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.hmlp.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-hmlp-com"], "source_url": "https://www.hmlp.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Hingham Municipal Light Plant charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Hingham Municipal Lighting Plant | A resident owned municipally run electric utility established to  \tprovide low cost, safe, reliable electricity to the residents of Hingham with a high level of service and customer satisfaction.. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Hudson Light and Power", "afdc_ids": [14144], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Municipal Power Provider | Hudson Light & Power | Hudson. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14144", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Hudson Light and Power charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "hudson-light-and-power", "provider_unit": "Hudson Light and Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.hudsonlight.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-hudsonlight-com"], "source_url": "https://www.hudsonlight.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Hudson Light and Power charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Municipal Power Provider | Hudson Light & Power | Hudson. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Marblehead Electric CO", "afdc_ids": [14146], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Welcome to. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14146", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Marblehead Electric CO charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "marblehead-electric-co", "provider_unit": "Marblehead Electric CO", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://marbleheadelectric.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-marbleheadelectric-com"], "source_url": "https://marbleheadelectric.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Marblehead Electric CO charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Welcome to. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Naperville", "afdc_ids": [14152], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14152", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Naperville charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-naperville", "provider_unit": "City of Naperville", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-naperville-il-us-government-city-finances-utility-services-and-billing"], "source_url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Naperville charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Naperville", "afdc_ids": [14153], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14153", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Naperville charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-naperville", "provider_unit": "City of Naperville", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-naperville-il-us-government-city-finances-utility-services-and-billing"], "source_url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Naperville charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Naperville", "afdc_ids": [14154], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14154", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Naperville charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-naperville", "provider_unit": "City of Naperville", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-naperville-il-us-government-city-finances-utility-services-and-billing"], "source_url": "https://www.naperville.il.us/government/city-finances/utility-services-and-billing/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Naperville charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Utility Services and Billing | The City of Naperville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Batavia", "afdc_ids": [14155], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14155", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Batavia charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-batavia", "provider_unit": "City of Batavia", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-bataviail-gov-o-pw-page-electric-vehicle-home-charging-station-rebate-program"], "source_url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Batavia charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Batavia", "afdc_ids": [14156], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IN"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14156", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Batavia charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-batavia", "provider_unit": "City of Batavia", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-bataviail-gov-o-pw-page-electric-vehicle-home-charging-station-rebate-program"], "source_url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Batavia charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Batavia", "afdc_ids": [14157], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14157", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Batavia charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-batavia", "provider_unit": "City of Batavia", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-bataviail-gov-o-pw-page-electric-vehicle-home-charging-station-rebate-program"], "source_url": "https://www.bataviail.gov/o/pw/page/electric-vehicle-home-charging-station-rebate-program", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Batavia charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for IL, IN, WI; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southwestern Electric Cooperative", "afdc_ids": [14160], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Southwestern Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14160", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southwestern Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southwestern-electric-cooperative", "provider_unit": "Southwestern Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sweci.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sweci-com"], "source_url": "https://www.sweci.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southwestern Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Southwestern Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Southwestern Electric Cooperative", "afdc_ids": [14161], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Southwestern Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14161", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Southwestern Electric Cooperative charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "southwestern-electric-cooperative", "provider_unit": "Southwestern Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sweci.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sweci-com"], "source_url": "https://www.sweci.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Southwestern Electric Cooperative charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Southwestern Electric Cooperative, Inc. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Imperial Irrigation District", "afdc_ids": [14195], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14195", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Imperial Irrigation District charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "imperial-irrigation-district", "provider_unit": "Imperial Irrigation District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.iid.com/customer-service/save-energy-and-money/your-vehicle"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-iid-com-customer-service-save-energy-and-money-your-vehicle"], "source_url": "https://www.iid.com/customer-service/save-energy-and-money/your-vehicle", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Imperial Irrigation District charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Palo Alto Utilities Department", "afdc_ids": [14198], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14198", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Palo Alto Utilities Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "palo-alto-utilities-department", "provider_unit": "Palo Alto Utilities Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.paloalto.gov/Departments/Utilities/Sustainability/Ways-to-Save"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-paloalto-gov-departments-utilities-sustainability-ways-to-save"], "source_url": "https://www.paloalto.gov/Departments/Utilities/Sustainability/Ways-to-Save", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Palo Alto Utilities Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Rancho Cucamonga Municipal Utility", "afdc_ids": [14200], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Welcome to RCMU | City of Rancho Cucamonga. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14200", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Rancho Cucamonga Municipal Utility charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "rancho-cucamonga-municipal-utility", "provider_unit": "Rancho Cucamonga Municipal Utility", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cityofrc.us/rcmu"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-cityofrc-us-rcmu"], "source_url": "https://www.cityofrc.us/rcmu", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Rancho Cucamonga Municipal Utility charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Welcome to RCMU | City of Rancho Cucamonga. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Roseville Electric", "afdc_ids": [14201], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on City of Roseville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14201", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Roseville Electric charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "roseville-electric", "provider_unit": "Roseville Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.roseville.ca.gov/electric_utility/index.php"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-roseville-ca-gov-electric-utility-index-php"], "source_url": "https://www.roseville.ca.gov/electric_utility/index.php", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Roseville Electric charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on City of Roseville. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Vernon Gas & Electric Department", "afdc_ids": [14202], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14202", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Vernon Gas & Electric Department charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "vernon-gas-electric-department", "provider_unit": "Vernon Gas & Electric Department", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cityofvernon.org/government/public-utilities/customer-service/rebates-and-incentives/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-cityofvernon-org-government-public-utilities-customer-service-rebates-and-incentives-electric-vehicles"], "source_url": "https://www.cityofvernon.org/government/public-utilities/customer-service/rebates-and-incentives/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Vernon Gas & Electric Department charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "CleanPowerSF", "afdc_ids": [14206], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate", "Make-Ready or Pre-Wiring Rebate for EV Chargers"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on EV Charge SF. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14206", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "CleanPowerSF charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "cleanpowersf", "provider_unit": "CleanPowerSF", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.sfpuc.gov/programs/clean-energy/ev-charge-sf"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-sfpuc-gov-programs-clean-energy-ev-charge-sf"], "source_url": "https://www.sfpuc.gov/programs/clean-energy/ev-charge-sf", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "CleanPowerSF charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on EV Charge SF. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "New Richmond Utilities", "afdc_ids": [14232], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on New Richmond Utilities |. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14232", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "New Richmond Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-richmond-utilities", "provider_unit": "New Richmond Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nrutilities.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-nrutilities-com"], "source_url": "https://www.nrutilities.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "New Richmond Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on New Richmond Utilities |. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "River Falls Municipal Utilities", "afdc_ids": [14233], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Utilities | River Falls, WI - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14233", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "River Falls Municipal Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "river-falls-municipal-utilities", "provider_unit": "River Falls Municipal Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://rfmu.org/1067/Utilities"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-rfmu-org-1067-utilities"], "source_url": "https://rfmu.org/1067/Utilities", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "River Falls Municipal Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Utilities | River Falls, WI - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Oconomowoc Utilities", "afdc_ids": [14239], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Level 2 Charging Station Installation Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Public Utilities - 262-569-2196  | City of Oconomowoc, WI - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14239", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Oconomowoc Utilities charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oconomowoc-utilities", "provider_unit": "Oconomowoc Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.oconomowoc-wi.gov/146/Public-Utilities"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-oconomowoc-wi-gov-146-public-utilities"], "source_url": "https://www.oconomowoc-wi.gov/146/Public-Utilities", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Oconomowoc Utilities charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Public Utilities - 262-569-2196  | City of Oconomowoc, WI - Official Website. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "St Croix Electric Coop", "afdc_ids": [14243], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | St. Croix Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14243", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "St Croix Electric Coop charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "st-croix-electric-coop", "provider_unit": "St Croix Electric Coop", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.scecnet.net"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-scecnet-net"], "source_url": "https://www.scecnet.net", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "St Croix Electric Coop charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | St. Croix Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Wisconsin Electric Power Co", "afdc_ids": [14245], "afdc_topics": ["EV Charger Deployment Pilot Programs"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on We Energies. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14245", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Wisconsin Electric Power Co charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wisconsin-electric-power-co", "provider_unit": "Wisconsin Electric Power Co", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.we-energies.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-we-energies-com"], "source_url": "https://www.we-energies.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Wisconsin Electric Power Co charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on We Energies. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Wisconsin Public Service Corp", "afdc_ids": [14246], "afdc_topics": ["EV Charger Deployment Pilot Programs"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Wisconsin Public Service. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14246", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Wisconsin Public Service Corp charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wisconsin-public-service-corp", "provider_unit": "Wisconsin Public Service Corp", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.wisconsinpublicservice.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-wisconsinpublicservice-com"], "source_url": "https://www.wisconsinpublicservice.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Wisconsin Public Service Corp charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Wisconsin Public Service. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Dunn County Electric Coop", "afdc_ids": [14248], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Dunn Energy Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14248", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Dunn County Electric Coop charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "dunn-county-electric-coop", "provider_unit": "Dunn County Electric Coop", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dunnenergy.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-dunnenergy-com"], "source_url": "https://www.dunnenergy.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Dunn County Electric Coop charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Dunn Energy Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Polk-Burnett Electric Coop", "afdc_ids": [14249], "afdc_topics": ["EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home | Polk-Burnett Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14249", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Polk-Burnett Electric Coop charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "polk-burnett-electric-coop", "provider_unit": "Polk-Burnett Electric Coop", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.polkburnett.com"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-polkburnett-com"], "source_url": "https://www.polkburnett.com", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Polk-Burnett Electric Coop charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home | Polk-Burnett Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Clatskanie PUD", "afdc_ids": [14306], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Home. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14306", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Clatskanie PUD charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "clatskanie-pud", "provider_unit": "Clatskanie PUD", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.clatskaniepud.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-clatskaniepud-com"], "source_url": "https://www.clatskaniepud.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Clatskanie PUD charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Home. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "City of Forest Grove​ Light & Power​", "afdc_ids": [14309], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["OR"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency and Conservation Programs | Forest Grove, OR. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14309", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "City of Forest Grove​ Light & Power​ charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "city-of-forest-grove-light-power", "provider_unit": "City of Forest Grove​ Light & Power​", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.forestgrove-or.gov/206/Energy-Efficiency-Incentive-Programs"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-forestgrove-or-gov-206-energy-efficiency-incentive-programs"], "source_url": "https://www.forestgrove-or.gov/206/Energy-Efficiency-Incentive-Programs", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "City of Forest Grove​ Light & Power​ charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency and Conservation Programs | Forest Grove, OR. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Homeworks", "afdc_ids": [14318], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Installation Rebate", "EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency Rebates & Programs - HomeWorks Tri-County Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14318", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Homeworks charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "homeworks", "provider_unit": "Homeworks", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.homeworks.org/210-2/electric-home/member-services/eo/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-homeworks-org-210-2-electric-home-member-services-eo"], "source_url": "https://www.homeworks.org/210-2/electric-home/member-services/eo/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Homeworks charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Energy Efficiency Rebates & Programs - HomeWorks Tri-County Electric Cooperative. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Wyandotte Municipal Services", "afdc_ids": [14321], "afdc_topics": ["EV Direct Current (DC) Fast Charging Station Purchase Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["MI"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on Wyandotte Municipal Services | Wyandotte, MI. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14321", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Wyandotte Municipal Services charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wyandotte-municipal-services", "provider_unit": "Wyandotte Municipal Services", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.wyan.org"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-www-wyan-org"], "source_url": "https://www.wyan.org", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Wyandotte Municipal Services charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on Wyandotte Municipal Services | Wyandotte, MI. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Silicon Valley Clean Energy", "afdc_ids": [14342], "afdc_topics": ["EV Level 2 Charging Station Installation Rebate", "EV Level 2 Charging Station Purchase Rebate"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "afdc-14342", "kind": "", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Silicon Valley Clean Energy charging-incentive discovery record", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "silicon-valley-clean-energy", "provider_unit": "Silicon Valley Clean Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://svcleanenergy.org/offers-services/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "home"], "source_grade": "UNVERIFIED", "source_ids": ["source-https-svcleanenergy-org-offers-services"], "source_url": "https://svcleanenergy.org/offers-services/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Silicon Valley Clean Energy charging-incentive discovery record", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for CA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Internal Revenue Service", "afdc_ids": [], "afdc_topics": [], "amount": "Business or organization property: 6% of the cost, or 30% if prevailing wage and apprenticeship requirements are met, up to $100,000 per item (each charging port). Main home: 30% of the cost, up to $1,000 per item.", "amount_formula": "Business or organization property: 6% of the cost, or 30% if prevailing wage and apprenticeship requirements are met, up to $100,000 per item (each charging port). Main home: 30% of the cost, up to $1,000 per item.", "application_sequence": null, "application_url": null, "body": "A federal income tax credit for EV charging equipment installed at a home or business in an eligible census tract. Property placed in service after June 30, 2026 cannot claim it.", "bucket": "money", "candidate_states": ["US"], "cap": "Business or organization property: 6% of the cost, or 30% if prevailing wage and apprenticeship requirements are met, up to $100,000 per item (each charging port). Main home: 30% of the cost, up to $1,000 per item.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Ended: property placed in service after June 30, 2026 cannot claim the credit (termination date moved from December 31, 2032 by P.L. 119-21).", "deadline_date": "2026-06-30", "disposition": "retained-historical", "disposition_reason": "A federal income tax credit for EV charging equipment installed at a home or business in an eligible census tract. Property placed in service after June 30, 2026 cannot claim it.", "effective_status": "ended", "eligibility": "Businesses and individuals installing charging equipment in a low-income community census tract or a non-urban census tract; tax-exempt and government entities through elective pay. Home equipment must be at the main home; business equipment must be depreciable property.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "us-irs-30c-refueling-property-credit", "kind": "tax credit", "legacy_aliases": [], "level": "federal", "matching_requirement": null, "name": "Alternative Fuel Vehicle Refueling Property Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "internal-revenue-service", "provider_unit": "Internal Revenue Service", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.irs.gov/credits-deductions/alternative-fuel-vehicle-refueling-property-credit"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home", "business", "public"], "source_grade": "PRIMARY", "source_ids": ["us-irs-30c-refueling-property-credit", "us-irs-form-8911-instructions"], "source_url": "https://www.irs.gov/credits-deductions/alternative-fuel-vehicle-refueling-property-credit", "stacking_rules": null, "state": "US", "states": ["US"], "status": "ended", "summary": "A federal income tax credit for EV charging equipment installed at a home or business in an eligible census tract. Property placed in service after June 30, 2026 cannot claim it.", "superseded_by": null, "technologies": [], "territory": "United States; historical IRS eligible-census-tract and taxpayer/property rules apply.", "title": "Alternative Fuel Vehicle Refueling Property Credit", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "N.C. Department of Transportation", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Retrieved and checked the source identity and EV/rebate passages on NCDOT: NEVI RFP Resources for Applicants. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-ncdot-nevi", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "National Electric Vehicle Infrastructure (NEVI) Program, Phase 1 corridor fast charging", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "n-c-department-of-transportation", "provider_unit": "N.C. Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.ncdot.gov/initiatives-policies/environmental/climate-change/NEVI/Pages/default.aspx"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "UNVERIFIED", "source_ids": ["nc-ncdot-nevi", "nc-ncdot-nevi-info", "nc-ncdot-nevi-rfp", "nc-ncdot-nevi-awards"], "source_url": "https://www.ncdot.gov/initiatives-policies/environmental/climate-change/NEVI/Pages/default.aspx", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "National Electric Vehicle Infrastructure (NEVI) Program, Phase 1 corridor fast charging", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Retrieved and checked the source identity and EV/rebate passages on NCDOT: NEVI RFP Resources for Applicants. This source is retained as provider/program discovery context. A current complete application window, operating-unit eligibility and controlling terms were not established for the imported candidate; it remains unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "N.C. Department of Environmental Quality, Division of Air Quality", "afdc_ids": [12256], "afdc_topics": [], "amount": "Up to $5,000 per new charging port for government applicants and up to $4,000 per port for non-government applicants.", "amount_formula": "Up to $5,000 per new charging port for government applicants and up to $4,000 per port for non-government applicants.", "application_sequence": null, "application_url": null, "body": "First-come, first-served rebates for new Level 2 charging ports, paid from North Carolina's Volkswagen settlement funds. The program is over.", "bucket": "money", "candidate_states": ["NC"], "cap": "Up to $5,000 per new charging port for government applicants and up to $4,000 per port for non-government applicants.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Program over: Phase 2 ran 2021-2024, and DEQ does not expect any more Volkswagen settlement funds to distribute.", "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "First-come, first-served rebates for new Level 2 charging ports, paid from North Carolina's Volkswagen settlement funds. The program is over.", "effective_status": "ended", "eligibility": "Government and non-government applicants. In Phase 2, separate rebates covered multi-unit dwellings such as apartment complexes and condominiums, workplaces, and public sites, and a competitive grant covered state agencies.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-deq-vw-level-2-rebate", "kind": "rebate", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Volkswagen Settlement Level 2 Charger Rebate Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "n-c-department-of-environmental-quality-division-of-air-quality", "provider_unit": "N.C. Department of Environmental Quality, Division of Air Quality", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.deq.nc.gov/about/divisions/air-quality/motor-vehicles-and-air-quality/volkswagen-settlement/volkswagen-settlement-ev-charging-infrastructure"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["nc-deq-vw-ev-charging", "nc-deq-vw-community-destination-awards-2025"], "source_url": "https://www.deq.nc.gov/about/divisions/air-quality/motor-vehicles-and-air-quality/volkswagen-settlement/volkswagen-settlement-ev-charging-infrastructure", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "ended", "summary": "First-come, first-served rebates for new Level 2 charging ports, paid from North Carolina's Volkswagen settlement funds. The program is over.", "superseded_by": null, "technologies": [], "territory": "Eligible sites in NC; the named state program's applicant and site conditions apply.", "title": "Volkswagen Settlement Level 2 Charger Rebate Program", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "N.C. Department of Environmental Quality, Division of Air Quality", "afdc_ids": [12256], "afdc_topics": [], "amount": "Awards were based on charging capacity, number of ports and type of applicant (government or non-government). The final 2025 Community & Destination round awarded $1.91 million for 25 DC fast ports at 13 sites.", "amount_formula": "Awards were based on charging capacity, number of ports and type of applicant (government or non-government). The final 2025 Community & Destination round awarded $1.91 million for 25 DC fast ports at 13 sites.", "application_sequence": null, "application_url": null, "body": "Competitive grants from North Carolina's Volkswagen settlement funds for public DC fast charging stations. The last round, funded from canceled projects, was awarded in 2025, and the program is over.", "bucket": "money", "candidate_states": ["NC"], "cap": "Awards were based on charging capacity, number of ports and type of applicant (government or non-government). The final 2025 Community & Destination round awarded $1.91 million for 25 DC fast ports at 13 sites.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Program over: the last round was awarded in 2025, and DEQ does not expect any more Volkswagen settlement funds to distribute.", "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Competitive grants from North Carolina's Volkswagen settlement funds for public DC fast charging stations. The last round, funded from canceled projects, was awarded in 2025, and the program is over.", "effective_status": "ended", "eligibility": "Government and non-government applicants installing public DC fast chargers; 2025 award sites included state parks, shopping centers, gas stations, town centers and hotels.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-deq-vw-dc-fast-grant", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Volkswagen Settlement DC Fast Charging Grant Program (including the 2025 Community & Destination round)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "n-c-department-of-environmental-quality-division-of-air-quality", "provider_unit": "N.C. Department of Environmental Quality, Division of Air Quality", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.deq.nc.gov/about/divisions/air-quality/motor-vehicles-and-air-quality/volkswagen-settlement/volkswagen-settlement-ev-charging-infrastructure"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["nc-deq-vw-ev-charging", "nc-deq-vw-community-destination-awards-2025"], "source_url": "https://www.deq.nc.gov/about/divisions/air-quality/motor-vehicles-and-air-quality/volkswagen-settlement/volkswagen-settlement-ev-charging-infrastructure", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "ended", "summary": "Competitive grants from North Carolina's Volkswagen settlement funds for public DC fast charging stations. The last round, funded from canceled projects, was awarded in 2025, and the program is over.", "superseded_by": null, "technologies": [], "territory": "Eligible sites in NC; the named state program's applicant and site conditions apply.", "title": "Volkswagen Settlement DC Fast Charging Grant Program (including the 2025 Community & Destination round)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Georgia Department of Transportation", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Current availability and terms require primary-source verification.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "New administrator application announcement, current terms, or successful access to the cited controlling source.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Attempted the registered URL for GA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "ga-gdot-nevi", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Georgia NEVI Deployment Program (corridor DC fast charging)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "georgia-department-of-transportation", "provider_unit": "Georgia Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nevi-gdot.hub.arcgis.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "review_scope": "National candidate triage; source-specific unresolved disposition, not current offer approval", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["ga-gdot-nevi"], "source_url": "https://nevi-gdot.hub.arcgis.com/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Current availability and terms require primary-source verification.", "superseded_by": null, "technologies": [], "territory": null, "title": "Georgia NEVI Deployment Program (corridor DC fast charging)", "unknown_fields": ["actual operating-unit/customer territory", "amount/cap", "current administrator availability", "current controlling terms", "current status", "deadline", "eligibility", "eligible jurisdiction", "equipment", "funding", "preapproval"], "unresolved_conditions": ["Attempted the registered URL for GA; the direct route was unavailable or a JavaScript/access shell. The exact failure remains in the internal receipt. No current application status or amount is certified by this attempt."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "Georgia Department of Revenue", "afdc_ids": [5182], "afdc_topics": [], "amount": "The lesser of 10% of the cost of the charger or $2,500.", "amount_formula": "The lesser of 10% of the cost of the charger or $2,500.", "application_sequence": null, "application_url": null, "body": "A Georgia income tax credit for a business that bought an electric vehicle charger located in Georgia. It was repealed effective January 1, 2026.", "bucket": "money", "candidate_states": ["GA"], "cap": "The lesser of 10% of the cost of the charger or $2,500.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Repealed effective January 1, 2026 by House Bill 463 (Georgia Economic Growth and Tax Relief Act of 2026).", "deadline_date": "2026-01-01", "disposition": "retained-historical", "disposition_reason": "A Georgia income tax credit for a business that bought an electric vehicle charger located in Georgia. It was repealed effective January 1, 2026.", "effective_status": "ended", "eligibility": "A business enterprise buying an electric vehicle charger located in Georgia.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-dor-ev-charger-credit", "kind": "tax credit", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Electric Vehicle Charger Credit (Georgia income tax credit)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "georgia-department-of-revenue", "provider_unit": "Georgia Department of Revenue", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://dor.georgia.gov/electric-vehicle-charger-credit"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "PRIMARY", "source_ids": ["ga-dor-ev-charger-credit"], "source_url": "https://dor.georgia.gov/electric-vehicle-charger-credit", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "ended", "summary": "A Georgia income tax credit for a business that bought an electric vehicle charger located in Georgia. It was repealed effective January 1, 2026.", "superseded_by": null, "technologies": [], "territory": "Eligible sites in GA; the named state program's applicant and site conditions apply.", "title": "Electric Vehicle Charger Credit (Georgia income tax credit)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Florida Department of Environmental Protection", "afdc_ids": [], "afdc_topics": [], "amount": "Up to 80 percent of costs for publicly accessible chargers on non-government property and up to 100 percent on government property, up to $500,000 per site.", "amount_formula": "Up to 80 percent of costs for publicly accessible chargers on non-government property and up to 100 percent on government property, up to $500,000 per site.", "application_sequence": null, "application_url": null, "body": "Competitive cost-reimbursement grants from Florida's Volkswagen settlement funds for DC fast charging along evacuation corridors. The second round was the final one.", "bucket": "money", "candidate_states": ["FL"], "cap": "Up to 80 percent of costs for publicly accessible chargers on non-government property and up to 100 percent on government property, up to $500,000 per site.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Program over: Phase 2 was the second and final round, with applications due January 8, 2021. Florida has reassigned its remaining Volkswagen funds to truck replacement.", "deadline_date": "2021-01-08", "disposition": "retained-historical", "disposition_reason": "Competitive cost-reimbursement grants from Florida's Volkswagen settlement funds for DC fast charging along evacuation corridors. The second round was the final one.", "effective_status": "ended", "eligibility": "Governments, electric utilities, businesses registered in Florida (mainly site hosts, service providers and equipment makers), 501(c)(3) nonprofits and partnerships; DC fast charging near I-10, I-95, I-75 and I-4.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "fl-dep-vw-evci", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Volkswagen Settlement Electric Vehicle Charging Infrastructure (EVCI) grants", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "florida-department-of-environmental-protection", "provider_unit": "Florida Department of Environmental Protection", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://floridadep.gov/air/air-director/content/demp-volkswagen-settlement-and-dera"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["fl-dep-demp-vw", "fl-dep-evci-rfa-02"], "source_url": "https://floridadep.gov/air/air-director/content/demp-volkswagen-settlement-and-dera", "stacking_rules": null, "state": "FL", "states": ["FL"], "status": "ended", "summary": "Competitive cost-reimbursement grants from Florida's Volkswagen settlement funds for DC fast charging along evacuation corridors. The second round was the final one.", "superseded_by": null, "technologies": [], "territory": "Eligible sites in FL; the named state program's applicant and site conditions apply.", "title": "Volkswagen Settlement Electric Vehicle Charging Infrastructure (EVCI) grants", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Tennessee Department of Environment and Conservation, Office of Energy Programs", "afdc_ids": [], "afdc_topics": [], "amount": "Up to 80% of eligible cost; maximum $600,000 grant", "amount_formula": "80% eligible cost within $150,000 per charger, $300,000 per site and $600,000 grant limits", "application_route_notes": "Submit the Round 3 grant application and supporting documents through TDEC GMS.", "application_route_type": "portal", "application_sequence": "Confirm gap-site and utility; mandatory workshop/application; award/contract/environmental approval; complete within contract's 15-month period; submit reimbursement/data and maintain five years.", "application_url": "https://tdec.smartsimple.com/", "application_url_source_id": "tn-tdec-fast-charge-r3-application-manual", "body": "Fast Charge TN Round 3 accepts eligible public DCFC gap-area proposals until November 30, 2026; competitive grant, match, utility coordination and preconstruction approvals apply.", "bucket": "money", "candidate_states": ["TN"], "cap": "$150,000/charger; $300,000/site; $600,000/grant", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible fast-charging equipment purchase/installation, utility make-ready including three-phase service, trenching/conduit, engineering/design and site qualification, and upfront purchased maintenance/network services, bollards and wheel stops, incurred during the grant contract term.", "deadline": "November 30, 2026 at 4 p.m. Central (administrator labels CDT)", "deadline_date": "2026-11-30", "disposition": "retained-current", "disposition_reason": "AFDC/legacy discovery record has not established current administrator terms for this named opportunity.", "effective_status": "open", "eligibility": "Eligible Tennessee public DCFC gap-map site, public access 24/7, corridor distance and local power company coordination; workshop participation required", "equipment_conditions": "Two–four DCFC per qualifying site, at least 50 kW output per charger and stated CCS/power-sharing requirements; Buy America, ADA, environmental review and five-year O&M/data obligations", "excluded_costs": "Real-estate purchase/rental; buildings, canopies and parking-facility capital; general maintenance unrelated to charging; land-acquisition legal fees; indirect administrative/reporting/contract-management/Title VI costs; costs outside the grant contract term or approved grant amount.", "funding_limit": "Approximately $600,000 of additional TDEC funding released for the Round 3 solicitation, according to the reviewed Round 3 Application Manual. This is the solicitation budget, separate from the per-grant cap; no current uncommitted balance is established.", "geography_verified": true, "id": "tn-tdec-fast-charge-network", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": "At least 20% applicant match", "name": "Fast Charge TN Network Grant Program (Round 3)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Execute the grant contract and obtain required environmental approval before construction. Grantee must obtain State approval before purchasing goods or services under the contract and follow the approved procurement process; post-award reimbursement is not permission to incur unapproved costs.", "provider_id": "tennessee-department-of-environment-and-conservation-office-of-energy-programs", "provider_unit": "Tennessee Department of Environment and Conservation, Office of Energy Programs", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tn.gov/environment/program-areas/energy/state-energy-office/programs-projects/energy-transportation/transportation-electrification-tn/tdec-tva-moa.html"}], "required_documents": "GMS application with stations/site and vendor/services description, energy generation/storage details, requested grant and cost-share budget, financial-commitment letters and annual Title VI completion; vendor quotes/selection information where identified. After award: signed grant contract, vendor ID, W-9, original signed ACH form, site-host agreement or ownership verification, environmental checklist and approved procurement. Reimbursement requires itemized invoices, paid costs and operability evidence; quarterly and five-year annual reporting applies.", "retrieved_date": null, "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["tn-tdec-fast-charge-network", "tn-tdec-fast-charge-2026-release", "tn-tdec-fast-charge-r3-application-manual"], "source_url": "https://www.tn.gov/environment/program-areas/energy/state-energy-office/programs-projects/energy-transportation/transportation-electrification-tn/tdec-tva-moa.html", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "Fast Charge TN Round 3 accepts eligible public DCFC gap-area proposals until November 30, 2026; competitive grant, match, utility coordination and preconstruction approvals apply.", "superseded_by": null, "technologies": ["DC fast"], "territory": "Eligible public Tennessee DC fast charging gap-map sites meeting the corridor-distance and utility-coordination requirements.", "title": "Fast Charge TN Network Grant Program (Round 3)", "unknown_fields": ["live remaining funding", "individual award"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Tennessee Department of Environment and Conservation, Office of Energy Programs", "afdc_ids": [], "afdc_topics": [], "amount": "60% of total eligible project costs, up to $10,000 per charging plug at low-income or affordable housing or in a significantly burdened census tract, and up to $6,000 per plug at other developments; up to 10 plugs per site.", "amount_formula": "60% of total eligible project costs, up to $10,000 per charging plug at low-income or affordable housing or in a significantly burdened census tract, and up to $6,000 per plug at other developments; up to 10 plugs per site.", "application_route_notes": "Download the reservation worksheet and application checklist here; send the site-specific packet to TDEC.OEP@tn.gov using the stated program subject line.", "application_route_type": "instructions", "application_sequence": "Send the reservation worksheet to TDEC.OEP@tn.gov; register as a state supplier and obtain Supplier ID; receive TDEC’s reservation letter; complete the project and send the required application documentation within the letter’s 90-day reservation; TDEC checks completeness and accuracy, calculates the final eligible rebate from actual costs, then reimburses the applicant.", "application_url": "https://www.tn.gov/environment/program-areas/energy/state-energy-office/programs-projects/energy-transportation/tn-vw-settlement/project-solicitations/light-duty-electric-vehicle-supply-equipment/mfhrp.html", "application_url_source_id": "tn-tdec-mfhrp", "body": "A Volkswagen settlement rebate toward installing Level 2 chargers for residents at multifamily properties in Tennessee, paid after the installation is complete.", "bucket": "money", "candidate_states": ["TN"], "cap": "60% of total eligible project costs, up to $10,000 per charging plug at low-income or affordable housing or in a significantly burdened census tract, and up to $6,000 per plug at other developments; up to 10 plugs per site.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible Level 2 hardware purchase/installation; make-ready trenching/conduit; engineering/design and site identification/qualification; upfront purchased charging maintenance/network services, bollards and wheel stops.", "deadline": "No end date published. The September 23, 2026 funding snapshot includes reservations; see the dated funding limit. An approved reservation holds the estimated rebate for 90 days.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A Volkswagen settlement rebate toward installing Level 2 chargers for residents at multifamily properties in Tennessee, paid after the installation is complete.", "effective_status": "open", "eligibility": "Property owners, authorized property managers, homeowner associations and authorized lessees of multifamily housing in Tennessee with at least 4 units per site. Each site needs at least two plugs; chargers must be available to residents 24/7 and not open to the general public. Submitting a Rebate Reservation Request Worksheet before starting is strongly encouraged.", "equipment_conditions": "Level 2 charging at a Tennessee multifamily development with at least four housing units; at least two and up to ten charging plugs per site for the rebate. Chargers must be available to property residents 24/7 year-round and must not be accessible to the general public. The higher cap requires the stated affordable-housing or significantly burdened census-tract criteria.", "excluded_costs": "Real-estate purchase/rental; buildings, canopies and parking-facility capital; maintenance unrelated to charging; land-acquisition legal fees; administrative costs not directly connected to charging purchase, installation, operation or maintenance.", "funding_limit": "Program launched September 8, 2026 with $650,000. The administrator reported $650,000 in unspent funds with $248,589 reserved for projects in progress as of September 23, 2026. Unspent is not unreserved or a live availability guarantee; confirm current funds with TDEC.", "geography_verified": true, "id": "tn-tdec-multifamily-level-2-rebate", "kind": "rebate", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Multifamily Housing Rebate Program for Level 2 Charging", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "A site-specific reservation request before starting is strongly encouraged, not stated as mandatory. TDEC’s approved letter reserves the estimated amount for 90 days; final rebate is based on completed eligible work and actual paid costs.", "provider_id": "tennessee-department-of-environment-and-conservation-office-of-energy-programs", "provider_unit": "Tennessee Department of Environment and Conservation, Office of Energy Programs", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tn.gov/environment/program-areas/energy/state-energy-office/programs-projects/energy-transportation/tn-vw-settlement/project-solicitations/light-duty-electric-vehicle-supply-equipment/mfhrp.html"}], "required_documents": "Completed reservation worksheet; itemized project budget; eligible equipment/service invoices and proof of payment; housing association rules/bylaws permitting all residents to use the station; completed-installation photos; low-income/affordable-housing verification and/or CDC Environmental Justice Index tract proof where claiming the higher cap. Register as a Tennessee supplier and obtain the Supplier ID; submit a separate packet for each site.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["multifamily"], "source_grade": "PRIMARY", "source_ids": ["tn-tdec-mfhrp"], "source_url": "https://www.tn.gov/environment/program-areas/energy/state-energy-office/programs-projects/energy-transportation/tn-vw-settlement/project-solicitations/light-duty-electric-vehicle-supply-equipment/mfhrp.html", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "A Volkswagen settlement rebate toward installing Level 2 chargers for residents at multifamily properties in Tennessee, paid after the installation is complete.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Eligible sites in TN; the named state program's applicant and site conditions apply.", "title": "Multifamily Housing Rebate Program for Level 2 Charging", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Tennessee Department of Transportation, with the Tennessee Department of Environment and Conservation", "afdc_ids": [], "afdc_topics": [], "amount": "Federal funds can cover up to 80% of the total eligible project cost; the applicant pays the rest, with a minimum 20% non-federal cost share.", "amount_formula": "Federal funds can cover up to 80% of the total eligible project cost; the applicant pays the rest, with a minimum 20% non-federal cost share.", "application_sequence": null, "application_url": null, "body": "Tennessee's federal NEVI program: competitive awards to third parties that design, build, own and operate public DC fast charging stations along the state's designated corridors.", "bucket": "money", "candidate_states": ["TN"], "cap": "Federal funds can cover up to 80% of the total eligible project cost; the applicant pays the rest, with a minimum 20% non-federal cost share.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Round 1 (notice issued August 2023) is closed; TDOT announced contingent awardees in January 2024 and is re-engaging them before signing contracts. No new round is published.", "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Tennessee's federal NEVI program: competitive awards to third parties that design, build, own and operate public DC fast charging stations along the state's designated corridors.", "effective_status": "closed", "eligibility": "Third parties that design, build, own and operate NEVI-compliant charging, either existing property owners or applicants with site host agreements; stations must be DC fast chargers publicly accessible 24 hours a day, 7 days a week, 365 days of the year.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "tn-tdot-tevi", "kind": "grant", "legacy_aliases": [], "level": "state", "matching_requirement": null, "name": "Tennessee Electric Vehicle Infrastructure (TEVI) Program (NEVI)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tennessee-department-of-transportation-with-the-tennessee-department-of-environment-and-conservation", "provider_unit": "Tennessee Department of Transportation, with the Tennessee Department of Environment and Conservation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tn.gov/tdot/local-programs-community-investments/community-investments-office/air-quality/tennessee-electric-vehicle-infrastructure--tevi-.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "PRIMARY", "source_ids": ["tn-tdot-tevi", "tn-tdot-tevi-fy2026-plan"], "source_url": "https://www.tn.gov/tdot/local-programs-community-investments/community-investments-office/air-quality/tennessee-electric-vehicle-infrastructure--tevi-.html", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "closed", "summary": "Tennessee's federal NEVI program: competitive awards to third parties that design, build, own and operate public DC fast charging stations along the state's designated corridors.", "superseded_by": null, "technologies": [], "territory": "Eligible sites in TN; the named state program's applicant and site conditions apply.", "title": "Tennessee Electric Vehicle Infrastructure (TEVI) Program (NEVI)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "JEA", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Linked JEA terms define a program year ending September 30, 2026. New program-year terms and current availability could not be verified; do not treat the old per-charger amounts as a current offer.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": "2026-09-30", "disposition": "retained-current", "disposition_reason": "Linked JEA terms define a program year ending September 30, 2026. New program-year terms and current availability could not be verified; do not treat the old per-charger amounts as a current offer.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-jea-erp-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electrification Rebate Program: EV charging stations", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "jea", "provider_unit": "JEA", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cdn.bfldr.com/R4DMXZPO/at/gcgcpmjn7h4p9sqm5xvwzkx/JEA_PY26_TermsConditions_v01_-_33126TW_Edits.pdf"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["fl-jea-erp-terms-py26", "fl-jea-electrification-rebates", "fl-jea-evse-flyer-2025-12"], "source_url": "https://cdn.bfldr.com/R4DMXZPO/at/gcgcpmjn7h4p9sqm5xvwzkx/JEA_PY26_TermsConditions_v01_-_33126TW_Edits.pdf", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Linked JEA terms define a program year ending September 30, 2026. New program-year terms and current availability could not be verified; do not treat the old per-charger amounts as a current offer.", "superseded_by": null, "technologies": [], "territory": null, "title": "Electrification Rebate Program: EV charging stations", "unknown_fields": ["current program year", "current amount/cap", "current funding status"], "unresolved_conditions": ["2025–2026 terms are historical; current-year terms missing", "Landing pages returned unusable JavaScript/challenge text", "Old flyer minimum amounts conflict with terms maximum amounts"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["9617"], "verified_date": null}, {"administrator": "JEA", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "JEA fleet program page and application could not be read as substantive current terms. Prior terms ended September 30, 2026; a new-project incentive is not confirmed.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": "2026-09-30", "disposition": "retained-current", "disposition_reason": "JEA fleet program page and application could not be read as substantive current terms. Prior terms ended September 30, 2026; a new-project incentive is not confirmed.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-jea-fleet-make-ready-incentive", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Fleet Electrification Program: Make Ready Incentive", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "jea", "provider_unit": "JEA", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.jea.com/business_resources/fleet_electrification_program/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["fleet"], "source_grade": "UNVERIFIED", "source_ids": ["fl-jea-fleet-electrification", "fl-jea-make-ready-application"], "source_url": "https://www.jea.com/business_resources/fleet_electrification_program/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "JEA fleet program page and application could not be read as substantive current terms. Prior terms ended September 30, 2026; a new-project incentive is not confirmed.", "superseded_by": null, "technologies": [], "territory": null, "title": "Fleet Electrification Program: Make Ready Incentive", "unknown_fields": ["current status", "amount", "preapproval", "eligibility", "deadline"], "unresolved_conditions": ["Current JEA application and terms unavailable in primary retrieval"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["9617"], "verified_date": null}, {"administrator": "Kissimmee Utility Authority (KUA)", "afdc_ids": [], "afdc_topics": [], "amount": "$200 off the KUA Home EV charger, applied instantly once the purchase order is confirmed; one rebate per location.", "amount_formula": "$200 off the KUA Home EV charger, applied instantly once the purchase order is confirmed; one rebate per location.", "application_route_notes": "KUA charger purchase/application route; the discount is applied when the purchase order is confirmed.", "application_route_type": "form", "application_sequence": "Consult a Florida DBPR-licensed electrical contractor about capacity, permits and site work; apply to purchase the KUA charger; once KUA confirms the purchase order, the $200 discount is applied instantly. Arrange the permitted electrical work and pickup, shipping or eligible delivery. This is not a post-installation reimbursement application.", "application_url": "https://form.jotform.com/240703386815054", "application_url_source_id": "fl-kua-application-link-review", "body": "A rebate, applied instantly, when a residential KUA customer buys KUA's own Level 2 home charger through KUA.", "bucket": "money", "candidate_states": ["FL"], "cap": "$200 off the KUA Home EV charger, applied instantly once the purchase order is confirmed; one rebate per location.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$200 off the KUA Home EV charger, applied instantly once the purchase order is confirmed; one rebate per location.", "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate, applied instantly, when a residential KUA customer buys KUA's own Level 2 home charger through KUA.", "effective_status": "open", "eligibility": "Active KUA account holders at residential homeowner locations; the program is not for businesses. The customer must own the property or have the owner's written permission, and must hire a Florida DBPR-licensed contractor for the electrical work. Short-term rental properties qualify when service is in the owner's or owner's agent's name. The rebate applies only to a charger bought through KUA.", "equipment_conditions": "Active KUA account holders at residential homeowner locations; the program is not for businesses. The customer must own the property or have the owner's written permission, and must hire a Florida DBPR-licensed contractor for the electrical work. Short-term rental properties qualify when service is in the owner's or owner's agent's name. The rebate applies only to a charger bought through KUA.", "excluded_costs": "Customer-contracted electrical installation and applicable sales tax are separate from the instant KUA charger discount; non-KUA charger purchases and business locations do not qualify.", "funding_limit": null, "geography_verified": true, "id": "fl-kua-home-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Home EV Charger Program rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Instant discount after KUA purchase-order confirmation; charger must be bought through KUA.", "provider_id": "kissimmee-utility-authority-kua", "provider_unit": "Kissimmee Utility Authority (KUA)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://kua.com/ev/homeev/"}], "required_documents": "KUA charger purchase order, qualifying electricity account, property authority and licensed electrical installation requirements", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["fl-kua-home-ev-chargers", "fl-kua-application-link-review"], "source_url": "https://kua.com/ev/homeev/", "stacking_rules": null, "state": "FL", "states": ["FL"], "status": "open", "summary": "A rebate, applied instantly, when a residential KUA customer buys KUA's own Level 2 home charger through KUA.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Home EV Charger Program rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["10376"], "verified_date": "2026-10-13"}, {"administrator": "Keys Energy Services", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $400 per charger: a $350.00 base rebate for a UL-certified Level 2 charger plus a $50.00 efficiency rebate if it is ENERGY STAR certified, credited to the customer's electric account and never more than the cost of the charger and installation. Single-family and commercial accounts: up to two base and two efficiency rebates every five years. Multifamily common-area accounts: one of each per year for two to ten units; above ten units, up to the lesser of ten or ten percent of the units.", "amount_formula": "Up to $400 per charger: a $350.00 base rebate for a UL-certified Level 2 charger plus a $50.00 efficiency rebate if it is ENERGY STAR certified, credited to the customer's electric account and never more than the cost of the charger and installation. Single-family and commercial accounts: up to two base and two efficiency rebates every five years. Multifamily common-area accounts: one of each per year for two to ten units; above ten units, up to the lesser of ten or ten percent of the units.", "application_route_notes": "The administrator PDF contains the request form, supporting-document rules and submission instructions.", "application_route_type": "form", "application_sequence": "Purchase and install qualifying equipment; complete the rebate request with purchase and installation evidence, ENERGY STAR proof for the extra rebate, and any required property permission; KEYS must receive it within 90 days of purchase. Allow any KEYS verification; an approved rebate is credited to the electric account.", "application_url": "https://cdn.prod.website-files.com/627285baad33681929feb6d9/659272bbdbb6f549d6c4fa6a_EV%20Charger%20Rebate%20Application%20with%20Early%20Adopter%20Removed%20rev%20Jan%201%202023%20final.pdf", "application_url_source_id": "fl-keys-energy-ev-charger-rebate-form", "body": "A rebate on a UL-certified Level 2 charger that a KEYS residential, multifamily or commercial customer buys and installs, with an extra amount for an ENERGY STAR model.", "bucket": "money", "candidate_states": ["FL"], "cap": "Up to $400 per charger: a $350.00 base rebate for a UL-certified Level 2 charger plus a $50.00 efficiency rebate if it is ENERGY STAR certified, credited to the customer's electric account and never more than the cost of the charger and installation. Single-family and commercial accounts: up to two base and two efficiency rebates every five years. Multifamily common-area accounts: one of each per year for two to ten units; above ten units, up to the lesser of ten or ten percent of the units.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Up to $400 per charger: a $350.00 base rebate for a UL-certified Level 2 charger plus a $50.00 efficiency rebate if it is ENERGY STAR certified, credited to the customer's electric account and never more than the cost of the charger and installation. Single-family and commercial accounts: up to two base and two efficiency rebates every five years. Multifamily common-area accounts: one of each per year for two to ten units; above ten units, up to the lesser of ten or ten percent of the units.", "deadline": "No end date published; apply within 90 days of purchase. Rebates are first-come, first-served and subject to funding.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate on a UL-certified Level 2 charger that a KEYS residential, multifamily or commercial customer buys and installs, with an extra amount for an ENERGY STAR model.", "effective_status": "open", "eligibility": "Single-family residential, multifamily residential and commercial KEYS customers who buy and install a UL-certified Level 2 charger on their own premises in KEYS' territory. Apply within 90 days of purchase with proof of purchase and proof of installation (contractor invoice, or a photo and serial number if self-installed); multifamily customers and renters need proof that installation is allowed. KEYS may inspect before paying.", "equipment_conditions": "Single-family residential, multifamily residential and commercial KEYS customers who buy and install a UL-certified Level 2 charger on their own premises in KEYS' territory. Apply within 90 days of purchase with proof of purchase and proof of installation (contractor invoice, or a photo and serial number if self-installed); multifamily customers and renters need proof that installation is allowed. KEYS may inspect before paying.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "fl-keys-energy-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Request follows purchase/installation and must reach KEYS within 90 days of purchase; the form does not establish a separate reservation before work.", "provider_id": "keys-energy-services", "provider_unit": "Keys Energy Services", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.keysenergy.com/electric-vehicles"}], "required_documents": "Completed request; itemized purchase receipt showing description/date/price; contractor installation invoice, or installed-charger photo and serial number for allowed self-installation; ENERGY STAR certification for the extra efficiency rebate; association/property-manager permission for multifamily customers and owner permission for renters.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home", "multifamily", "business"], "source_grade": "PRIMARY", "source_ids": ["fl-keys-energy-electric-vehicles", "fl-keys-energy-rebate-program", "fl-keys-energy-ev-charger-rebate-form"], "source_url": "https://www.keysenergy.com/electric-vehicles", "stacking_rules": null, "state": "FL", "states": ["FL"], "status": "open", "summary": "A rebate on a UL-certified Level 2 charger that a KEYS residential, multifamily or commercial customer buys and installs, with an extra amount for an ENERGY STAR model.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["10226"], "verified_date": "2026-10-13"}, {"administrator": "Florida Keys Electric Cooperative (FKEC)", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $350 for a UL-certified Level 2 charger, as a credit on the electric bill and never more than the purchase or installation price. All FKEC rebates together are capped at $500.00 per member per calendar year.", "amount_formula": "Up to $350 for a UL-certified Level 2 charger, as a credit on the electric bill and never more than the purchase or installation price. All FKEC rebates together are capped at $500.00 per member per calendar year.", "application_route_notes": "Use the EV charger request form in this PDF after installation.", "application_route_type": "form", "application_sequence": "Install the qualifying charger at the FKEC residence; submit the completed request with purchase receipt and installation proof within 90 days of installation; resolve any requested verification before the approved electric-bill credit.", "application_url": "https://www.fkec.com/wp-content/uploads/Rebate-EVCharger.pdf", "application_url_source_id": "fl-fkec-ev-charger-rebate", "body": "A rebate, paid as a bill credit, for a UL-certified Level 2 charger installed at an FKEC residential member's home.", "bucket": "money", "candidate_states": ["FL"], "cap": "Up to $350 for a UL-certified Level 2 charger, as a credit on the electric bill and never more than the purchase or installation price. All FKEC rebates together are capped at $500.00 per member per calendar year.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Up to $350 for a UL-certified Level 2 charger, as a credit on the electric bill and never more than the purchase or installation price. All FKEC rebates together are capped at $500.00 per member per calendar year.", "deadline": "No end date published; the program runs year-round, subject to funding. Requests are due within 90 days of installation.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate, paid as a bill credit, for a UL-certified Level 2 charger installed at an FKEC residential member's home.", "effective_status": "open", "eligibility": "FKEC residential members of record, for a UL-certified Level 2 charger at their primary residence in FKEC's territory, installed on or after July 1, 2019, in an existing home (not new construction). Submit the request form with proof of purchase and proof of installation (paid contractor invoice, or a photo and serial number if self-installed) within 90 days of installation.", "equipment_conditions": "FKEC residential members of record, for a UL-certified Level 2 charger at their primary residence in FKEC's territory, installed on or after July 1, 2019, in an existing home (not new construction). Submit the request form with proof of purchase and proof of installation (paid contractor invoice, or a photo and serial number if self-installed) within 90 days of installation.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "fl-fkec-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Rebate (Residential Rebate Program)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Request follows installation, with purchase and installation proof due within 90 days of installation; separate advance reservation is not established by the form.", "provider_id": "florida-keys-electric-cooperative-fkec", "provider_unit": "Florida Keys Electric Cooperative (FKEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.fkec.com/energy-efficiency/residential-rebate-program/"}], "required_documents": "Request form, charger purchase proof and paid installation invoice or permitted self-install photo/serial evidence", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["fl-fkec-residential-rebate-program", "fl-fkec-ev-charger-rebate"], "source_url": "https://www.fkec.com/energy-efficiency/residential-rebate-program/", "stacking_rules": null, "state": "FL", "states": ["FL"], "status": "open", "summary": "A rebate, paid as a bill credit, for a UL-certified Level 2 charger installed at an FKEC residential member's home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Rebate (Residential Rebate Program)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["6443"], "verified_date": "2026-10-13"}, {"administrator": "New Smyrna Beach Utilities", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The official application PDF still contains historical rebate terms; the current program landing page returned 403. An undated surviving form does not establish current funding availability.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "The official application PDF still contains historical rebate terms; the current program landing page returned 403. An undated surviving form does not establish current funding availability.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-nsbu-ev-home-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Home Charger Installation Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "new-smyrna-beach-utilities", "provider_unit": "New Smyrna Beach Utilities", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nsbufl.com/electric-vehicles"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["fl-nsbu-electric-vehicles", "fl-nsbu-ev-home-charger-rebate"], "source_url": "https://www.nsbufl.com/electric-vehicles", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "The official application PDF still contains historical rebate terms; the current program landing page returned 403. An undated surviving form does not establish current funding availability.", "superseded_by": null, "technologies": [], "territory": null, "title": "EV Home Charger Installation Rebate", "unknown_fields": ["current funding status", "current amount/cap", "current deadline"], "unresolved_conditions": ["Current NSBU landing-page blocked; old application lacks current funding confirmation"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["13485"], "verified_date": null}, {"administrator": "Carroll EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250.00, one time, for a new Level 2 home charging station.", "amount_formula": "$250.00, one time, for a new Level 2 home charging station.", "application_route_notes": "Complete the home charger application within 45 days of purchase.", "application_route_type": "form", "application_sequence": "Buy the qualifying new listed home charger; complete the online application within 45 days of purchase with the requested member and identification details; complete the installation and allow the cooperative to verify it before the rebate is paid.", "application_url": "https://carrollemc.com/home-charger-rebate-application/", "application_url_source_id": "ga-carroll-emc-home-charger-rebate", "body": "A one-time rebate for Carroll EMC members who install a new Level 2 charger at home.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250.00, one time, for a new Level 2 home charging station.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250.00, one time, for a new Level 2 home charging station.", "deadline": "No end date published; the application must be completed within 45 days of buying the charger.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A one-time rebate for Carroll EMC members who install a new Level 2 charger at home.", "effective_status": "open", "eligibility": "Carroll EMC members installing a new Level 2 NRTL/UL-listed charger at their residence; portable chargers do not qualify. Apply within 45 days of buying the charger; the co-op inspects the installation before paying. Charger must be bought on or after October 1, 2020.", "equipment_conditions": "Carroll EMC members installing a new Level 2 NRTL/UL-listed charger at their residence; portable chargers do not qualify. Apply within 45 days of buying the charger; the co-op inspects the installation before paying. Charger must be bought on or after October 1, 2020.", "excluded_costs": "Portable chargers and chargers that are not NRTL/UL listed do not qualify.", "funding_limit": null, "geography_verified": true, "id": "ga-carroll-emc-home-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Home Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "The application must be made within 45 days of purchase; cooperative verification of the installed equipment applies. No separate advance reservation was established in the readable application stage.", "provider_id": "carroll-emc", "provider_unit": "Carroll EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://carrollemc.com/ev/"}], "required_documents": "Online member/account, installation-address and contact details; uploaded driver’s-license/photo ID required by the readable first application stage; charger purchase/installation information and cooperative verification. Later multi-step fields beyond the captured stage may require additional records.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-carroll-emc-ev", "ga-carroll-emc-home-charger-rebate"], "source_url": "https://carrollemc.com/ev/", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A one-time rebate for Carroll EMC members who install a new Level 2 charger at home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Home Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3081"], "verified_date": "2026-10-13"}, {"administrator": "Grady EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250.00, applied as a credit on the member's bill; one per household.", "amount_formula": "$250.00, applied as a credit on the member's bill; one per household.", "application_route_notes": "Return the completed form to Grady EMC after installation for equipment verification.", "application_route_type": "form", "application_sequence": "Install and own the qualifying home charger; return the completed rebate form to Grady EMC; the cooperative verifies the equipment and completed installation before applying the household bill credit.", "application_url": "https://gradyemc.com/wp-content/uploads/2022/05/Electric-Vehicle-Charger-Rebate-converted.pdf", "application_url_source_id": "ga-grady-emc-ev-charger-rebate-form", "body": "A rebate, paid as a credit on the electric bill, for residential members who install a Level 2 or faster charger at home.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250.00, applied as a credit on the member's bill; one per household.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250.00, applied as a credit on the member's bill; one per household.", "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate, paid as a credit on the electric bill, for residential members who install a Level 2 or faster charger at home.", "effective_status": "open", "eligibility": "Residential members only, one per household; the charger must be Level 2 or greater, installed at the member's home, and verified by the co-op before the rebate is paid.", "equipment_conditions": "Residential members only, one per household; the charger must be Level 2 or greater, installed at the member's home, and verified by the co-op before the rebate is paid.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-grady-emc-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Rebate is for completed and verified equipment installation; confirm any advance authorization directly with Grady, as the form does not publish a separate reservation process.", "provider_id": "grady-emc", "provider_unit": "Grady EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://gradyemc.com/rebates-services/"}], "required_documents": "Rebate application and qualifying installation verification before bill credit", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-grady-emc-rebates-services", "ga-grady-emc-ev-charger-rebate-form"], "source_url": "https://gradyemc.com/rebates-services/", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate, paid as a credit on the electric bill, for residential members who install a Level 2 or faster charger at home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7450"], "verified_date": "2026-10-13"}, {"administrator": "Sumter EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250 for a Level 2 charger installed at the member's home.", "amount_formula": "$250 for a Level 2 charger installed at the member's home.", "application_route_notes": "Select Residential EV Charger and provide paid invoices and an installed-charger photo.", "application_route_type": "form", "application_sequence": "Buy from an outside vendor and install the Level 2 charger at the Sumter-served home; choose Residential EV Charger on the application and submit paid charger/installation invoices and the installed-charger photo within 60 days of installation.", "application_url": "https://sumteremc.coop/form/sumter-emc-rebate-application", "application_url_source_id": "ga-sumter-emc-rebate-application", "body": "A rebate for residential members who install a Level 2 charger at home.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 for a Level 2 charger installed at the member's home.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 for a Level 2 charger installed at the member's home.", "deadline": "No end date published; submit invoices within 60 days after the charger is installed.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate for residential members who install a Level 2 charger at home.", "effective_status": "open", "eligibility": "Residential Sumter EMC members installing a Level 2 charger at home in the Sumter EMC service territory, bought from an outside vendor; paid installation and charger invoices due within 60 days after installation.", "equipment_conditions": "Residential Sumter EMC members installing a Level 2 charger at home in the Sumter EMC service territory, bought from an outside vendor; paid installation and charger invoices due within 60 days after installation.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-sumter-emc-ev-charger-rebate-home", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Rebate (residential)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Outside-vendor purchase and completed installation precede submission; paid records and charger photo are due within 60 days of installation.", "provider_id": "sumter-emc", "provider_unit": "Sumter EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://sumteremc.coop/sumter-emc-rebates"}], "required_documents": "Residential EV Charger application with account/service/contact details, paid installation and charger invoices, and photo of the newly installed charger.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-sumter-emc-rebates", "ga-sumter-emc-rebate-application"], "source_url": "https://sumteremc.coop/sumter-emc-rebates", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate for residential members who install a Level 2 charger at home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Rebate (residential)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["18305"], "verified_date": "2026-10-13"}, {"administrator": "Sumter EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$500 per Level 2 or 3 charger installed at the business; up to 3 rebates per business.", "amount_formula": "$500 per Level 2 or 3 charger installed at the business; up to 3 rebates per business.", "application_route_notes": "Select Commercial EV Charger and provide paid invoices and an installed-charger photo.", "application_route_type": "form", "application_sequence": "Buy from an outside vendor and install the Level 2 or 3 charger at the Sumter-served business; choose Commercial EV Charger on the application and submit paid charger/installation invoices and the installed-charger photo within 60 days of installation.", "application_url": "https://sumteremc.coop/form/sumter-emc-rebate-application", "application_url_source_id": "ga-sumter-emc-rebate-application", "body": "A rebate for commercial members who install a Level 2 or Level 3 charger at their business.", "bucket": "money", "candidate_states": ["GA"], "cap": "$500 per Level 2 or 3 charger installed at the business; up to 3 rebates per business.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$500 per Level 2 or 3 charger installed at the business; up to 3 rebates per business.", "deadline": "No end date published; submit invoices within 60 days after the charger is installed.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate for commercial members who install a Level 2 or Level 3 charger at their business.", "effective_status": "open", "eligibility": "Commercial Sumter EMC members installing a Level 2 or 3 charger at their business in the Sumter EMC service territory, bought from an outside vendor; paid installation and charger invoices due within 60 days after installation.", "equipment_conditions": "Commercial Sumter EMC members installing a Level 2 or 3 charger at their business in the Sumter EMC service territory, bought from an outside vendor; paid installation and charger invoices due within 60 days after installation.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-sumter-emc-ev-charger-rebate-business", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Rebate (commercial)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Outside-vendor purchase and completed installation precede submission; paid records and charger photo are due within 60 days of installation.", "provider_id": "sumter-emc", "provider_unit": "Sumter EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://sumteremc.coop/sumter-emc-rebates"}], "required_documents": "Commercial EV Charger application with account/service/contact details, paid installation and charger invoices, and photo of the newly installed charger.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "PRIMARY", "source_ids": ["ga-sumter-emc-rebates", "ga-sumter-emc-rebate-application"], "source_url": "https://sumteremc.coop/sumter-emc-rebates", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate for commercial members who install a Level 2 or Level 3 charger at their business.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Rebate (commercial)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["18305"], "verified_date": "2026-10-13"}, {"administrator": "Snapping Shoals EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250.00 for a UL-rated Level 2 charger installed at home; one per member household.", "amount_formula": "$250.00 for a UL-rated Level 2 charger installed at home; one per member household.", "application_route_notes": "Use the charger form, separately from the vehicle bill-credit form.", "application_route_type": "form", "application_sequence": "Purchase and install the qualifying home charger; apply while the purchase is within the preceding 90 days, providing receipt, installation photo and serial-number photo. Provide the requested vehicle and account details and allow cooperative verification.", "application_url": "https://go.ssemc.com/form/electricvehiclecharger", "application_url_source_id": "ga-snapping-shoals-emc-ev-charger-form", "body": "A rebate for members who buy and install a UL-rated Level 2 charger at a home Snapping Shoals EMC serves.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250.00 for a UL-rated Level 2 charger installed at home; one per member household.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250.00 for a UL-rated Level 2 charger installed at home; one per member household.", "deadline": "No end date published; the co-op says its rebates may change or end at any time. Apply within 90 days of purchase.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate for members who buy and install a UL-rated Level 2 charger at a home Snapping Shoals EMC serves.", "effective_status": "open", "eligibility": "Current Snapping Shoals EMC members; charger must be UL-rated Level 2, on a dedicated circuit, in a home the co-op serves; adapters (including NEMA 14-50) do not qualify; invoices and a site visit to verify installation are required; bought within 90 days of applying.", "equipment_conditions": "Current Snapping Shoals EMC members; charger must be UL-rated Level 2, on a dedicated circuit, in a home the co-op serves; adapters (including NEMA 14-50) do not qualify; invoices and a site visit to verify installation are required; bought within 90 days of applying.", "excluded_costs": "NEMA 14-50 adapters do not qualify for the charger rebate.", "funding_limit": null, "geography_verified": true, "id": "ga-snapping-shoals-emc-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "The form requires purchase within the preceding 90 days and completed-installation/serial photographs; no separate pre-work reservation is established in the readable form.", "provider_id": "snapping-shoals-emc", "provider_unit": "Snapping Shoals EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://ssemc.com/energy-efficiency-rebates"}], "required_documents": "Account/service/contact and vehicle-year details, charger purchase/installation dates, UL/Level 2 declaration, receipt photo, installed-charger photo and charger serial-number photo.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-snapping-shoals-emc-rebates", "ga-snapping-shoals-emc-ev", "ga-snapping-shoals-emc-ev-charger-form"], "source_url": "https://ssemc.com/energy-efficiency-rebates", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate for members who buy and install a UL-rated Level 2 charger at a home Snapping Shoals EMC serves.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["17832"], "verified_date": "2026-10-13"}, {"administrator": "Sawnee EMC", "afdc_ids": [], "afdc_topics": [], "amount": "Half of the total cost, up to a maximum of $200 per Sawnee EMC member.", "amount_formula": "Half of the total cost, up to a maximum of $200 per Sawnee EMC member.", "application_route_notes": "The requirements page includes the actual application and rate-schedule selection.", "application_route_type": "form", "application_sequence": "Review charging capacity and the eligible time-based rates; buy and install the qualifying charger during the current year; submit the online application with purchase receipt, specification sheet and rate selection/commitment. Allow visual verification and remain on the qualifying rate for 12 consecutive months.", "application_url": "https://sawnee.coop/level-2-charger-rebate-requirements", "application_url_source_id": "ga-sawnee-emc-level-2-charger-rebate", "body": "A rebate, paid as a bill credit, for a residential member who installs a Level 2 charger for an all-electric car and keeps that meter on a time-of-use or EV rate for at least a year.", "bucket": "money", "candidate_states": ["GA"], "cap": "Half of the total cost, up to a maximum of $200 per Sawnee EMC member.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Half of the total cost, up to a maximum of $200 per Sawnee EMC member.", "deadline": "Requests for work completed in 2026 are due by December 31st; funds are available during the current calendar year while they remain.", "deadline_date": "2026-12-31", "disposition": "retained-current", "disposition_reason": "A rebate, paid as a bill credit, for a residential member who installs a Level 2 charger for an all-electric car and keeps that meter on a time-of-use or EV rate for at least a year.", "effective_status": "open", "eligibility": "Residential members whose charger meter is billed on the Residential Time of Use (TU), Critical Peak Pricing (CPPR) or Plug in Electric Vehicle (PEV) rate for at least 12 months (leaving the rate early brings back prior bills and a $200 rebate recall fee); all-electric vehicle, hybrids do not qualify; new 240-volt Level 2 charger rated 40 amps or more, UL or ETL listed, purchased and installed in the present year; portable, second-hand and vehicle-supplied units do not qualify; online application with receipt and specification sheet; Sawnee EMC verifies the installation.", "equipment_conditions": "Residential members whose charger meter is billed on the Residential Time of Use (TU), Critical Peak Pricing (CPPR) or Plug in Electric Vehicle (PEV) rate for at least 12 months (leaving the rate early brings back prior bills and a $200 rebate recall fee); all-electric vehicle, hybrids do not qualify; new 240-volt Level 2 charger rated 40 amps or more, UL or ETL listed, purchased and installed in the present year; portable, second-hand and vehicle-supplied units do not qualify; online application with receipt and specification sheet; Sawnee EMC verifies the installation.", "excluded_costs": "Portable, second-hand and vehicle-standard supplied chargers; hybrid vehicles; purchases/installations outside the present year.", "funding_limit": null, "geography_verified": true, "id": "ga-sawnee-emc-level-2-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Level 2 Charger Rebate (residential)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "A qualifying time-based rate or rate-change commitment is required; apply using the installed-charger records. Leaving the rate before 12 consecutive months triggers prior-bill adjustments and the stated rebate recall fee.", "provider_id": "sawnee-emc", "provider_unit": "Sawnee EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://sawnee.coop/level-2-charger-rebate-requirements"}], "required_documents": "Online application, charger receipt/specification sheet, qualifying electric vehicle and required rate enrollment; installation verification", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-sawnee-emc-level-2-charger-rebate", "ga-sawnee-emc-rebates-and-incentives"], "source_url": "https://sawnee.coop/level-2-charger-rebate-requirements", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate, paid as a bill credit, for a residential member who installs a Level 2 charger for an all-electric car and keeps that meter on a time-of-use or EV rate for at least a year.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Level 2 Charger Rebate (residential)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["16865"], "verified_date": "2026-10-13"}, {"administrator": "Sawnee EMC", "afdc_ids": [], "afdc_topics": [], "amount": "A 20% reduction of Contribution in Aid to Construction (CIAC) charges, up to a $2,000 maximum.", "amount_formula": "A 20% reduction of Contribution in Aid to Construction (CIAC) charges, up to a $2,000 maximum.", "application_route_notes": "The commercial DC fast-charger section directs members to Sawnee commercial marketing for the CIAC reduction details; no complete charger-specific form is published in the reviewed section.", "application_route_type": "contact-instructions", "application_sequence": "Contact Sawnee commercial marketing about the proposed Level 3/DC fast-charger project and its Contribution in Aid to Construction charges. Confirm the application, approval and cost basis before commitment; the reviewed listing does not publish a complete submission sequence.", "application_url": "https://sawnee.coop/rebates-and-incentives", "application_url_source_id": "ga-sawnee-emc-rebates-and-incentives", "body": "A reduction in the Contribution in Aid to Construction (CIAC) charges a commercial member pays Sawnee EMC when installing a Level 3/DC fast charger.", "bucket": "money", "candidate_states": ["GA"], "cap": "A 20% reduction of Contribution in Aid to Construction (CIAC) charges, up to a $2,000 maximum.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "A 20% reduction of Contribution in Aid to Construction (CIAC) charges, up to a $2,000 maximum.", "deadline": "No end date published for this item; the rebates page covers work completed in 2026, with requests due by December 31st.", "deadline_date": "2026-12-31", "disposition": "retained-current", "disposition_reason": "A reduction in the Contribution in Aid to Construction (CIAC) charges a commercial member pays Sawnee EMC when installing a Level 3/DC fast charger.", "effective_status": "open", "eligibility": "Listed under Sawnee EMC's Commercial Rebates, for installing a Level 3/DC fast charger; applies to the member's Contribution in Aid to Construction (CIAC) charges. The page gives no other conditions and sends members to Sawnee's commercial marketing department for details.", "equipment_conditions": "Listed under Sawnee EMC's Commercial Rebates, for installing a Level 3/DC fast charger; applies to the member's Contribution in Aid to Construction (CIAC) charges. The page gives no other conditions and sends members to Sawnee's commercial marketing department for details.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-sawnee-emc-dc-fast-charger-ciac-reduction", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Level 3/DC Fast Charger construction charge reduction (commercial)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "sawnee-emc", "provider_unit": "Sawnee EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://sawnee.coop/rebates-and-incentives"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "PRIMARY", "source_ids": ["ga-sawnee-emc-rebates-and-incentives"], "source_url": "https://sawnee.coop/rebates-and-incentives", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A reduction in the Contribution in Aid to Construction (CIAC) charges a commercial member pays Sawnee EMC when installing a Level 3/DC fast charger.", "superseded_by": null, "technologies": ["DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Level 3/DC Fast Charger construction charge reduction (commercial)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["16865"], "verified_date": "2026-10-13"}, {"administrator": "Diverse Power", "afdc_ids": [], "afdc_topics": [], "amount": "$250 per new Level 2 charger; $50 per qualifying home charging outlet. The current page and form disagree on one outlet designation (12-30 versus 14-30); confirm that choice with Diverse Power.", "amount_formula": "$250 per new Level 2 charger; $50 per NEMA 14-50 or 12-30 outlet installed at the home for a Level II charger.", "application_route_notes": "Use the EV rebate form with receipts and vehicle/charger photograph; the charger and outlet choices are separate.", "application_route_type": "form", "application_sequence": "Obtain required permits and owner permission; install the new customer-purchased Level 2 charger or qualifying outlet; submit the EV rebate form with sales receipt, installation invoice and vehicle/charger photograph within 60 days of installation. Diverse Power verifies the equipment before the applicable rebate is processed.", "application_url": "https://www.diversepower.com/content/uploads/DPI-EV-Rebate-Form.pdf", "application_url_source_id": "ga-diverse-power-ev-rebate-form", "body": "A rebate for each new Level 2 charger a single-family residential member installs, plus a rebate for each dedicated charger outlet.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 per new Level 2 charger; $50 per qualifying outlet; confirm the inconsistent 12-30/14-30 designation before relying on eligibility.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 per new Level 2 charger; $50 per NEMA 14-50 or 12-30 outlet installed at the home for a Level II charger.", "deadline": "No end date published; the request is due within sixty (60) days after the charger is installed, and Diverse Power may cancel or modify the programs at any time.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate for each new Level 2 charger a single-family residential member installs, plus a rebate for each dedicated charger outlet.", "effective_status": "open", "eligibility": "Single-family residential Diverse Power customers who own the property or have the owner's permission; new Level 2 (208/240 volt) charger on a dedicated circuit, purchased by the customer (not used, rented, gifted or won); permits obtained before installation; rebate request form with the installation invoice within sixty (60) days of installation; installations subject to verification. The rebate form also requires owning an EV (hybrids do not qualify).", "equipment_conditions": "Single-family residential Diverse Power customers who own the property or have the owner's permission; new Level 2 (208/240 volt) charger on a dedicated circuit, purchased by the customer (not used, rented, gifted or won); permits obtained before installation; rebate request form with the installation invoice within sixty (60) days of installation; installations subject to verification. The rebate form also requires owning an EV (hybrids do not qualify).", "excluded_costs": "Used, refurbished, rented, gifted or raffle/giveaway chargers; hybrid vehicles; nonresidential customers.", "funding_limit": null, "geography_verified": true, "id": "ga-diverse-power-residential-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Residential EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Obtain permits and owner permission where applicable; request follows completed installation and is due within 60 days. Administrator verification is separate from those permissions.", "provider_id": "diverse-power", "provider_unit": "Diverse Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.diversepower.com/drivefree/"}], "required_documents": "Completed EV rebate form; charger/outlet sales receipt; installation invoice within 60 days; photograph of the vehicle or charger; member/site/EV and equipment details; applicable permit and owner permission. Diverse Power verifies completed installations.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-diverse-power-drive-free", "ga-diverse-power-ev-rebate-form"], "source_url": "https://www.diversepower.com/drivefree/", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate for each new Level 2 charger a single-family residential member installs, plus a rebate for each dedicated charger outlet.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Residential EV Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": ["The current landing page names a 12-30 outlet, while its rebate form names 14-30. Confirm the approved outlet type with Diverse Power; do not rely on the inconsistent designation."], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["19219"], "verified_date": "2026-10-13"}, {"administrator": "Tri-County EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250 credit applied to the Tri-County EMC bill.", "amount_formula": "$250 credit applied to the Tri-County EMC bill.", "application_route_notes": "Use the EV365 Charger Incentive form, not the separate vehicle-purchase incentive.", "application_route_type": "form", "application_sequence": "Purchase and install the NRTL-certified Level 2-or-higher charger at the member home or business; submit the EV365 Charger Incentive form with proof of purchase, charger details and installer name; allow any cooperative inspection before the bill credit.", "application_url": "https://form.jotform.com/200083594631048", "application_url_source_id": "ga-tri-county-emc-charger-incentive-application", "body": "A rebate, applied as a credit on the Tri-County EMC bill, for buying and installing a certified Level 2 charger at a home or business.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 credit applied to the Tri-County EMC bill.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 credit applied to the Tri-County EMC bill.", "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate, applied as a credit on the Tri-County EMC bill, for buying and installing a certified Level 2 charger at a home or business.", "effective_status": "open", "eligibility": "Tri-County EMC members, at a home or business; any NRTL certified Level 2 charger or higher, purchased and installed; application with proof of purchase and the installer's name; the co-op may inspect the installation. The page says restrictions apply and refers to the application for details.", "equipment_conditions": "Tri-County EMC members, at a home or business; any NRTL certified Level 2 charger or higher, purchased and installed; application with proof of purchase and the installer's name; the co-op may inspect the installation. The page says restrictions apply and refers to the application for details.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-tri-county-emc-level-2-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Level 2 (240V) Electric Vehicle Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "The form requires purchased equipment and installer information; the cooperative may inspect before bill credit. A separate advance funds reservation is not established.", "provider_id": "tri-county-emc", "provider_unit": "Tri-County EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://tri-countyemc.com/electric-vehicles"}], "required_documents": "Rebate application, purchase proof and installer's name; cooperative may inspect", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home", "business"], "source_grade": "PRIMARY", "source_ids": ["ga-tri-county-emc-electric-vehicles", "ga-tri-county-emc-ev-incentives", "ga-tri-county-emc-charger-incentive-application"], "source_url": "https://tri-countyemc.com/electric-vehicles", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate, applied as a credit on the Tri-County EMC bill, for buying and installing a certified Level 2 charger at a home or business.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Level 2 (240V) Electric Vehicle Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["18956"], "verified_date": "2026-10-13"}, {"administrator": "City of LaGrange", "afdc_ids": [], "afdc_topics": [], "amount": "$250 one-time payment for a Level 2 (208/240V) charger.", "amount_formula": "$250 one-time payment for a Level 2 (208/240V) charger.", "application_route_notes": "The PDF includes the request form and the utility email/mail instructions.", "application_route_type": "form", "application_sequence": "Obtain the required permits and inspections and install the new customer-purchased Level 2 charger; send the signed request with paid charger and installation invoices to the stated city utility email or mail address within 60 days of installation; allow visual verification.", "application_url": "https://cms3.revize.com/revize/lagrangeGA/Documents/Department/Utilities/Electric%20Vehicle%20Charger%20Rebate.pdf", "application_url_source_id": "ga-lagrange-ev-charger-rebate", "body": "A one-time rebate from the City of LaGrange electric utility for a new Level 2 charger that its customer buys and installs.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 one-time payment for a Level 2 (208/240V) charger.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 one-time payment for a Level 2 (208/240V) charger.", "deadline": "No end date published; the request form is due within 60 days after the charger is installed, and the city may cancel or modify the program at any time.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A one-time rebate from the City of LaGrange electric utility for a new Level 2 charger that its customer buys and installs.", "effective_status": "open", "eligibility": "City of LaGrange electric customers who own the property or have the owner's permission. The schedule says any City of LaGrange electric customer, but the request form calls it the Residential Electric Vehicle Charger Rebate Program. New, customer-purchased Level 2 (208/240V) charger; permits and inspections through the city building office; request form with paid installation and charger invoices within 60 days of installation; subject to visual verification by the city electric department.", "equipment_conditions": "City of LaGrange electric customers who own the property or have the owner's permission. The schedule says any City of LaGrange electric customer, but the request form calls it the Residential Electric Vehicle Charger Rebate Program. New, customer-purchased Level 2 (208/240V) charger; permits and inspections through the city building office; request form with paid installation and charger invoices within 60 days of installation; subject to visual verification by the city electric department.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-lagrange-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Obtain required permits/inspections; submit the completed-installation request within 60 days. The utility may visually verify equipment before credit.", "provider_id": "city-of-lagrange", "provider_unit": "City of LaGrange", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://cms3.revize.com/revize/lagrangeGA/Documents/Department/Utilities/Electric%20Vehicle%20Charger%20Rebate.pdf"}], "required_documents": "Residential request form, paid charger/install invoices within 60 days, permit/inspection and owner authority; city may visually verify", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-lagrange-ev-charger-rebate", "ga-lagrange-utilities-documents"], "source_url": "https://cms3.revize.com/revize/lagrangeGA/Documents/Department/Utilities/Electric%20Vehicle%20Charger%20Rebate.pdf", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A one-time rebate from the City of LaGrange electric utility for a new Level 2 charger that its customer buys and installs.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["10585"], "verified_date": "2026-10-13"}, {"administrator": "Cobb EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$500 to $5,000 per grant; Cobb EMC sets the amount for each application.", "amount_formula": "$500 to $5,000 per grant; Cobb EMC sets the amount for each application.", "application_route_notes": "Commercial grant application and acknowledgements; submit to the stated commercial accounts email or mail address.", "application_route_type": "form", "application_sequence": "Submit the commercial grant application, W-9, site information, proposal and supporting records for Cobb EMC evaluation; confirm the approved grant amount and install the project as described. Provide final paid invoices, branded-installation photos and permits; payment follows verification. The form accepts proposed project information and does not make every application a post-installation-only claim.", "application_url": "https://cobbemc.com/sites/default/files/documents/ev/EVGrantApplicationFinal.pdf", "application_url_source_id": "ga-cobb-emc-ev-grant-application", "body": "A grant of $500 to $5,000 toward buying and installing Level 2 or Level 3 EV chargers for non-residential Cobb EMC members, set per application, with preference for chargers open to the public or serving the most EV users.", "bucket": "money", "candidate_states": ["GA"], "cap": "$500 to $5,000 per grant; Cobb EMC sets the amount for each application.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$500 to $5,000 per grant; Cobb EMC sets the amount for each application.", "deadline": "No end date published; applications accepted until the program's funds are exhausted.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A grant of $500 to $5,000 toward buying and installing Level 2 or Level 3 EV chargers for non-residential Cobb EMC members, set per application, with preference for chargers open to the public or serving the most EV users.", "effective_status": "open", "eligibility": "Non-residential members: businesses and commercial property owners, multifamily owners and operators, government agencies. Charger at an address with an active Cobb EMC meter; one application per member address; Cobb EMC says within 5 business days of the application whether a grant is awarded, then the member buys and installs; stations installed and in operation on or after January 1, 2019; installed by a qualified, licensed contractor; wheel stop or bollard and Cobb EMC branding on the station; kept working for at least three years; charger vendors and EV charging businesses are not eligible.", "equipment_conditions": "Non-residential members: businesses and commercial property owners, multifamily owners and operators, government agencies. Charger at an address with an active Cobb EMC meter; one application per member address; Cobb EMC says within 5 business days of the application whether a grant is awarded, then the member buys and installs; stations installed and in operation on or after January 1, 2019; installed by a qualified, licensed contractor; wheel stop or bollard and Cobb EMC branding on the station; kept working for at least three years; charger vendors and EV charging businesses are not eligible.", "excluded_costs": "EV charger vendors and EV charging businesses are ineligible; customer electricity and maintenance/repair remain the applicant’s responsibility.", "funding_limit": null, "geography_verified": true, "id": "ga-cobb-emc-ev-grant-commercial", "kind": "grant", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Grant Program (commercial EV chargers)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Submit the proposed or completed project for grant evaluation. The application describes award notification before project completion; final grant distribution requires a verified installation matching the application. A submitted application is not an approved grant.", "provider_id": "cobb-emc", "provider_unit": "Cobb EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cobbemc.com/ev-charging-business"}], "required_documents": "Completed signed grant application/acknowledgements, company W-9, tax/account/meter/site information, authority or owner permission, bids/proposals and equipment make/model/ports/cost details, usage research if conducted, proposed-site photos and applicable permits. Final distribution requires paid equipment/installation invoices with purchase/install dates, installed-charger photos with Cobb branding and required building permits.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["ga-cobb-emc-ev-charging-business", "ga-cobb-emc-ev-grant-requirements", "ga-cobb-emc-ev-grant-application"], "source_url": "https://www.cobbemc.com/ev-charging-business", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A grant of $500 to $5,000 toward buying and installing Level 2 or Level 3 EV chargers for non-residential Cobb EMC members, set per application, with preference for chargers open to the public or serving the most EV users.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Grant Program (commercial EV chargers)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3916"], "verified_date": "2026-10-13"}, {"administrator": "Cobb EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250 bill credit; at most one of each Energy Network incentive every five years.", "amount_formula": "$250 bill credit; at most one of each Energy Network incentive every five years.", "application_route_notes": "Energy Network enrollment/incentive request; supporting documents follow request approval.", "application_route_type": "portal", "application_sequence": "Purchase/install the eligible charger in the request calendar year; enroll/request the incentive through the Energy Network form. Once approved, submit the requested dated receipts and supporting documents within 60 days of request approval; receive the approved bill credit and meet charging-data, survey and two-focus-group commitments.", "application_url": "https://cobbemcforms.powerappsportals.com/Enrollment-Form/", "application_url_source_id": "ga-cobb-emc-ev-charger-incentive", "body": "A $250 bill credit for a residential member who installs an ENERGY STAR certified Level 2 smart charger at a single-family home and joins Cobb EMC's Energy Network.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 bill credit; at most one of each Energy Network incentive every five years.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 bill credit; at most one of each Energy Network incentive every five years.", "deadline": "No end date published; incentives are limited and first-come, first-served, and the charger must be bought and installed in the calendar year the incentive is requested.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $250 bill credit for a residential member who installs an ENERGY STAR certified Level 2 smart charger at a single-family home and joins Cobb EMC's Energy Network.", "effective_status": "open", "eligibility": "Residential members living in single-family homes; a smart, ENERGY STAR certified Level 2 charger installed at the service address; bought and installed in the calendar year the incentive is requested; enroll in the Energy Network (surveys and two focus groups) and share EV charging data; accounts current; paperwork within 60 days of approval.", "equipment_conditions": "Residential members living in single-family homes; a smart, ENERGY STAR certified Level 2 charger installed at the service address; bought and installed in the calendar year the incentive is requested; enroll in the Energy Network (surveys and two focus groups) and share EV charging data; accounts current; paperwork within 60 days of approval.", "excluded_costs": "Prior-calendar-year purchases/installations and any incentive exceeding the improvement’s actual cost; not an unrestricted rebate without Energy Network participation.", "funding_limit": null, "geography_verified": true, "id": "ga-cobb-emc-ev-charger-incentive-home", "kind": "bill credit", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Incentive (Energy Network)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Purchase/install during the request calendar year and request Energy Network enrollment/incentive approval; submit all follow-up records within 60 days of request approval.", "provider_id": "cobb-emc", "provider_unit": "Cobb EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.cobbemc.com/ev-charger-incentive"}], "required_documents": "Energy Network enrollment, qualifying calendar-year installation/account details, data-sharing agreement and required paperwork within 60 days of approval", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-cobb-emc-ev-charger-incentive", "ga-cobb-emc-electric-vehicles"], "source_url": "https://www.cobbemc.com/ev-charger-incentive", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A $250 bill credit for a residential member who installs an ENERGY STAR certified Level 2 smart charger at a single-family home and joins Cobb EMC's Energy Network.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charger Incentive (Energy Network)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3916"], "verified_date": "2026-10-13"}, {"administrator": "Jackson EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250 on a residential Level 2 charger.", "amount_formula": "$250 on a residential Level 2 charger.", "application_route_notes": "Current 2026 outside-purchase form. A qualifying purchase through Jackson EMC Marketplace uses its separate instant-discount route.", "application_route_type": "form", "application_sequence": "For the instant route, buy qualifying equipment through Jackson EMC Marketplace. For an outside purchase, use the current 2026 signed rebate application with charger purchase proof and EV bill of sale or registration and send it to the listed Jackson EMC email/mail/fax destination. Do not apply the 2024-only form to a current purchase.", "application_url": "https://c90142psta001public.blob.core.windows.net/chooseev/jackson/Electric%20Vehicle%20Rebate%20Application%202026.pdf", "application_url_source_id": "ga-jackson-ev-rebate-application-2026", "body": "A $250 rebate for residential members on a Level 2 EV charger, taken instantly when bought through the Jackson EMC Marketplace or claimed by mail-in application for a charger bought elsewhere.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 per qualifying charger, maximum two per home; subject to remaining funding.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "New residential Level 2 charger purchase; $250 per charger, maximum two per home under the current 2026 form.", "deadline": "Current form is valid for purchases made in 2026 until funding is depleted; revised December 12, 2025. The superseded 2024 form does not control current purchases.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $250 rebate for residential members on a Level 2 EV charger, taken instantly when bought through the Jackson EMC Marketplace or claimed by mail-in application for a charger bought elsewhere.", "effective_status": "open", "eligibility": "Jackson EMC residential members; new Level 2 charger, maximum two per home. Current 2026 application excludes adapters, installation costs and points/credits purchases; outside purchases require signed form, charger receipt and EV bill of sale/registration. Marketplace purchases use the instant route.", "equipment_conditions": "Jackson EMC residential members; new Level 2 charger, maximum two per home. Current 2026 application excludes adapters, installation costs and points/credits purchases; outside purchases require signed form, charger receipt and EV bill of sale/registration. Marketplace purchases use the instant route.", "excluded_costs": "Adapters, installation labor and purchases using points/credits; no duplicate rebate for marketplace-discounted purchase", "funding_limit": null, "geography_verified": true, "id": "ga-jackson-emc-level-2-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Level 2 Electric Vehicle Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Marketplace discount occurs at purchase; outside purchase route uses post-purchase application and evidence.", "provider_id": "jackson-emc", "provider_unit": "Jackson EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.jacksonemc.com/member-services/home-services/rebates-incentives-loans"}], "required_documents": "Marketplace route validates purchase; outside purchase needs signed application, receipt and EV bill of sale/registration", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-jackson-emc-rebates", "ga-jackson-emc-ev-toolkit-promos", "ga-jackson-emc-marketplace", "ga-jackson-emc-marketplace-ev-chargers", "ga-jackson-emc-ev-rebate-application-2024", "ga-jackson-ev-rebate-application-2026"], "source_url": "https://www.jacksonemc.com/member-services/home-services/rebates-incentives-loans", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A $250 rebate for residential members on a Level 2 EV charger, taken instantly when bought through the Jackson EMC Marketplace or claimed by mail-in application for a charger bought elsewhere.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Qualifying electricity accounts and installations within the named cooperative's service territory only.", "title": "Level 2 Electric Vehicle Charger Rebate", "unknown_fields": ["unpublished remaining funds", "terms not stated on application", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["9601"], "verified_date": "2026-10-13"}, {"administrator": "GreyStone Power Corporation", "afdc_ids": [], "afdc_topics": [], "amount": "$250 rebate check; one per household.", "amount_formula": "$250 rebate check; one per household.", "application_route_notes": "Use the post-installation EV charger request with the retailer receipt and installed-charger photograph.", "application_route_type": "form", "application_sequence": "Purchase and have the qualifying hardwired charger installed at the active GreyStone residence; apply while both purchase and installation are within the last 90 days, attaching the full retailer receipt and mounted-charger photo; allow verification before approval.", "application_url": "https://greystonepower.formtracking.com/forms/wss/form48.html", "application_url_source_id": "ga-greystone-ev-rebate-form", "body": "A $250 rebate check for a residential member who buys and installs a hardwired Level 2 charger at their GreyStone Power home.", "bucket": "money", "candidate_states": ["GA"], "cap": "$250 rebate check; one per household.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 rebate check; one per household.", "deadline": "No end date published; the request must come within 90 days of purchase and installation.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $250 rebate check for a residential member who buys and installs a hardwired Level 2 charger at their GreyStone Power home.", "effective_status": "open", "eligibility": "Residential members; a Level 2, UL safety rated charger, hardwired and mounted at the member's active GreyStone Power residence; bought and installed within the last 90 days; full purchase receipt and a photo of the installed charger; may be verified on site. Not eligible: adapters and portable chargers, chargers bought through the GreyStone Power Marketplace or other utility marketplaces, electrical labor, complimentary chargers and private sales.", "equipment_conditions": "Residential members; a Level 2, UL safety rated charger, hardwired and mounted at the member's active GreyStone Power residence; bought and installed within the last 90 days; full purchase receipt and a photo of the installed charger; may be verified on site. Not eligible: adapters and portable chargers, chargers bought through the GreyStone Power Marketplace or other utility marketplaces, electrical labor, complimentary chargers and private sales.", "excluded_costs": "Adapters/portable chargers, utility-marketplace purchases, electrical labor, complimentary units and private sales", "funding_limit": null, "geography_verified": true, "id": "ga-greystone-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Apply after the qualifying purchase and installation, both within the previous 90 days; the form reserves verification and approval to GreyStone.", "provider_id": "greystone-power-corporation", "provider_unit": "GreyStone Power Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.greystonepower.com/rebates"}], "required_documents": "Application, full charger receipt and installed-equipment photo; installation may be inspected", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-greystone-rebates", "ga-greystone-ev-rebate-form"], "source_url": "https://www.greystonepower.com/rebates", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A $250 rebate check for a residential member who buys and installs a hardwired Level 2 charger at their GreyStone Power home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle (EV) Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7090"], "verified_date": "2026-10-13"}, {"administrator": "Coweta-Fayette EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$100 for the installation of a Level 2 charging station.", "amount_formula": "$100 for the installation of a Level 2 charging station.", "application_route_notes": "The current NEMA-outlet offer says to contact JAdams@utility.org for restrictions and application details.", "application_route_type": "contact-instructions", "application_sequence": "Contact the administrator named on the current NEMA-outlet offer to confirm the qualifying installation, approval timing and documentation. The reviewed listing does not establish a complete application or reimbursement sequence.", "application_url": "https://coweta-fayette.upgrade.guide/ev/ev/promos/", "application_url_source_id": "ga-coweta-fayette-emc-ev-toolkit-promos", "body": "A $100 rebate for installing a Level 2 (240 volt) NRTL/UL approved EV charging station at a member's home.", "bucket": "money", "candidate_states": ["GA"], "cap": "$100 for the installation of a Level 2 charging station.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$100 for the installation of a Level 2 charging station.", "deadline": "No end date published; the purchase must be within the last 12 months.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $100 rebate for installing a Level 2 (240 volt) NRTL/UL approved EV charging station at a member's home.", "effective_status": "open", "eligibility": "Members' existing homes (SmartChoice Home rebates) and new homes in the SmartChoice New Home program; a Level 2 (240 volt) NRTL/UL approved charging station, which requires a NEMA 14-50 outlet; purchase within the last 12 months; the co-op says restrictions apply and to contact its Energy Services representatives.", "equipment_conditions": "Members' existing homes (SmartChoice Home rebates) and new homes in the SmartChoice New Home program; a Level 2 (240 volt) NRTL/UL approved charging station, which requires a NEMA 14-50 outlet; purchase within the last 12 months; the co-op says restrictions apply and to contact its Energy Services representatives.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-coweta-fayette-emc-ev-charging-station-rebate-home", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV charging station rebate (SmartChoice Home)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "coweta-fayette-emc", "provider_unit": "Coweta-Fayette EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://utility.org/smart-choice-home/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-coweta-fayette-emc-smart-choice-home", "ga-coweta-fayette-emc-ev", "ga-coweta-fayette-emc-ev-toolkit-promos"], "source_url": "https://utility.org/smart-choice-home/", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "open", "summary": "A $100 rebate for installing a Level 2 (240 volt) NRTL/UL approved EV charging station at a member's home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV charging station rebate (SmartChoice Home)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["4432"], "verified_date": "2026-10-13"}, {"administrator": "Coweta-Fayette EMC", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "Coweta-Fayette EMC lists rebates for commercial electric vehicle charging stations among its commercial energy-efficiency rebates; the page publishes no amount or terms.", "bucket": "money", "candidate_states": ["GA"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "No end date published.", "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Current primary page lists commercial charger rebates but does not establish current application acceptance, amount or controlling eligibility terms.", "effective_status": "unverified", "eligibility": "Commercial and industrial members; no other terms published.", "equipment_conditions": "Commercial and industrial members; no other terms published.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ga-coweta-fayette-emc-commercial-ev-charging-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Commercial EV charging station rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "coweta-fayette-emc", "provider_unit": "Coweta-Fayette EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://utility.org/commercial-energy-efficiency/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business"], "source_grade": "PRIMARY", "source_ids": ["ga-coweta-fayette-emc-commercial-ee"], "source_url": "https://utility.org/commercial-energy-efficiency/", "stacking_rules": null, "state": "GA", "states": ["GA"], "status": "unverified", "summary": "Coweta-Fayette EMC lists rebates for commercial electric vehicle charging stations among its commercial energy-efficiency rebates; the page publishes no amount or terms.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Commercial EV charging station rebate", "unknown_fields": ["unpublished rebate amount", "cost eligibility/cap", "complete application checklist", "approval/equipment/site rules", "current funding balance", "deadline", "current application acceptance"], "unresolved_conditions": ["Current primary page lists commercial charger rebates but does not establish current application acceptance, amount or controlling eligibility terms."], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["4432"], "verified_date": "2026-10-13"}, {"administrator": "Duke Energy Carolinas", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-carolinas-charger-prep-credit-business", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, business (Duke Energy Carolinas)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-carolinas", "provider_unit": "Duke Energy Carolinas", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=NC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-carolinas-cpc-business"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=NC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, business (Duke Energy Carolinas)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416"], "verified_date": null}, {"administrator": "Duke Energy Progress", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-progress-charger-prep-credit-business", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, business (Duke Energy Progress)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-progress", "provider_unit": "Duke Energy Progress", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=NC02"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-progress-cpc-business"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=NC02", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, business (Duke Energy Progress)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["3046"], "verified_date": null}, {"administrator": "Duke Energy Carolinas", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "sc-duke-carolinas-charger-prep-credit-business", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, business (Duke Energy Carolinas)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-carolinas", "provider_unit": "Duke Energy Carolinas", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=SC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-sc-carolinas-cpc-business", "duke-sc-carolinas-make-ready-tariff"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=SC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, business (Duke Energy Carolinas)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416"], "verified_date": null}, {"administrator": "Duke Energy Progress", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "sc-duke-progress-charger-prep-credit-business", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, business (Duke Energy Progress)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-progress", "provider_unit": "Duke Energy Progress", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=SC02"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-sc-progress-cpc-business"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=SC02", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, business (Duke Energy Progress)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["3046"], "verified_date": null}, {"administrator": "Duke Energy Florida", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-duke-energy-florida-charger-prep-credit-business", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, business (Duke Energy Florida)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-florida", "provider_unit": "Duke Energy Florida", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=FL01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-fl-cpc-business"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/charger-prep-credit?jur=FL01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, business (Duke Energy Florida)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["6455"], "verified_date": null}, {"administrator": "Duke Energy Carolinas", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-carolinas-charger-prep-credit-home", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, home (Duke Energy Carolinas)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-carolinas", "provider_unit": "Duke Energy Carolinas", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=NC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-carolinas-cpc-home", "duke-nc-carolinas-cpc-home-customer-option"], "source_url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=NC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, home (Duke Energy Carolinas)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416"], "verified_date": null}, {"administrator": "Duke Energy Progress", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-progress-charger-prep-credit-home", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, home (Duke Energy Progress)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-progress", "provider_unit": "Duke Energy Progress", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=NC02"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-progress-cpc-home", "duke-nc-progress-cpc-home-customer-option"], "source_url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=NC02", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, home (Duke Energy Progress)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["3046"], "verified_date": null}, {"administrator": "Duke Energy Carolinas", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "sc-duke-carolinas-charger-prep-credit-home", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, home (Duke Energy Carolinas)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-carolinas", "provider_unit": "Duke Energy Carolinas", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=SC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-sc-carolinas-cpc-home", "duke-sc-carolinas-cpc-home-customer-option", "duke-sc-carolinas-make-ready-tariff"], "source_url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=SC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, home (Duke Energy Carolinas)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416"], "verified_date": null}, {"administrator": "Duke Energy Progress", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "sc-duke-progress-charger-prep-credit-home", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, home (Duke Energy Progress)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-progress", "provider_unit": "Duke Energy Progress", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=SC02"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-sc-progress-cpc-home", "duke-sc-progress-cpc-home-customer-option"], "source_url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=SC02", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, home (Duke Energy Progress)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["3046"], "verified_date": null}, {"administrator": "Duke Energy Florida", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-duke-energy-florida-charger-prep-credit-home", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Charger Prep Credit, home (Duke Energy Florida)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-florida", "provider_unit": "Duke Energy Florida", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=FL01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-fl-cpc-home", "duke-fl-cpc-home-customer-option"], "source_url": "https://www.duke-energy.com/home/products/ev-complete/charger-prep-credit?jur=FL01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Charger Prep Credit, home (Duke Energy Florida)", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["6455"], "verified_date": null}, {"administrator": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-homebuilder-charger-prep-credit", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Homebuilder Charger Prep Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-duke-energy-carolinas-and-duke-energy-progress", "provider_unit": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=NC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-carolinas-homebuilder-credit", "duke-nc-progress-homebuilder-credit"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=NC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Homebuilder Charger Prep Credit", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416", "3046"], "verified_date": null}, {"administrator": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["SC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "sc-duke-homebuilder-charger-prep-credit", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Homebuilder Charger Prep Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-duke-energy-carolinas-and-duke-energy-progress", "provider_unit": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=SC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-sc-carolinas-homebuilder-credit", "duke-sc-progress-homebuilder-credit", "duke-sc-carolinas-make-ready-tariff"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=SC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Homebuilder Charger Prep Credit", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416", "3046"], "verified_date": null}, {"administrator": "Duke Energy Florida", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["FL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "fl-duke-homebuilder-charger-prep-credit", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Homebuilder Charger Prep Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-florida", "provider_unit": "Duke Energy Florida", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=FL01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["duke-fl-homebuilder-credit"], "source_url": "https://www.duke-energy.com/business/products/ev-complete/homebuilder-prep-credit?jur=FL01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Homebuilder Charger Prep Credit", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["6455"], "verified_date": null}, {"administrator": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "nc-duke-park-and-plug-public-level-2", "kind": "free equipment", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Park & Plug public Level 2 chargers", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "duke-energy-duke-energy-carolinas-and-duke-energy-progress", "provider_unit": "Duke Energy (Duke Energy Carolinas and Duke Energy Progress)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.duke-energy.com/business/products/park-and-plug/public-level-2-chargers?jur=NC01"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "UNVERIFIED", "source_ids": ["duke-nc-carolinas-park-and-plug-level-2", "duke-nc-progress-park-and-plug-level-2", "duke-nc-park-and-plug"], "source_url": "https://www.duke-energy.com/business/products/park-and-plug/public-level-2-chargers?jur=NC01", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Duke's current regional pages returned a location-selection shell; public-browser retrieval also returned 403. A surviving tariff or old launch article does not verify every current regional amount, applicant class and deadline.", "superseded_by": null, "technologies": [], "territory": null, "title": "Park & Plug public Level 2 chargers", "unknown_fields": ["current regional status", "amount/cap", "equipment", "preapproval", "application window"], "unresolved_conditions": ["Region-specific current administrator terms unavailable", "Separate Duke Energy Carolinas, Duke Energy Progress and Florida are not interchangeable", "Browser alternative attempted; current page returned 403"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["5416", "3046"], "verified_date": null}, {"administrator": "Georgia Power", "afdc_ids": [], "afdc_topics": [], "amount": "Level 2 at $250/kW and DC fast at $150/kW; up to $30,000 per project and $60,000 per year, and never more than 50% of the charger, installation and material cost.", "amount_formula": "Level 2 at $250/kW and DC fast at $150/kW; up to $30,000 per project and $60,000 per year, and never more than 50% of the charger, installation and material cost.", "application_route_notes": "Charger Plus application; obtain program approval before installing newly purchased equipment.", "application_route_type": "portal", "application_sequence": "Apply for program participation and obtain Georgia Power approval before installing newly purchased equipment; coordinate utility service and obtain permits; install qualifying EVSE with the qualified contractor; submit site plans, paid equipment/installation invoices and required documents. The terms also state the calendar-year/six-month rebate-submission limit; do not treat that limit as permission to skip pre-installation approval.", "application_url": "https://gpcevchargerplus.customerapplication.com/", "application_url_source_id": "ga-georgia-power-charger-plus-rebate", "body": "A rebate on each new Level 2 or DC fast charger a Georgia Power business customer installs, paid by the charger's power rating.", "bucket": "money", "candidate_states": ["GA"], "cap": "Level 2 at $250/kW and DC fast at $150/kW; up to $30,000 per project and $60,000 per year, and never more than 50% of the charger, installation and material cost.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Level 2 at $250/kW and DC fast at $150/kW; up to $30,000 per project and $60,000 per year, and never more than 50% of the charger, installation and material cost.", "deadline": "No end date published; available while funds last. Apply within the calendar year or within 6 months after installation.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate on each new Level 2 or DC fast charger a Georgia Power business customer installs, paid by the charger's power rating.", "effective_status": "open", "eligibility": "Georgia Power business customers on a commercial or industrial rate with an active, permanent account. Chargers must be new, NRTL-certified, at least Level 2 (208/240 V) on a dedicated circuit, no portable connectors, installed by a licensed electrician within the current calendar year. Pre-approval is recommended but not required. Cannot be combined with the Make Ready program.", "equipment_conditions": "Georgia Power business customers on a commercial or industrial rate with an active, permanent account. Chargers must be new, NRTL-certified, at least Level 2 (208/240 V) on a dedicated circuit, no portable connectors, installed by a licensed electrician within the current calendar year. Pre-approval is recommended but not required. Cannot be combined with the Make Ready program.", "excluded_costs": "Mobile/portable connectors and used/refurbished/remanufactured equipment; utility-owned distribution assets are excluded from the defined applicant-side ET infrastructure. Applicant pays ongoing electricity and vendor costs.", "funding_limit": null, "geography_verified": true, "id": "ga-georgia-power-charger-plus-business", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Business EV Charger Plus Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Current terms require application approval before installing newly purchased equipment. They also state a calendar-year or no-more-than-six-month post-installation rebate-submission limit; obtain the administrator’s pre-installation approval rather than treating the latter as an exemption.", "provider_id": "georgia-power", "provider_unit": "Georgia Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/electric-vehicle-charger-rebate.html"}], "required_documents": "Current application and site/account details; site plans; charger specification sheet; paid-in-full installation and charger invoices; dated and signed W-9; pictures and serial numbers of each installed charger. Electrician/charger quotes are requested as soon as available but are explicitly not required for rebate processing.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "fleet"], "source_grade": "PRIMARY", "source_ids": ["ga-georgia-power-charger-plus-rebate", "ga-georgia-power-charger-plus-business-terms", "ga-georgia-power-make-ready", "ga-georgia-power-et-resources"], "source_url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/electric-vehicle-charger-rebate.html", "stacking_rules": "Business Charger Plus and Make Ready cannot be combined for the same project.", "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate on each new Level 2 or DC fast charger a Georgia Power business customer installs, paid by the charger's power rating.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Business EV Charger Plus Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7140"], "verified_date": "2026-10-13"}, {"administrator": "Georgia Power", "afdc_ids": [], "afdc_topics": [], "amount": "$5000 per Level 2 charger; up to $50,000 per project and $150,000 per year, and never more than 50% of the charger, installation and material cost. DC fast chargers are not eligible.", "amount_formula": "$5000 per Level 2 charger; up to $50,000 per project and $150,000 per year, and never more than 50% of the charger, installation and material cost. DC fast chargers are not eligible.", "application_route_notes": "Charger Plus application; use the multifamily terms and obtain approval before installation.", "application_route_type": "portal", "application_sequence": "Apply using the multifamily terms and obtain program approval before installation; coordinate service/permits and install qualifying Level 2 equipment; submit site plans and paid equipment/installation records within the stated rebate-submission period; meet the five-year operating/data obligations.", "application_url": "https://gpcevchargerplus.customerapplication.com/", "application_url_source_id": "ga-georgia-power-charger-plus-rebate", "body": "A flat rebate on each new Level 2 charger a multifamily property owner installs.", "bucket": "money", "candidate_states": ["GA"], "cap": "$5000 per Level 2 charger; up to $50,000 per project and $150,000 per year, and never more than 50% of the charger, installation and material cost. DC fast chargers are not eligible.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$5000 per Level 2 charger; up to $50,000 per project and $150,000 per year, and never more than 50% of the charger, installation and material cost. DC fast chargers are not eligible.", "deadline": "No end date published; available while funds last. Apply within the calendar year or within 6 months after installation.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A flat rebate on each new Level 2 charger a multifamily property owner installs.", "effective_status": "open", "eligibility": "Multifamily property owners with a Georgia Power commercial or industrial account, or a residential-rate account registered under a business entity name. Level 2 (208/240 V) only, no DC fast chargers; new, NRTL-certified, on a dedicated circuit, installed by a licensed electrician.", "equipment_conditions": "Multifamily property owners with a Georgia Power commercial or industrial account, or a residential-rate account registered under a business entity name. Level 2 (208/240 V) only, no DC fast chargers; new, NRTL-certified, on a dedicated circuit, installed by a licensed electrician.", "excluded_costs": "Mobile/portable connectors and used/refurbished/remanufactured equipment; this multifamily rebate’s charger-requirements section specifies Level 2 rather than treating DCFC as an eligible rebate category.", "funding_limit": null, "geography_verified": true, "id": "ga-georgia-power-charger-plus-multifamily", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Multifamily EV Charger Plus Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Current multifamily terms require application approval before installing newly purchased equipment; observe the separate calendar-year/six-month submission language and confirm project-specific timing.", "provider_id": "georgia-power", "provider_unit": "Georgia Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/electric-vehicle-charger-rebate.html"}], "required_documents": "Current multifamily application and eligible site/account details; site plans; paid-in-full installation and charger invoices; dated and signed W-9; pictures and serial numbers of each installed charger. Electrician/charger quotes are requested as soon as available but are explicitly not required for rebate processing.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["multifamily"], "source_grade": "PRIMARY", "source_ids": ["ga-georgia-power-charger-plus-rebate", "ga-georgia-power-charger-plus-multifamily-terms"], "source_url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/electric-vehicle-charger-rebate.html", "stacking_rules": "Separate multifamily terms control stacking; do not assume business Make Ready rules apply identically.", "state": "GA", "states": ["GA"], "status": "open", "summary": "A flat rebate on each new Level 2 charger a multifamily property owner installs.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Multifamily EV Charger Plus Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7140"], "verified_date": "2026-10-13"}, {"administrator": "Georgia Power", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $300K in funding per qualifying project, delivered as Georgia Power-built and -owned infrastructure up to, not including, the chargers.", "amount_formula": "Up to $300K in funding per qualifying project, delivered as Georgia Power-built and -owned infrastructure up to, not including, the chargers.", "application_route_notes": "Separate make-ready funding application; acceptance alone does not confirm available funding.", "application_route_type": "portal", "application_sequence": "Submit the separate make-ready application; receive eligibility acceptance and confirmation that funding is available; agree the Project Plan within its 30-day review period and execute required permissions. Georgia Power or its selected contractor installs the approved infrastructure; the participant supplies and operates its separate charging equipment.", "application_url": "https://gpc-etmakeready.customerapplication.com/", "application_url_source_id": "ga-georgia-power-make-ready", "body": "Georgia Power builds, owns and maintains the electrical infrastructure behind the meter up to the charger ports of a public-facing charging site; the customer buys and installs the chargers.", "bucket": "money", "candidate_states": ["GA"], "cap": "Up to $300K in funding per qualifying project, delivered as Georgia Power-built and -owned infrastructure up to, not including, the chargers.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Georgia Power-built and -owned make-ready infrastructure up to, but excluding, charging equipment", "deadline": "Scheduled to be available until December 31, 2028, or until funding runs out; funded first come, first served.", "deadline_date": "2028-12-31", "disposition": "retained-current", "disposition_reason": "Georgia Power builds, owns and maintains the electrical infrastructure behind the meter up to the charger ports of a public-facing charging site; the customer buys and installs the chargers.", "effective_status": "open", "eligibility": "Georgia Power business customers, including commercial and industrial customers, municipalities, universities, schools, hospitals and multifamily developments; not residential. Six or more charging ports, or at least one DC fast charger. Chargers must be public-facing: at multifamily, hospital and other business sites they must be publicly accessible, open to the general public at the same rate, and findable in a public charger locator such as PlugShare, so chargers reserved for guests or residents do not qualify. Cannot be combined with the Business EV Charger Plus Rebate.", "equipment_conditions": "Georgia Power business customers, including commercial and industrial customers, municipalities, universities, schools, hospitals and multifamily developments; not residential. Six or more charging ports, or at least one DC fast charger. Chargers must be public-facing: at multifamily, hospital and other business sites they must be publicly accessible, open to the general public at the same rate, and findable in a public charger locator such as PlugShare, so chargers reserved for guests or residents do not qualify. Cannot be combined with the Business EV Charger Plus Rebate.", "excluded_costs": "Charging equipment; residential sites; customer/guest/resident-only restricted chargers not publicly accessible at the same rate", "funding_limit": null, "geography_verified": true, "id": "ga-georgia-power-make-ready", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Make Ready Infrastructure Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Coordinate utility application/design/agreement before construction; Georgia Power builds and owns funded make-ready.", "provider_id": "georgia-power", "provider_unit": "Georgia Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/make-ready.html"}], "required_documents": "Program application, site-control and public-access/port plans, utility design and agreement; current administrator make-ready checklist controls engineering requirements", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["ga-georgia-power-make-ready", "ga-georgia-power-make-ready-terms", "ga-georgia-power-et-resources"], "source_url": "https://www.georgiapower.com/business/products-programs/business-solutions/electric-transportation-business-programs/make-ready.html", "stacking_rules": "Business Charger Plus and Make Ready cannot be combined for the same project.", "state": "GA", "states": ["GA"], "status": "open", "summary": "Georgia Power builds, owns and maintains the electrical infrastructure behind the meter up to the charger ports of a public-facing charging site; the customer buys and installs the chargers.", "superseded_by": null, "technologies": ["DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Make Ready Infrastructure Program", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7140"], "verified_date": "2026-10-13"}, {"administrator": "Georgia Power", "afdc_ids": [], "afdc_topics": [], "amount": "$150 per charger, up to two chargers per account (up to $300). Or a $150 instant rebate on a Level 2 charger bought on the Georgia Power Marketplace; a Marketplace charger cannot also get the mail-in rebate.", "amount_formula": "$150 per charger, up to two chargers per account (up to $300). Or a $150 instant rebate on a Level 2 charger bought on the Georgia Power Marketplace; a Marketplace charger cannot also get the mail-in rebate.", "application_route_notes": "Residential post-installation rebate route; no duplicate claim for an already instant-discounted marketplace charger.", "application_route_type": "portal", "application_sequence": "Purchase and install an eligible new mounted Level 2 charger by December 31, 2026 while funding is available; submit through the residential EV Rebate Portal within six months of installation with charger and installation invoices, or the required self-installation photograph and signed attestation. Do not claim a second rebate for an instant-discounted marketplace charger.", "application_url": "https://etrebate.customerapplication.com/", "application_url_source_id": "ga-georgia-power-residential-ev", "body": "A rebate for each new Level 2 charger installed at a single-family home or townhome, or an instant rebate when the charger is bought on the Georgia Power Marketplace.", "bucket": "money", "candidate_states": ["GA"], "cap": "$150 per charger, up to two chargers per account (up to $300). Or a $150 instant rebate on a Level 2 charger bought on the Georgia Power Marketplace; a Marketplace charger cannot also get the mail-in rebate.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$150 per charger, up to two chargers per account (up to $300). Or a $150 instant rebate on a Level 2 charger bought on the Georgia Power Marketplace; a Marketplace charger cannot also get the mail-in rebate.", "deadline": "The 2026 terms cover installations completed on or before December 31, 2026, while funds last; the rebate page says installations between Jan 1, 2026 and December 31, 2028. Submit within 6 months of installation.", "deadline_date": "2026-12-31", "disposition": "retained-current", "disposition_reason": "A rebate for each new Level 2 charger installed at a single-family home or townhome, or an instant rebate when the charger is bought on the Georgia Power Marketplace.", "effective_status": "open", "eligibility": "Georgia Power residential customers in a single-family home or townhome, on any rate; the owner, or with the owner's written permission. New wall- or pedestal-mounted Level 2 (208/240 V) charger on a dedicated circuit; mobile connectors do not qualify. Third-party vendors and EV charging businesses are not eligible.", "equipment_conditions": "Georgia Power residential customers in a single-family home or townhome, on any rate; the owner, or with the owner's written permission. New wall- or pedestal-mounted Level 2 (208/240 V) charger on a dedicated circuit; mobile connectors do not qualify. Third-party vendors and EV charging businesses are not eligible.", "excluded_costs": "Mobile/portable connectors; used, refurbished, rented, gifted or won equipment; purchases from other utility marketplaces; Georgia Power marketplace chargers already given the instant rebate; costs above actual documented purchase/installation expense.", "funding_limit": null, "geography_verified": true, "id": "ga-georgia-power-home-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Residential EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Residential request follows installation with the invoice or allowed self-installation evidence; apply within six months and the current-year installation limit. A marketplace instant rebate is a separate route.", "provider_id": "georgia-power", "provider_unit": "Georgia Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.georgiapower.com/residential/solutions/electric-vehicles/ev-rebates.html"}], "required_documents": "Online request; installation invoice naming installer, installation address and completion date; charger invoice showing seller, including a separately priced vehicle-bundled charger where relevant. Self-installation requires an installed-charger photo and signed/dated attestation; permits and express written owner permission apply.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ga-georgia-power-home-ev-rebates", "ga-georgia-power-home-charger-rebate-terms", "ga-georgia-power-residential-ev"], "source_url": "https://www.georgiapower.com/residential/solutions/electric-vehicles/ev-rebates.html", "stacking_rules": "Marketplace instant rebate cannot also receive the mail-in rebate for the same charger.", "state": "GA", "states": ["GA"], "status": "open", "summary": "A rebate for each new Level 2 charger installed at a single-family home or townhome, or an instant rebate when the charger is bought on the Georgia Power Marketplace.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Residential EV Charger Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7140"], "verified_date": "2026-10-13"}, {"administrator": "Florida Power & Light", "afdc_ids": [], "afdc_topics": [], "amount": "Public DC fast chargers: 50-149 kW up to $20,000 per port (site cap $120,000); 150-249 kW up to $30,000 per port (site cap $180,000); 250 kW or greater up to $50,000 per port (site cap $300,000). Level 2: up to $1,200 per port. The credit is the lesser of that maximum or the actual make-ready cost.", "amount_formula": "Public DC fast chargers: 50-149 kW up to $20,000 per port (site cap $120,000); 150-249 kW up to $30,000 per port (site cap $180,000); 250 kW or greater up to $50,000 per port (site cap $300,000). Level 2: up to $1,200 per port. The credit is the lesser of that maximum or the actual make-ready cost.", "application_route_notes": "Download the application, consult a qualified electrical contractor, and send the completed form and required documentation to EVMakeReady@fpl.com.", "application_route_type": "form", "application_sequence": "Download the Make-Ready Credit application, consult qualified electrical contractors and gather its required documentation; send the completed form and records to EVMakeReady@fpl.com. Confirm FPL approval and project-specific timing before committing costs; the reviewed landing page does not establish a universal post-installation reimbursement order.", "application_url": "https://www.fpl.com/content/dam/fplgp/us/en/energy-my-way/images/fpl-evolution/make-ready-credit-program-application-form.xlsx", "application_url_source_id": "fl-fpl-make-ready-credit", "body": "A per-port credit toward the utility-side electrical work (service lines, transformers, switchgear, conduit, trenching, pads) needed to power new EV chargers; the customer buys and installs the chargers.", "bucket": "money", "candidate_states": ["FL"], "cap": "Public DC fast chargers: 50-149 kW up to $20,000 per port (site cap $120,000); 150-249 kW up to $30,000 per port (site cap $180,000); 250 kW or greater up to $50,000 per port (site cap $300,000). Level 2: up to $1,200 per port. The credit is the lesser of that maximum or the actual make-ready cost.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved utility make-ready infrastructure", "deadline": "No end date published; first come, first served until the budget is used up.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A per-port credit toward the utility-side electrical work (service lines, transformers, switchgear, conduit, trenching, pads) needed to power new EV chargers; the customer buys and installs the chargers.", "effective_status": "open", "eligibility": "FPL customers installing public DC fast chargers (50 kW or greater), or Level 2 charging for public locations, workplaces, fleets or multifamily dwellings. Covers make-ready infrastructure only, not the chargers, customer-side equipment or maintenance. The infrastructure must be maintained through the performance period or the credit is repaid with interest and fees.", "equipment_conditions": "FPL customers installing public DC fast chargers (50 kW or greater), or Level 2 charging for public locations, workplaces, fleets or multifamily dwellings. Covers make-ready infrastructure only, not the chargers, customer-side equipment or maintenance. The infrastructure must be maintained through the performance period or the credit is repaid with interest and fees.", "excluded_costs": "Chargers, customer-side equipment and maintenance", "funding_limit": null, "geography_verified": true, "id": "fl-fpl-evolution-make-ready-credit", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": "Customer funds costs above the lesser of applicable cap or actual approved make-ready cost", "name": "FPL EVolution Make-Ready Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Administrator application/credit agreement and site-specific make-ready approval apply; confirm before construction.", "provider_id": "florida-power-light", "provider_unit": "Florida Power & Light", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.fpl.com/electric-vehicles/for-business/make-ready-credit-program.html"}], "required_documents": "Program application and qualified station/site, power/port and make-ready cost details; agreement/performance-period obligations apply", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "fleet", "multifamily"], "source_grade": "PRIMARY", "source_ids": ["fl-fpl-make-ready-credit", "fl-fpl-ev-faq"], "source_url": "https://www.fpl.com/electric-vehicles/for-business/make-ready-credit-program.html", "stacking_rules": "Maintain infrastructure for required performance period or repay credit with interest/fees; other incentive interaction not established", "state": "FL", "states": ["FL"], "status": "open", "summary": "A per-port credit toward the utility-side electrical work (service lines, transformers, switchgear, conduit, trenching, pads) needed to power new EV chargers; the customer buys and installs the chargers.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "FPL EVolution Make-Ready Credit", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["6452", "7801"], "verified_date": "2026-10-13"}, {"administrator": "Tampa Electric", "afdc_ids": [], "afdc_topics": [], "amount": "Tampa Electric paid up to $5,000 toward equipment and installation of each charge port, and expected to cover the full cost at sites serving income-qualified areas and at government sites; the host paid the rest.", "amount_formula": "Tampa Electric paid up to $5,000 toward equipment and installation of each charge port, and expected to cover the full cost at sites serving income-qualified areas and at government sites; the host paid the rest.", "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "A pilot in which Tampa Electric bought, installed, owned and maintained chargers at selected customer sites, paying part or all of the equipment and installation cost.", "bucket": "money", "candidate_states": ["FL"], "cap": "Tampa Electric paid up to $5,000 toward equipment and installation of each charge port, and expected to cover the full cost at sites serving income-qualified areas and at government sites; the host paid the rest.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Tampa Electric paid up to $5,000 toward equipment and installation of each charge port, and expected to cover the full cost at sites serving income-qualified areas and at government sites; the host paid the rest.", "deadline": "No application on Tampa Electric's current pages. The pilot was filed with the Florida PSC on September 25, 2020 for four years after full implementation; the application address in the FAQ now opens the general EV page, which sends businesses to the federal Alternative Fuels Data Center for incentives.", "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "A pilot in which Tampa Electric bought, installed, owned and maintained chargers at selected customer sites, paying part or all of the equipment and installation cost.", "effective_status": "closed", "eligibility": "Business customers selected through an application, scoring and site assessment, across five segments: workplace, public/retail, multi-unit dwellings, income-qualified and government.", "equipment_conditions": "Business customers selected through an application, scoring and site assessment, across five segments: workplace, public/retail, multi-unit dwellings, income-qualified and government.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "fl-tampa-electric-drive-smart", "kind": "free equipment", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Drive Smart EV charger pilot", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "tampa-electric", "provider_unit": "Tampa Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tampaelectric.com/49c567/siteassets/files/electricvehicles/drive-smart-faq.pdf"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["fl-tampa-electric-drive-smart-faq", "fl-tampa-electric-drive-smart-psc-petition-2020", "fl-tampa-electric-ev-short-url", "fl-tampa-electric-evs-for-business"], "source_url": "https://www.tampaelectric.com/49c567/siteassets/files/electricvehicles/drive-smart-faq.pdf", "stacking_rules": null, "state": "FL", "states": ["FL"], "status": "closed", "summary": "A pilot in which Tampa Electric bought, installed, owned and maintained chargers at selected customer sites, paying part or all of the equipment and installation cost.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Drive Smart EV charger pilot", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["18454"], "verified_date": "2026-10-13"}, {"administrator": "Santee Cooper", "afdc_ids": [], "afdc_topics": [], "amount": "EV charging: up to 50% of eligible cost, within $25,000 customer cap across categories", "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Santee Cooper's 2026 EVolve cycle is advertised as accepting rolling applications, but the official form states November 3 while its timeline and program page state November 30. Current funding balance and controlling deadline are unresolved.", "bucket": "money", "candidate_states": ["SC"], "cap": "$25,000/customer across all categories", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Hardware, installation, make-ready and upfront software licenses", "deadline": "Conflict: official form November 3, 2026; program page/timeline November 30, 2026. Confirm with administrator.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Santee Cooper's 2026 EVolve cycle is advertised as accepting rolling applications, but the official form states November 3 while its timeline and program page state November 30. Current funding balance and controlling deadline are unresolved.", "effective_status": "unverified", "eligibility": "Santee Cooper commercial customers on a GA, GB, GL or GT rate, including multifamily property and business owners. Covers charger hardware, installation, make-ready and upfront software costs; not leased equipment, Level 1 chargers, or costs incurred before the application is submitted. Projects are scored by a third-party grant manager and must be finished within 18 months of award.", "equipment_conditions": null, "excluded_costs": "Leased equipment; Level 1; costs before application; ongoing maintenance; unrelated improvements; construction bond, interest and warranty charges", "funding_limit": null, "geography_verified": false, "id": "sc-santee-cooper-evolve-commercial-grant", "kind": "grant", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EVolve Commercial Grant Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Apply before incurring eligible costs; competitive grant award required before reimbursement.", "provider_id": "santee-cooper", "provider_unit": "Santee Cooper", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.santeecooper.com/programs-incentives/empowerauto/commercial/"}], "required_documents": "Application checklist, bids/estimates, itemized project costs and financing, equipment and location details; final completion documentation for payment.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["sc-santee-cooper-empowerauto-commercial", "sc-santee-cooper-evolve-grant-application-2026"], "source_url": "https://www.santeecooper.com/programs-incentives/empowerauto/commercial/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "Santee Cooper's 2026 EVolve cycle is advertised as accepting rolling applications, but the official form states November 3 while its timeline and program page state November 30. Current funding balance and controlling deadline are unresolved.", "superseded_by": null, "technologies": [], "territory": null, "title": "EVolve Commercial Grant Program", "unknown_fields": ["controlling deadline", "funding balance"], "unresolved_conditions": ["Conflicting official deadline dates", "Current available balance not published"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["17543"], "verified_date": null}, {"administrator": "Santee Cooper", "afdc_ids": [], "afdc_topics": [], "amount": "$20 discount on eligible listed charger at marketplace checkout", "amount_formula": "$20.00 off each listed Level 2 charger at checkout (for example, $629.00 after the rebate on a charger listed at $649.00).", "application_route_notes": "Eligible account validation and rebate occur through the official marketplace purchase route, not a later installation-reimbursement claim.", "application_route_type": "purchase", "application_sequence": "Validate the qualifying Santee Cooper customer account through the official marketplace and purchase an eligible charger there; the marketplace applies the applicable instant rebate. Arrange compliant installation separately; the reviewed store does not describe a later installation-reimbursement claim.", "application_url": "https://santeecoopermarketplace.com/ev-chargers", "application_url_source_id": "sc-santee-cooper-marketplace-ev-chargers", "body": "An instant rebate at checkout on the Level 2 home chargers sold through the Santee Cooper Marketplace.", "bucket": "money", "candidate_states": ["SC"], "cap": "$20 eligible-product discount", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible listed charger purchase through the account-validated marketplace", "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "An instant rebate at checkout on the Level 2 home chargers sold through the Santee Cooper Marketplace.", "effective_status": "open", "eligibility": "Santee Cooper residential customers whose account validates at checkout; applies only to chargers bought on the Santee Cooper Marketplace.", "equipment_conditions": "Santee Cooper residential customers whose account validates at checkout; applies only to chargers bought on the Santee Cooper Marketplace.", "excluded_costs": "Purchases outside the eligible marketplace; installation is separate", "funding_limit": null, "geography_verified": true, "id": "sc-santee-cooper-marketplace-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Santee Cooper Marketplace instant rebate on EV chargers", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Validate electricity account before eligible marketplace checkout; discount is at purchase.", "provider_id": "santee-cooper", "provider_unit": "Santee Cooper", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://santeecoopermarketplace.com/ev-chargers"}], "required_documents": "Electricity account validation at eligible marketplace checkout", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-santee-cooper-marketplace-ev-chargers", "sc-santee-cooper-empowerhome-rebates"], "source_url": "https://santeecoopermarketplace.com/ev-chargers", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "open", "summary": "An instant rebate at checkout on the Level 2 home chargers sold through the Santee Cooper Marketplace.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Santee Cooper Marketplace instant rebate on EV chargers", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["17543"], "verified_date": "2026-10-13"}, {"administrator": "Mecklenburg Electric Cooperative (through its power supplier ODEC)", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Mecklenburg Electric's own service description covers parts of Virginia and northern North Carolina; its marketplace terms could not be retrieved. Neither North Carolina-wide eligibility nor a current equipment discount is confirmed.", "bucket": "money", "candidate_states": ["NC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Mecklenburg Electric's own service description covers parts of Virginia and northern North Carolina; its marketplace terms could not be retrieved. Neither North Carolina-wide eligibility nor a current equipment discount is confirmed.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-mecklenburg-electric-marketplace-charger-discount", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "MEC Marketplace instant discount on EV chargers", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "mecklenburg-electric-cooperative-through-its-power-supplier-odec", "provider_unit": "Mecklenburg Electric Cooperative (through its power supplier ODEC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://myco-opmarketplace.com/mec/ev-chargers"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["nc-mecklenburg-electric-marketplace-ev-chargers", "nc-mecklenburg-electric-marketplace-home", "nc-mecklenburg-electric-marketplace-terms", "nc-mecklenburg-electric-who-we-are"], "source_url": "https://myco-opmarketplace.com/mec/ev-chargers", "stacking_rules": null, "state": "", "states": ["NC", "VA"], "status": "unverified", "summary": "Mecklenburg Electric's own service description covers parts of Virginia and northern North Carolina; its marketplace terms could not be retrieved. Neither North Carolina-wide eligibility nor a current equipment discount is confirmed.", "superseded_by": null, "technologies": [], "territory": "Parts of nine Southside Virginia counties and five northern North Carolina counties; electricity account membership must be checked.", "title": "MEC Marketplace instant discount on EV chargers", "unknown_fields": ["current status", "current discount", "current eligible product", "marketplace terms"], "unresolved_conditions": ["Marketplace returned unusable or inaccessible text; current discount and eligibility not verified"], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": ["12260"], "verified_date": null}, {"administrator": "Haywood EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$100 per ChargePoint Level 2 home charger, paid as a bill credit.", "amount_formula": "$100 per ChargePoint Level 2 home charger, paid as a bill credit.", "application_route_notes": "The PDF contains the rebate application and the required data-sharing/load-management authorization.", "application_route_type": "form", "application_sequence": "Install the qualifying ChargePoint Level 2 charger at the Haywood-served home and connect it to Wi-Fi; complete the signed rebate application and attached data-sharing/load-management authorization; provide the itemized receipt, vehicle/VIN, contractor, permit and installation details to Haywood EMC for the bill credit.", "application_url": "https://www.haywoodemc.com/wp-content/uploads/ChargePoint-EV-Rebate-application-10.4_0.pdf", "application_url_source_id": "nc-haywood-emc-ev-rebate-application", "body": "A rebate, paid as a bill credit, for a ChargePoint Level 2 home charger installed on Haywood EMC service.", "bucket": "money", "candidate_states": ["NC"], "cap": "$100 per ChargePoint Level 2 home charger, paid as a bill credit.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Qualifying ChargePoint Level 2 residential charger installation incentive, paid as a $100 account credit; the reviewed form does not itemize a wider reimbursable cost schedule.", "deadline": "No end date published; the rebate may change or be cancelled without notice.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate, paid as a bill credit, for a ChargePoint Level 2 home charger installed on Haywood EMC service.", "effective_status": "open", "eligibility": "Haywood EMC residential members; a ChargePoint brand Level 2 home charger installed on or after August 1, 2022 where Haywood EMC supplies the power; the charger must stay connected to Wi-Fi and the member signs a data-release and load-management authorization; itemized receipt required.", "equipment_conditions": "Haywood EMC residential members; a ChargePoint brand Level 2 home charger installed on or after August 1, 2022 where Haywood EMC supplies the power; the charger must stay connected to Wi-Fi and the member signs a data-release and load-management authorization; itemized receipt required.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-haywood-emc-chargepoint-home-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Home EV Charger Rebate (ChargePoint Level 2)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Provide the installed Wi-Fi-connected ChargePoint charger details and signed load-management/data authorization; the form does not state a separate funds-reservation process.", "provider_id": "haywood-emc", "provider_unit": "Haywood EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.haywoodemc.com/energy-efficiency/electric-vehicles/ev-charger-rebate/"}], "required_documents": "Itemized charger receipt, rebate application, Wi-Fi connection and signed charging-data/load-management release", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["nc-haywood-emc-ev-charger-rebate", "nc-haywood-emc-ev-rebate-application", "nc-haywood-emc-electric-vehicles"], "source_url": "https://www.haywoodemc.com/energy-efficiency/electric-vehicles/ev-charger-rebate/", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "open", "summary": "A rebate, paid as a bill credit, for a ChargePoint Level 2 home charger installed on Haywood EMC service.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Qualifying electricity accounts and installations within the named cooperative's service territory only.", "title": "Home EV Charger Rebate (ChargePoint Level 2)", "unknown_fields": ["unpublished remaining funds", "terms not stated on application", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["8333"], "verified_date": "2026-10-13"}, {"administrator": "Jones-Onslow EMC", "afdc_ids": [], "afdc_topics": [], "amount": "$250; one per service address", "amount_formula": null, "application_route_notes": "The current program page supplies this EV Rebate Application link; full embedded form terms were not extractable.", "application_route_type": "form", "application_sequence": "Buy and install the qualifying new home Level 2 charger during the program year beginning January 1, 2026; submit the EV Rebate Application linked by JOEMC; its representative will contact the applicant about any additional information needed. The embedded form checklist was not readable, so additional document requirements remain unverified.", "application_url": "https://formstack.io/DCB57", "application_url_source_id": "nc-jones-onslow-emc-products-rebates", "body": "Jones-Onslow residential members may apply for one $250 rebate per service address for a new Level 2 home charger bought and installed in the program year beginning January 1, 2026.", "bucket": "money", "candidate_states": ["NC"], "cap": "$250 total per address", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Purchase and installation of one qualifying new home Level 2 charger under the current $250 offer; full embedded form cost/document conditions remain unreadable.", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Jones-Onslow residential members may apply for one $250 rebate per service address for a new Level 2 home charger bought and installed in the program year beginning January 1, 2026.", "effective_status": "open", "eligibility": "Residential member; new Level 2 home charger bought and installed during the program year beginning January 1, 2026.", "equipment_conditions": "New Level 2 home charger", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-jones-onslow-emc-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle (EV) Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "No pre-install approval stated on current program page; application form could not be extracted.", "provider_id": "jones-onslow-emc", "provider_unit": "Jones-Onslow EMC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://joemc.com/energywise/products-rebates/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["nc-jones-onslow-emc-products-rebates", "nc-jones-onslow-emc-ev-rebate-form"], "source_url": "https://joemc.com/energywise/products-rebates/", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "open", "summary": "Jones-Onslow residential members may apply for one $250 rebate per service address for a new Level 2 home charger bought and installed in the program year beginning January 1, 2026.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Jones-Onslow EMC service address", "title": "Electric Vehicle (EV) Charger Rebate", "unknown_fields": ["full application documentation", "unpublished funding balance", "program end date", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["9837"], "verified_date": "2026-10-13"}, {"administrator": "Brunswick Electric Membership Corporation (BEMC)", "afdc_ids": [], "afdc_topics": [], "amount": "$500 as a credit on the member's account; one EV rebate per residence.", "amount_formula": "$500 as a credit on the member's account; one EV rebate per residence.", "application_route_notes": "The current program page links this application; use the August 2026 terms for the supporting records and 180-day limit.", "application_route_type": "form", "application_sequence": "Install the qualifying Level 2 system and make-ready wiring with applicable permits/local inspection; submit the online application within 180 days of the paid invoice with property-ownership and BEV registration/reservation proof. BEMC confirms eligibility/installation before the account credit; maintain the stated 24-month electric-service and EV-ownership obligations.", "application_url": "https://smarthub.tfaforms.net/804", "application_url_source_id": "nc-bemc-application-link-review", "body": "A $500 bill credit toward the cost of wiring a home for a Level 2 EV charger, for residential members who own the home and an all-electric vehicle.", "bucket": "money", "candidate_states": ["NC"], "cap": "$500 as a credit on the member's account; one EV rebate per residence.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$500 as a credit on the member's account; one EV rebate per residence.", "deadline": "No end date published; BEMC may modify or cancel the program at any time.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $500 bill credit toward the cost of wiring a home for a Level 2 EV charger, for residential members who own the home and an all-electric vehicle.", "effective_status": "open", "eligibility": "Current BEMC residential members in good standing (Schedule R - Rate 1) who own the property; a Level 2 charger and its wiring installed in BEMC territory within the last 180 days, shown by a paid invoice from an electric contractor and a valid local inspection; an all-electric (not hybrid) EV registered at the address, or a dealer reservation. Members agree to keep electric service and the EV for 24 months, or repay $500 minus $20 per full month of participation.", "equipment_conditions": "Current BEMC residential members in good standing (Schedule R - Rate 1) who own the property; a Level 2 charger and its wiring installed in BEMC territory within the last 180 days, shown by a paid invoice from an electric contractor and a valid local inspection; an all-electric (not hybrid) EV registered at the address, or a dealer reservation. Members agree to keep electric service and the EV for 24 months, or repay $500 minus $20 per full month of participation.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-bemc-residential-ev-charger-make-ready-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Residential EV Charger Make Ready Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Complete the qualified work, permits and local inspection; apply within 180 days of the paid invoice. BEMC confirms installation/eligibility before the bill credit.", "provider_id": "brunswick-electric-membership-corporation-bemc", "provider_unit": "Brunswick Electric Membership Corporation (BEMC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.bemc.org/electricvehicles/"}], "required_documents": "Paid electrical contractor invoice, valid local inspection and all-electric vehicle address registration or dealer reservation; signed 24-month participation agreement", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["nc-bemc-electric-vehicles", "nc-bemc-ev-make-ready-terms-2026", "nc-bemc-ev-make-ready-faqs-2026", "nc-bemc-rebates", "nc-bemc-application-link-review"], "source_url": "https://www.bemc.org/electricvehicles/", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "open", "summary": "A $500 bill credit toward the cost of wiring a home for a Level 2 EV charger, for residential members who own the home and an all-electric vehicle.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Residential EV Charger Make Ready Rebate", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["24889"], "verified_date": "2026-10-13"}, {"administrator": "Four County Electric Membership Corporation", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $500", "amount_formula": null, "application_route_notes": "Submit the page form or request an appointment by the stated telephone/email; the specialist can help complete the form at the meeting.", "application_route_type": "contact-instructions", "application_sequence": "Use the official EV-rebate page form or contact Four County to arrange a specialist meeting about the vehicle and charging station; the specialist may help fill out the form. Submit the rebate application within one year of purchase. The readable page does not establish the full document checklist or approval-before-work requirement.", "application_url": "https://www.fourcty.org/ev-rebate/", "application_url_source_id": "nc-fourcty-ev-rebate", "body": "Four County currently advertises up to $500 for purchasing and installing an at-home EV charging station; submit the application within one year of purchase.", "bucket": "money", "candidate_states": ["NC"], "cap": "$500", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Purchase and installation of an at-home EV charging station under the up-to-$500 offer; the readable page does not specify an itemized cost formula.", "deadline": "Within one year of purchase; no general program end date stated.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Four County currently advertises up to $500 for purchasing and installing an at-home EV charging station; submit the application within one year of purchase.", "effective_status": "open", "eligibility": "Four County members purchasing and installing an at-home EV charging station; apply within one year of purchase.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "nc-four-county-emc-at-home-ev-charging-station-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "At-Home Electric Vehicle Charging Station Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "four-county-electric-membership-corporation", "provider_unit": "Four County Electric Membership Corporation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.fourcty.org/energy-efficiency/rebates/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["nc-fourcty-rebates", "nc-fourcty-ev-rebate", "nc-fourcty-ev-rebate-form"], "source_url": "https://www.fourcty.org/energy-efficiency/rebates/", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "open", "summary": "Four County currently advertises up to $500 for purchasing and installing an at-home EV charging station; submit the application within one year of purchase.", "superseded_by": null, "technologies": [], "territory": "Four County EMC electricity service territory", "title": "At-Home Electric Vehicle Charging Station Rebate", "unknown_fields": ["full current form conditions (form extraction empty)", "equipment requirements", "unpublished funding balance", "preapproval", "charger technology requirements not established from readable current source", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "preapproval: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "equipment_conditions: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["6640"], "verified_date": "2026-10-13"}, {"administrator": "Greenville Utilities Commission (GUC)", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $1,000 per single-port and $1,500 per dual-port Level 2 station, or the station's total cost if less; limit four station rebates per property. GUC awards at most $30,000 in rebates a year.", "amount_formula": "Up to $1,000 per single-port and $1,500 per dual-port Level 2 station, or the station's total cost if less; limit four station rebates per property. GUC awards at most $30,000 in rebates a year.", "application_route_notes": "Pre-application approval is required before installation; a separate final rebate application follows the approved, in-service installation.", "application_route_type": "form", "application_sequence": "Submit the pre-application, plans, equipment specifications and map and obtain GUC approval before installation; install and place the approved equipment in service within six months of approval. After GUC confirms it is in service, send the final rebate application with paid equipment/installation invoices, electrical permit and installation photo within six months of installation; maintain operation/data sharing for three years.", "application_url": "https://www.guc.com/sites/default/files/uploads/PEV%20Rebate%20files/ev_charging_station_rebate_pre-application.pdf", "application_url_source_id": "nc-guc-ev-rebate-pre-application", "body": "A rebate for businesses, multi-family properties, schools, non-profits and local governments that install Level 2 charging stations on their own property: up to $1,000 per single-port and $1,500 per dual-port station.", "bucket": "money", "candidate_states": ["NC"], "cap": "Up to $1,000 per single-port and $1,500 per dual-port Level 2 station, or the station's total cost if less; limit four station rebates per property. GUC awards at most $30,000 in rebates a year.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Up to $1,000 per single-port and $1,500 per dual-port Level 2 station, or the station's total cost if less; limit four station rebates per property. GUC awards at most $30,000 in rebates a year.", "deadline": "No end date published; rebates are first come, first served until the funds are exhausted, and GUC may end the program at any time.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate for businesses, multi-family properties, schools, non-profits and local governments that install Level 2 charging stations on their own property: up to $1,000 per single-port and $1,500 per dual-port station.", "effective_status": "open", "eligibility": "Current GUC electric customers that are businesses (commercial and industrial), educational institutions, multi-family dwellings, non-profit organizations or local governments; residential customers are not eligible. At least one Level 2 station on customer-owned property; GUC must approve a pre-application before installation starts, subject to available funds; installed by a licensed electrical contractor and in service within 6 months of approval; spaces well lit, ADA compliant and signed for plug-in vehicles; stations kept operating for at least three years, with charging data shared with GUC; rebate application within 6 months of installation.", "equipment_conditions": "Current GUC electric customers that are businesses (commercial and industrial), educational institutions, multi-family dwellings, non-profit organizations or local governments; residential customers are not eligible. At least one Level 2 station on customer-owned property; GUC must approve a pre-application before installation starts, subject to available funds; installed by a licensed electrical contractor and in service within 6 months of approval; spaces well lit, ADA compliant and signed for plug-in vehicles; stations kept operating for at least three years, with charging data shared with GUC; rebate application within 6 months of installation.", "excluded_costs": "Equipment or installation costs before July 1, 2018; ongoing electricity, maintenance, repairs and connectivity remain the customer’s responsibility.", "funding_limit": null, "geography_verified": true, "id": "nc-guc-ev-charging-station-rebate-business", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charging Station Pilot Rebate Program (businesses)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "GUC must approve the pre-application before installation starts; place station in service within six months of approval.", "provider_id": "greenville-utilities-commission-guc", "provider_unit": "Greenville Utilities Commission (GUC)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.guc.com/electric/charging-station-rebate-businesses"}], "required_documents": "Pre-application with project description, installation plans, manufacturer specifications and map. Final application requires four attachments: paid EVSE invoice/receipt, paid installation invoice/receipt, electrical permit and installation photograph.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["nc-guc-charging-station-rebate-businesses", "nc-guc-ev-rebate-program-details", "nc-guc-ev-charging-flyer", "nc-guc-ev-rebate-application", "nc-guc-ev-rebate-pre-application", "nc-guc-electric-charging-stations"], "source_url": "https://www.guc.com/electric/charging-station-rebate-businesses", "stacking_rules": null, "state": "NC", "states": ["NC"], "status": "open", "summary": "A rebate for businesses, multi-family properties, schools, non-profits and local governments that install Level 2 charging stations on their own property: up to $1,000 per single-port and $1,500 per dual-port station.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charging Station Pilot Rebate Program (businesses)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7639"], "verified_date": "2026-10-13"}, {"administrator": "Blue Ridge Electric Cooperative", "afdc_ids": [], "afdc_topics": [], "amount": "$50", "amount_formula": null, "application_route_notes": "Official current $50 EV Charger Rebate link; the embedded full checklist was not readable in the source capture.", "application_route_type": "form", "application_sequence": "Use Blue Ridge Electric Cooperative’s current $50 EV Charger Rebate form. Confirm the qualifying model, installation evidence and timing with the cooperative before relying on the rebate; the embedded form checklist was not readable and the expired $500 ChargePoint offer does not establish current requirements.", "application_url": "https://www.cognitoforms.com/BlueRidgeElectricCooperative/EVChargerRebate", "application_url_source_id": "sc-blue-ridge-ev-chargers", "body": "Blue Ridge's current EV page links an application for a $50 EV charger rebate. The old $500 ChargePoint Home Flex application required purchase by December 31, 2024 and is a separate ended record.", "bucket": "money", "candidate_states": ["SC"], "cap": "$50", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Blue Ridge's current EV page links an application for a $50 EV charger rebate. The old $500 ChargePoint Home Flex application required purchase by December 31, 2024 and is a separate ended record.", "effective_status": "open", "eligibility": "Blue Ridge Electric Cooperative members; current form details could not be extracted.", "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sc-blue-ridge-ec-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "blue-ridge-electric-cooperative", "provider_unit": "Blue Ridge Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://blueridge.coop/ev"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-blue-ridge-ev-chargers", "sc-blue-ridge-ev-charger-rebate-form"], "source_url": "https://blueridge.coop/ev", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "open", "summary": "Blue Ridge's current EV page links an application for a $50 EV charger rebate. The old $500 ChargePoint Home Flex application required purchase by December 31, 2024 and is a separate ended record.", "superseded_by": null, "technologies": [], "territory": "Blue Ridge Electric Cooperative service accounts in South Carolina; not the similarly named North Carolina provider", "title": "EV Charger Rebate", "unknown_fields": ["charger technology", "full application requirements", "preapproval", "funding", "deadline", "charger technology requirements not established from readable current source", "covered_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "preapproval: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "equipment_conditions: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["1890"], "verified_date": "2026-10-13"}, {"administrator": "Blue Ridge Electric Cooperative", "afdc_ids": [], "afdc_topics": [], "amount": "$500.00.", "amount_formula": "$500.00.", "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "A $500.00 rebate for residential members who bought a ChargePoint Home Flex Level 2 charger between January 1, 2021 and December 31, 2024; the co-op's EV page now offers a $50 rebate instead.", "bucket": "money", "candidate_states": ["SC"], "cap": "$500.00.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$500.00.", "deadline": "Purchases between January 1, 2021 and December 31, 2024.", "deadline_date": "2024-12-31", "disposition": "retained-historical", "disposition_reason": "A $500.00 rebate for residential members who bought a ChargePoint Home Flex Level 2 charger between January 1, 2021 and December 31, 2024; the co-op's EV page now offers a $50 rebate instead.", "effective_status": "ended", "eligibility": "Blue Ridge Electric Cooperative residential members who bought and installed a ChargePoint Home Flex Level 2 charger at their home in the purchase window, sent the paid invoice, and let ChargePoint share the charger's data with the co-op for one year; paid only after activation was verified.", "equipment_conditions": "Blue Ridge Electric Cooperative residential members who bought and installed a ChargePoint Home Flex Level 2 charger at their home in the purchase window, sent the paid invoice, and let ChargePoint share the charger's data with the co-op for one year; paid only after activation was verified.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sc-blue-ridge-ec-chargepoint-home-flex-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Residential EV Charger Rebate Program (ChargePoint Home Flex)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "blue-ridge-electric-cooperative", "provider_unit": "Blue Ridge Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://blueridge.coop/sites/default/files/documents/Energy%20Services/residential_ev_charger_rebate_application_01012024-form.pdf"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-blue-ridge-ev-rebate-application", "sc-blue-ridge-ev-chargers"], "source_url": "https://blueridge.coop/sites/default/files/documents/Energy%20Services/residential_ev_charger_rebate_application_01012024-form.pdf", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "ended", "summary": "A $500.00 rebate for residential members who bought a ChargePoint Home Flex Level 2 charger between January 1, 2021 and December 31, 2024; the co-op's EV page now offers a $50 rebate instead.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Residential EV Charger Rebate Program (ChargePoint Home Flex)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["1890"], "verified_date": "2026-10-13"}, {"administrator": "York Electric Cooperative", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $200.", "amount_formula": "Up to $200.", "application_route_notes": "Residential rebate/EV time-of-use route; the electrician installs the charger/submeter and YEC installs the time-of-day meter.", "application_route_type": "form", "application_sequence": "Review the EV time-of-use program and residential rebate application; have a qualified electrician install the qualifying Level 2 charger and separate submeter, and arrange YEC’s time-of-day meter. Submit the residential rebate/enrollment request and confirm the actual qualifying cost and document requirements with YEC.", "application_url": "https://www.yorkelectric.net/energy-savings/electric-vehicles/electric-vehicle-incentives/residential-rebate-application/", "application_url_source_id": "sc-york-ec-ev-tou-rate-program", "body": "A rebate of up to $200 for members with a qualifying EV charger at home who join York Electric's EV time-of-use rate; YEC installs the time-of-day meter.", "bucket": "money", "candidate_states": ["SC"], "cap": "Up to $200.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate of up to $200 for members with a qualifying EV charger at home who join York Electric's EV time-of-use rate; YEC installs the time-of-day meter.", "effective_status": "open", "eligibility": "Members with a qualifying EV charger installed at their home in YEC's service territory, on the EV Time of Use Rate Program. The charger and a separate submeter must be installed by a qualified electrician; YEC installs only the time-of-day meter.", "equipment_conditions": "The EV time-of-use instructions specify a qualifying Level 2 charger and separately installed submeter, installed by a qualified electrician under current electrical rules. YEC installs the time-of-day meter; its page also gives electrician-facing service specifications.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sc-york-ec-ev-tou-residential-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Residential Rebate (EV Time of Use Rate Program)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Arrange the EV time-of-use account/meter setup with YEC and use its residential rebate route; the reviewed pages do not establish a separate reservation requirement or universal submission deadline.", "provider_id": "york-electric-cooperative", "provider_unit": "York Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.yorkelectric.net/energy-savings/electric-vehicles/electric-vehicle-incentives/"}], "required_documents": "Residential rebate/EV time-of-use enrollment and qualifying charger/submeter installation information; the complete embedded application attachment checklist was not established.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-york-ec-ev-incentives", "sc-york-ec-ev-tou-rate-program", "sc-york-ec-ev-owner-registration"], "source_url": "https://www.yorkelectric.net/energy-savings/electric-vehicles/electric-vehicle-incentives/", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "open", "summary": "A rebate of up to $200 for members with a qualifying EV charger at home who join York Electric's EV time-of-use rate; YEC installs the time-of-day meter.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Qualifying electricity accounts and installations within the named cooperative's service territory only.", "title": "Residential Rebate (EV Time of Use Rate Program)", "unknown_fields": ["unpublished remaining funds", "terms not stated on application", "any additional administrator case-specific documents", "covered_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["21002"], "verified_date": "2026-10-13"}, {"administrator": "Laurens Electric Cooperative", "afdc_ids": [], "afdc_topics": [], "alternate_evidence_path": "data/verified/evidence/browser-legacy-alternates.txt", "amount": "$600 rebate, plus an annual $30.00 incentive for taking part in peak load management.", "amount_formula": null, "application_route_notes": "Arrange the cooperative-supplied Level 2 charger and peak-load management with Laurens; the reviewed public page does not publish the complete application checklist.", "application_route_type": "contact-instructions", "application_sequence": "Arrange purchase of the Level 2 station from Laurens Electric and agree to the cooperative’s peak-load management access. Confirm the application and installation steps with the cooperative before purchase; the readable current announcement does not publish a full reservation or reimbursement procedure.", "application_url": "https://laurenselectric.com/energy-programs/chooseev/", "application_url_source_id": "sc-laurens-browser-alternative", "body": "A $600 rebate for members who buy a Level 2 EV charging station from Laurens Electric and let the co-op adjust it at peak demand, plus a yearly participation incentive.", "bucket": "money", "candidate_states": ["SC"], "cap": "$600 rebate plus $30/year participation incentive", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Cooperative-supplied Level 2 charging station under the $600 rebate and peak-load management arrangement; the announcement does not separately promise installation-labor reimbursement.", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $600 rebate for members who buy a Level 2 EV charging station from Laurens Electric and let the co-op adjust it at peak demand, plus a yearly participation incentive.", "effective_status": "open", "eligibility": "Members who buy a Level 2 charging station from the co-op and agree to peak load management: the co-op may communicate with the charger to make small automatic adjustments at peak demand.", "equipment_conditions": "Level 2 station purchased from the cooperative with peak-load management/data access", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sc-laurens-ec-level-2-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charging Station and Rebate Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "laurens-electric-cooperative", "provider_unit": "Laurens Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://laurenselectric.com/energy-programs/chooseev/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-laurens-ec-chooseev", "sc-laurens-browser-alternative"], "source_url": "https://laurenselectric.com/energy-programs/chooseev/", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "open", "summary": "A $600 rebate for members who buy a Level 2 EV charging station from Laurens Electric and let the co-op adjust it at peak demand, plus a yearly participation incentive.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Laurens Electric Cooperative service account", "title": "Electric Vehicle Charging Station and Rebate Program", "unknown_fields": ["preapproval procedure", "full application checklist", "unpublished funding balance", "end date", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "preapproval: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms.", "required_documents: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["10768"], "verified_date": "2026-10-13"}, {"administrator": "Greer Commission of Public Works", "afdc_ids": [], "afdc_topics": [], "amount": "$250 credit; one per residential meter or account.", "amount_formula": "$250 credit; one per residential meter or account.", "application_route_notes": "Use the electric vehicle incentive form with registration, equipment photograph and permit.", "application_route_type": "form", "application_sequence": "Obtain the required wiring permit and install qualifying Level 2 equipment or a 240V receptacle/mobile-charger arrangement; complete the incentive form with EV registration, equipment photograph and permit copy. Allow Greer CPW to inspect and verify installation before the one-per-account credit.", "application_url": "https://form.jotform.com/250365252601145", "application_url_source_id": "sc-greer-cpw-ev-incentive-form", "body": "A $250 credit for Greer CPW residential customers who install a 240V Level 2 charger, or a 14-50 outlet used with a 240V mobile charger, at home.", "bucket": "money", "candidate_states": ["SC"], "cap": "$250 credit; one per residential meter or account.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$250 credit; one per residential meter or account.", "deadline": "No end date published; the set-aside funds are paid first come, first served, and GCPW may discontinue the incentive.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $250 credit for Greer CPW residential customers who install a 240V Level 2 charger, or a 14-50 outlet used with a 240V mobile charger, at home.", "effective_status": "open", "eligibility": "Residential customers who install 240V (Level 2 or equivalent) charging equipment, or a 14-50 receptacle with a 240V mobile charger; must show registration of an owned or leased EV with a battery of at least 40 kWh; wiring permitted by the City of Greer or the county; GCPW inspects the installation before paying; one credit per residential meter or account.", "equipment_conditions": "Residential customers who install 240V (Level 2 or equivalent) charging equipment, or a 14-50 receptacle with a 240V mobile charger; must show registration of an owned or leased EV with a battery of at least 40 kWh; wiring permitted by the City of Greer or the county; GCPW inspects the installation before paying; one credit per residential meter or account.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sc-greer-cpw-ev-charger-credit", "kind": "bill credit", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Electric Vehicle Charger Incentive", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Obtain the required wiring permit and complete installation; the incentive form permits CPW inspection before credit. No separate advance rebate reservation is stated.", "provider_id": "greer-commission-of-public-works", "provider_unit": "Greer Commission of Public Works", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.greercpw.com/customer-service/forms-ev-application/"}], "required_documents": "Signed incentive form with account/site/contact and circuit details; EV registration proving ownership/lease and at least 40 kWh battery capacity; charger/receptacle photo; copy or photo of the wiring permit. Allow installation/permit/equipment inspection before credit.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["sc-greer-cpw-ev-charger-incentive-application", "sc-greer-cpw-ev-incentive-form", "sc-greer-cpw-ev-rate-residential-incentives"], "source_url": "https://www.greercpw.com/customer-service/forms-ev-application/", "stacking_rules": null, "state": "SC", "states": ["SC"], "status": "open", "summary": "A $250 credit for Greer CPW residential customers who install a 240V Level 2 charger, or a 14-50 outlet used with a 240V mobile charger, at home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Electric Vehicle Charger Incentive", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["7654"], "verified_date": "2026-10-13"}, {"administrator": "Holston Electric Cooperative", "afdc_ids": [], "afdc_topics": [], "amount": "100% of the charger equipment cost, up to $500; installation is not covered. One rebate per charger, and at most $500 per dwelling.", "amount_formula": "100% of the charger equipment cost, up to $500; installation is not covered. One rebate per charger, and at most $500 per dwelling.", "application_route_notes": "Mail the completed form and supporting documentation to the rebate program address in the PDF.", "application_route_type": "form", "application_sequence": "Purchase and install the eligible new Level 2 charger; complete and mail the form with charger sales receipt, installed-charger photo and EV sales agreement/registration within 60 days after purchase and installation. Holston may require verification or further documentation before payment.", "application_url": "https://holstonelectric.com/sites/holstonelectric/files/EV_Rebate_Form_PDFfin.pdf", "application_url_source_id": "tn-holston-ev-rebate-form", "body": "A rebate on a new Level 2 home EV charger, paid as a credit on the member's Holston electric account.", "bucket": "money", "candidate_states": ["TN"], "cap": "100% of the charger equipment cost, up to $500; installation is not covered. One rebate per charger, and at most $500 per dwelling.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible new charger equipment purchase", "deadline": "No end date published; the rebate form is due within 60 days after the charger is installed. Holston reviews the program annually and says it may change or end without notice.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A rebate on a new Level 2 home EV charger, paid as a credit on the member's Holston electric account.", "effective_status": "open", "eligibility": "Existing Holston residential electric customers with a current account in good standing who buy and install a new Level 2 (240-volt) charger and own or lease a battery-electric or plug-in hybrid vehicle charged at home. Purchases made after October 1, 2020. Not for replacing an existing Level 2 charger, and not for chargers installed in newly constructed homes, condominiums, apartments or townhomes. The retail receipt, the vehicle's sales ticket or registration, and a photo of the installed charger are required.", "equipment_conditions": "Existing Holston residential electric customers with a current account in good standing who buy and install a new Level 2 (240-volt) charger and own or lease a battery-electric or plug-in hybrid vehicle charged at home. Purchases made after October 1, 2020. Not for replacing an existing Level 2 charger, and not for chargers installed in newly constructed homes, condominiums, apartments or townhomes. The retail receipt, the vehicle's sales ticket or registration, and a photo of the installed charger are required.", "excluded_costs": "Installation; replacement of existing Level 2; chargers in new homes/condominiums/apartments/townhomes", "funding_limit": null, "geography_verified": true, "id": "tn-holston-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Rebate (residential)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Form is due within 60 days after purchase and installation, with installed photo and vehicle/purchase evidence; Holston may require further verification before payment.", "provider_id": "holston-electric-cooperative", "provider_unit": "Holston Electric Cooperative", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://holstonelectric.com/electricvehicles"}], "required_documents": "Retail charger receipt, vehicle sales ticket/registration and installed-charger photo", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["tn-holston-electric-vehicles", "tn-holston-ev-rebate-form"], "source_url": "https://holstonelectric.com/electricvehicles", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "A rebate on a new Level 2 home EV charger, paid as a credit on the member's Holston electric account.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charger Rebate (residential)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["8764"], "verified_date": "2026-10-13"}, {"administrator": "Middle Tennessee Electric", "afdc_ids": [], "afdc_topics": [], "amount": "$50 bill credit on the member's next bill; the application lists $50 per charger.", "amount_formula": "$50 bill credit on the member's next bill; the application lists $50 per charger.", "application_route_notes": "EV Ready Member Program form with paid invoice and installation verification agreement.", "application_route_type": "form", "application_sequence": "Install the qualifying 240V service/plug or arrange review of a hardwired alternative; submit the Member Program form and paid invoice with installation within the preceding 12 months. Agree to primarily overnight charging when convenient and allow MTE to verify installation before retaining the account credit.", "application_url": "https://smarthub.tfaforms.net/272", "application_url_source_id": "tn-mte-ev-ready-member-form", "body": "A $50 credit on the electric bill for residential members who wire their home for Level 2 EV charging, with a 240-volt outlet or a direct-wired charger.", "bucket": "money", "candidate_states": ["TN"], "cap": "$50 bill credit on the member's next bill; the application lists $50 per charger.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "EV-ready electrical wiring/outlet, not a charger-hardware purchase rebate", "deadline": "Current FAQ: installation and receipt within past 12 months", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $50 credit on the electric bill for residential members who wire their home for Level 2 EV charging, with a 240-volt outlet or a direct-wired charger.", "effective_status": "open", "eligibility": "MTE home member installing 240V service for any-brand Level 2 or eligible EV outlet; current FAQ permits work/receipt in the past 12 months, and specifies/recommends a 50A outlet/service. Hardwired installation may receive additional review.", "equipment_conditions": "Residential FAQ specifies/recommends 50A 240V outlet; hardwired Level 2 eligible subject to extra review; licensed/code-compliant electrical work", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "tn-mte-ev-ready-residential", "kind": "bill credit", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Ready residential bill credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Member form uses a completed installation and paid invoice within the preceding 12 months; MTE may verify before the member retains the bill credit.", "provider_id": "middle-tennessee-electric", "provider_unit": "Middle Tennessee Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://mte.com/EVReady"}], "required_documents": "Online member application, account/site/contractor/vehicle details, paid installation receipt and overnight-scheduling/verification agreement", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["tn-mte-ev-ready", "tn-mte-current-faq", "tn-mte-ev-ready-member-form"], "source_url": "https://mte.com/EVReady", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "A $50 credit on the electric bill for residential members who wire their home for Level 2 EV charging, with a 240-volt outlet or a direct-wired charger.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Middle Tennessee Electric member electricity service address", "title": "EV Ready residential bill credit", "unknown_fields": ["unpublished remaining funds", "general program end date", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["12470"], "verified_date": "2026-10-13"}, {"administrator": "Middle Tennessee Electric", "afdc_ids": [], "afdc_topics": [], "amount": "$50 per new home.", "amount_formula": "$50 per new home.", "application_route_notes": "Separate Builder Program agreement; include the W-9 and site/lot details.", "application_route_type": "form", "application_sequence": "Use the separate Builder Program agreement with builder/tax/site/lot information and W-9; provide the promised new-home garage 240V, 40A service to NEMA 14-50R plugs and permit MTE verification. Confirm delivery/payment details with MTE; the member FAQ’s 50A recommendation is not the builder form’s 40A specification.", "application_url": "https://smarthub.tfaforms.net/315", "application_url_source_id": "tn-mte-ev-ready-builder-form", "body": "An incentive of $50 per new home for builders and home developers who wire the garage with a 240-volt, 40-amp circuit to a NEMA 14-50R outlet, ready for Level 2 charging.", "bucket": "money", "candidate_states": ["TN"], "cap": "$50 per new home.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "New-home EV-ready wiring/outlet, not charging hardware", "deadline": "Current builder application/site verification; no general end date stated", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "An incentive of $50 per new home for builders and home developers who wire the garage with a 240-volt, 40-amp circuit to a NEMA 14-50R outlet, ready for Level 2 charging.", "effective_status": "open", "eligibility": "Builders and home developers putting up new homes in Middle Tennessee Electric's territory; each home needs a 240-volt, 40-amp service to a NEMA 14-50R plug in the garage; the builder applies online, submits a W-9, and lets MTE inspect the installation.", "equipment_conditions": "New-home garage 240V, 40A service to a NEMA 14-50R plug under the actual Builder Program form; builder allows MTE installation verification. The residential FAQ’s 50A recommendation must not replace the builder form’s specification.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "tn-mte-ev-ready-builder", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Ready builder incentive (new homes)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Use the separate builder agreement for promised new-home garage installations and allow MTE verification; the form does not publish a universal approval/payment timetable.", "provider_id": "middle-tennessee-electric", "provider_unit": "Middle Tennessee Electric", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://mte.com/EVReady"}], "required_documents": "Builder agreement with business/contact/address, federal tax ID, subdivision/site/lot and planned completed-home details, plus W-9.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["tn-mte-ev-ready", "tn-mte-current-faq", "tn-mte-ev-ready-builder-form"], "source_url": "https://mte.com/EVReady", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "An incentive of $50 per new home for builders and home developers who wire the garage with a 240-volt, 40-amp circuit to a NEMA 14-50R outlet, ready for Level 2 charging.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Middle Tennessee Electric member electricity service address", "title": "EV Ready builder incentive (new homes)", "unknown_fields": ["unpublished remaining funds", "general program end date", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["12470"], "verified_date": "2026-10-13"}, {"administrator": "EPB (Chattanooga)", "afdc_ids": [], "afdc_topics": [], "amount": "A one-time $50 rebate, delivered as a credit on the energy bill within 60 days.", "amount_formula": "A one-time $50 rebate, delivered as a credit on the energy bill within 60 days.", "application_route_notes": "The live administrator form claims the one-time $50 installation rebate and requests the electrician receipt and installed-charger photo.", "application_route_type": "form", "application_sequence": "Complete the official installation-rebate form with the dated electrician receipt and installed-charger photo; EPB reviews the qualifying completed installation and the form states the $50 rebate is delivered as an energy-bill credit within 60 days. Additional terms beyond the extractable form remain unresolved.", "application_url": "https://epb.com/portal/residential-ev-rebate-form/", "application_url_source_id": "tn-epb-residential-ev-rebate-form", "body": "A one-time $50 rebate, paid as a credit on the energy bill, for installing a wired Level 2 charger at home.", "bucket": "money", "candidate_states": ["TN"], "cap": "A one-time $50 rebate, delivered as a credit on the energy bill within 60 days.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "A one-time $50 rebate, delivered as a credit on the energy bill within 60 days.", "deadline": "No end date published; claims are taken through EPB's online rebate form.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A one-time $50 rebate, paid as a credit on the energy bill, for installing a wired Level 2 charger at home.", "effective_status": "open", "eligibility": "EPB residential customers, homeowners or renters with the landlord's permission; a wired, stationary Level 2 (208V or 240V) charger installed after October 1, 2023; the claim needs the electrician's dated receipt and a photo of the installed charger, and is made by signing in to the EPB account.", "equipment_conditions": "EPB residential customers, homeowners or renters with the landlord's permission; a wired, stationary Level 2 (208V or 240V) charger installed after October 1, 2023; the claim needs the electrician's dated receipt and a photo of the installed charger, and is made by signing in to the EPB account.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "tn-epb-home-ev-charger-rebate", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charger Installation Rebate (home)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "The live form requests an electrician receipt and installed-charger photograph and states bill-credit payment within 60 days; advance reservation is not established in the extractable form.", "provider_id": "epb-chattanooga", "provider_unit": "EPB (Chattanooga)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://epb.com/energy/electric-vehicles/"}], "required_documents": "EPB account application, dated electrician receipt and installed stationary-charger photo; owner permission for renters", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["tn-epb-electric-vehicles", "tn-epb-residential-ev-rebate-form"], "source_url": "https://epb.com/energy/electric-vehicles/", "stacking_rules": null, "state": "TN", "states": ["TN"], "status": "open", "summary": "A one-time $50 rebate, paid as a credit on the energy bill, for installing a wired Level 2 charger at home.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charger Installation Rebate (home)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "any additional administrator case-specific documents", "excluded_costs: not established in the reviewed extractable current primary page/form; confirm the administrator’s full terms."], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3408"], "verified_date": "2026-10-13"}, {"administrator": "EPB (Chattanooga)", "afdc_ids": [], "afdc_topics": [], "amount": "$50 back for the charger.", "amount_formula": "$50 back for the charger.", "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "$50 back from EPB for a home builder who installs an EV charger in a new home, offered through EPB's Smart Build program for builders.", "bucket": "money", "candidate_states": ["TN"], "cap": "$50 back for the charger.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$50 back for the charger.", "deadline": "No end date published; the page offers only contact options for an EPB Energy Pro, with no application.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "$50 back from EPB for a home builder who installs an EV charger in a new home, offered through EPB's Smart Build program for builders.", "effective_status": "unverified", "eligibility": "Builders of new homes in EPB's service area, working through the EPB Smart Build program; the page names no other conditions.", "equipment_conditions": "Builders of new homes in EPB's service area, working through the EPB Smart Build program; the page names no other conditions.", "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "tn-epb-smart-build-ev-connectivity-incentive", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "Smart Build Electric Vehicle Connectivity Incentive (home builders)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "epb-chattanooga", "provider_unit": "EPB (Chattanooga)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://business.epb.com/energy/smart-build/ev-incentive/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "UNVERIFIED", "source_ids": ["tn-epb-smart-build-ev-incentive", "tn-epb-business-smart-build"], "source_url": "https://business.epb.com/energy/smart-build/ev-incentive/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "$50 back from EPB for a home builder who installs an EV charger in a new home, offered through EPB's Smart Build program for builders.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "Smart Build Electric Vehicle Connectivity Incentive (home builders)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established"], "unresolved_conditions": ["Primary status/terms not established; discovery status cannot establish availability."], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3408"], "verified_date": null}, {"administrator": "EPB (Chattanooga)", "afdc_ids": [], "afdc_topics": [], "amount": "$500 or $2,000 per port for Level 2 or DC fast charging ports available to the public; the live page does not say which ports earn which amount.", "amount_formula": "$500 or $2,000 per port for Level 2 or DC fast charging ports available to the public; the live page does not say which ports earn which amount.", "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "A per-port incentive for Level 2 or DC fast charging ports open to the public, listed as a step in EPB's commercial and multifamily construction guidelines; the program's own page now sits behind a login.", "bucket": "money", "candidate_states": ["TN"], "cap": "$500 or $2,000 per port for Level 2 or DC fast charging ports available to the public; the live page does not say which ports earn which amount.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "$500 or $2,000 per port for Level 2 or DC fast charging ports available to the public; the live page does not say which ports earn which amount.", "deadline": "No end date on the live guidelines pages; the program's own page requires a login, so its current terms and dates are not public.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A per-port incentive for Level 2 or DC fast charging ports open to the public, listed as a step in EPB's commercial and multifamily construction guidelines; the program's own page now sits behind a login.", "effective_status": "unverified", "eligibility": "EPB commercial and multi-dwelling (MDU) construction customers; the ports must be available to the public; once the chargers are installed, the builder gives EPB the information it requests. The full terms are on a page that requires a login.", "equipment_conditions": "EPB commercial and multi-dwelling (MDU) construction customers; the ports must be available to the public; once the chargers are installed, the builder gives EPB the information it requests. The full terms are on a page that requires a login.", "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "tn-epb-public-ev-charger-incentive", "kind": "rebate", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "EV Charging Port Incentive for public chargers (commercial and multifamily construction)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "epb-chattanooga", "provider_unit": "EPB (Chattanooga)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://business.epb.com/builders-and-developers/commercial-construction-guidelines/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["tn-epb-commercial-construction-guidelines", "tn-epb-mdu-development-guidelines", "tn-epb-ev-incentive-commercial"], "source_url": "https://business.epb.com/builders-and-developers/commercial-construction-guidelines/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "A per-port incentive for Level 2 or DC fast charging ports open to the public, listed as a step in EPB's commercial and multifamily construction guidelines; the program's own page now sits behind a login.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "EV Charging Port Incentive for public chargers (commercial and multifamily construction)", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established"], "unresolved_conditions": ["Primary status/terms not established; discovery status cannot establish availability.", "The primary page could not be read through the checked route; current terms and availability remain unverified."], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3408"], "verified_date": null}, {"administrator": "EPB (Chattanooga)", "afdc_ids": [], "afdc_topics": [], "amount": "An additional $500 of growth credit per branch circuit dedicated to electric vehicles, applied against the cost of EPB's construction.", "amount_formula": "An additional $500 of growth credit per branch circuit dedicated to electric vehicles, applied against the cost of EPB's construction.", "application_sequence": "Review the linked current application and terms; confirm eligibility and approval requirements before committing costs.", "application_url": null, "body": "An extra growth credit for each branch circuit dedicated to EV charging in new commercial or multifamily construction; the growth credit offsets the cost of EPB's construction to serve the building.", "bucket": "money", "candidate_states": ["TN"], "cap": "An additional $500 of growth credit per branch circuit dedicated to electric vehicles, applied against the cost of EPB's construction.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "An additional $500 of growth credit per branch circuit dedicated to electric vehicles, applied against the cost of EPB's construction.", "deadline": "No end date published.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "An extra growth credit for each branch circuit dedicated to EV charging in new commercial or multifamily construction; the growth credit offsets the cost of EPB's construction to serve the building.", "effective_status": "unverified", "eligibility": "New commercial construction and multi-dwelling (MDU) developments served by EPB; EV charging facilities must be installed, and the builder gives EPB the information it requests.", "equipment_conditions": "New commercial construction and multi-dwelling (MDU) developments served by EPB; EV charging facilities must be installed, and the builder gives EPB the information it requests.", "excluded_costs": null, "funding_limit": null, "geography_verified": false, "id": "tn-epb-new-construction-ev-growth-credit", "kind": "make-ready", "legacy_aliases": [], "level": "utility", "matching_requirement": null, "name": "New Construction EV Growth Credit", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Not explicitly established by the reviewed source; check the administrator before purchasing or starting work.", "provider_id": "epb-chattanooga", "provider_unit": "EPB (Chattanooga)", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://business.epb.com/builders-and-developers/commercial-construction-guidelines/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["tn-epb-commercial-construction-guidelines", "tn-epb-mdu-development-guidelines", "tn-epb-annual-report-2023-economic"], "source_url": "https://business.epb.com/builders-and-developers/commercial-construction-guidelines/", "stacking_rules": null, "state": "", "states": [], "status": "unverified", "summary": "An extra growth credit for each branch circuit dedicated to EV charging in new commercial or multifamily construction; the growth credit offsets the cost of EPB's construction to serve the building.", "superseded_by": null, "technologies": [], "territory": "Only eligible electricity accounts and installation sites in the administering provider's service territory; a state or ZIP match does not establish eligibility.", "title": "New Construction EV Growth Credit", "unknown_fields": ["unpublished funding balance", "full exclusions, matching/stacking and document checklist where not explicitly stated in the source", "full current application checklist not established"], "unresolved_conditions": ["Primary status/terms not established; discovery status cannot establish availability."], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": ["3408"], "verified_date": null}, {"administrator": "California Energy Commission / Center for Sustainable Energy", "afdc_ids": [], "afdc_topics": [], "amount": "150–274.99 kW: up to $55,000 per port; 275+ kW: up to $100,000 per port; no more than 100% of approved costs", "amount_formula": "Lesser of 100% of total approved costs and the applicable technology port cap", "application_route_notes": "Log in during the FCCP-2 application window with the ready-to-build documents.", "application_route_type": "portal", "application_sequence": "Confirm site eligibility; obtain design, permits and final utility service determination; submit a complete application; receive reservation; order equipment within 90 days; construct, inspect and energize; submit final documents within 450 days of reservation.", "application_url": "https://calevip.org/user/login", "application_url_source_id": "ca-fccp2-current", "body": "Window 2 accepts ready-to-build public fast-charger applications October 7, 2026–January 14, 2027. Hotels, charging hubs and business districts are excluded.", "bucket": "money", "candidate_states": ["CA"], "cap": "$55,000 or $100,000 per port; each recipient is limited to 35% of the Window 2 pool and 50 active CALeVIP 2.0/Communities in Charge projects combined", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved equipment, installation, planning and engineering subject to current implementation manual", "deadline": "January 14, 2027 at 5 p.m. Pacific", "deadline_date": "2027-01-14", "disposition": "retained-current", "disposition_reason": "Window 2 accepts ready-to-build public fast-charger applications October 7, 2026–January 14, 2027. Hotels, charging hubs and business districts are excluded.", "effective_status": "open", "eligibility": "Equipment owner/incentive recipient must be same entity as applicant; authorized California business/affiliate, nonprofit, government or eligible California Native American tribe representative; public sites; issued permit and final utility design or utility no-upgrade letter", "equipment_conditions": "At least 150 kW guaranteed output; at least 50% CCS; current CALeVIP approved hardware/network, AB 2061 reporting and CEC network data-sharing agreement required", "excluded_costs": "Ineligible site types: charging hubs, hotels, business districts; projects without issued permit and final utility design; ineligible costs under current manual", "funding_limit": "At least $28 million for Window 2 according to the October 7 CEC announcement; live unreserved balance not established", "geography_verified": true, "id": "ca-fccp2", "kind": "grant", "level": "state", "matching_requirement": null, "name": "Fast Charge California Project — Window 2", "next_review_date": "2026-11-12", "opens_date": "2026-10-07", "preapproval": "Submit during window and receive funds reservation before funded installation; ready-to-build permits/design required at application", "provider_id": "california-energy-commission-center-for-sustainable-energy", "provider_unit": "California Energy Commission / Center for Sustainable Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://calevip.org/fccp2"}], "required_documents": "Site verification/owner permission, issued permits, final utility design or no-upgrade letter, applicant/site/equipment/network details; equipment order proof within 90 days; construction tracker, inspection/energization and final payment documents", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["ca-fccp2-current", "ca-cec-oct7-launch", "ca-fccp2-terms"], "source_url": "https://calevip.org/fccp2", "stacking_rules": null, "state": "CA", "states": ["CA"], "status": "open", "summary": "Window 2 accepts ready-to-build public fast-charger applications October 7, 2026–January 14, 2027. Hotels, charging hubs and business districts are excluded.", "superseded_by": null, "technologies": ["DC fast"], "territory": "Only eligible installation sites within CA; program-specific location and applicant criteria still apply.", "title": "Fast Charge California Project — Window 2", "unknown_fields": ["current remaining funding", "all line-item cost exclusions beyond reviewed summary"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "NYSERDA", "afdc_ids": [12130], "afdc_topics": ["Electric Vehicle (EV) Charger Rebate"], "amount": "$3,000 per qualifying workplace, multifamily or hotel port; an additional $1,000 for eligible disadvantaged-community sites; $1,000 per individually assigned or fleet-only port", "amount_formula": null, "application_route_notes": "Choose the appropriate pre-installation or post-installation application route.", "application_route_type": "portal", "application_sequence": "Check the site and approved equipment/network; reserve before installation for 180 days or submit an eligible application within 90 days after installation; complete inspection and activation; submit final documents; maintain operation and data access for five years.", "application_url": "https://portal.nyserda.ny.gov/Core_Registration_Page?programName=Public_Electric_Vehicle_Supply_Equipment", "application_url_source_id": "ny-charge-ready-how-it-works", "body": "Rebate for eligible shared Level 2 workplace and multifamily sites. Single-family homes, small buildings and workplaces with fewer than 20 employees are excluded. Dedicated parking and fleet-only categories have a smaller rebate.", "bucket": "money", "candidate_states": ["NY"], "cap": "Qualifying port and site limits apply; no universal project savings estimate", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved charging equipment and installation; the rebate is calculated per qualifying port", "deadline": "PON 5367 listing gives December 31, 2026; funding is subject to availability", "deadline_date": "2026-12-31", "disposition": "retained-current", "disposition_reason": "Rebate for eligible shared Level 2 workplace and multifamily sites. Single-family homes, small buildings and workplaces with fewer than 20 employees are excluded. Dedicated parking and fleet-only categories have a smaller rebate.", "effective_status": "open", "eligibility": "New York site owners or authorized installers; workplaces with at least 20 employees; multifamily sites with at least 10 units in total and no building with fewer than five connected units, with more than 50% resident vehicle use. Hotels/motels use the multifamily category; only the site owner may apply as its equipment owner.", "equipment_conditions": "NYSERDA approved equipment and network; five years of operation/data access; required signage for workplace or tenant priority", "excluded_costs": "Single-family, duplex, triplex, fourplex, individual townhouse and mobile-home sites; workplaces with fewer than 20 employees; multifamily sites below the unit thresholds; equipment funded by DEC Municipal ZEV, NYPA Recharge NY, NEVI/CFI, other NYSERDA awards or 100% third-party equipment funding", "funding_limit": "Current program homepage reports $28 million after the February 2026 addition; the How It Works page still reports $12 million and was identified as stale.", "geography_verified": true, "id": "ny-charge-ready-2", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "Charge Ready NY2.0", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Preinstallation reservation is available after approval; an alternative application within 90 days after installation is allowed under the program conditions.", "provider_id": "nyserda", "provider_unit": "NYSERDA", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.nyserda.ny.gov/All-Programs/Charge-Ready-NY"}], "required_documents": "Pre-installation: online application, active permit or AHJ no-permit note, signed Site Host and Equipment Owner agreements, Installer Agreement if applicable, itemized quote with equipment, network fees and minimum three-year warranty, and aerial site map marking existing/proposed chargers. Final/post-installation: those agreements/map/permit; serial numbers, network IDs and GPS coordinates; installed-site, serial-number, 24-hour support-number and pricing photos; Installer Certification even for self-installation; proof of one year’s network service/payment and itemized paid equipment/installation records with rebate pass-through and utility funding disclosed; required Agriculture & Markets EVSE notification copy.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "fleet"], "source_grade": "PRIMARY", "source_ids": ["ny-official-agency-review", "ny-charge-ready-how-it-works", "ny-charge-ready-equipment", "ny-nyserda-funding"], "source_url": "https://www.nyserda.ny.gov/All-Programs/Charge-Ready-NY", "stacking_rules": "The listed charger grant-funded categories are excluded. Subtract this incentive before calculating the New York tax credit. Federal 30C is unavailable for property placed in service after June 30, 2026.", "state": "NY", "states": ["NY"], "status": "open", "summary": "Rebate for eligible shared Level 2 workplace and multifamily sites. Single-family homes, small buildings and workplaces with fewer than 20 employees are excluded. Dedicated parking and fleet-only categories have a smaller rebate.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible installation sites within NY; program-specific location and applicant criteria still apply.", "title": "Charge Ready NY2.0", "unknown_fields": ["live funding balance", "site/port limits in the full current manual"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "NYSERDA", "afdc_ids": [], "afdc_topics": [], "amount": "Up to 80% of eligible costs; generally $1m–$15m per award, up to $20,000 per new port or $5,000 per replacement port", "amount_formula": "Eligible-cost share and per-port cap within competitive award; specified prior CFI entities may qualify below the $1m minimum", "application_route_notes": "Official PON 6141 solicitation page with Apply Online and portal instructions; the Apply control requires the portal session.", "application_route_type": "portal", "application_sequence": "Public entity prepares portfolio/application; submit by revised deadline; competitive award/agreement; install and submit required documentation/data under agreement.", "application_url": "https://portal.nyserda.ny.gov/CORE_Solicitation_Detail_Page?SolicitationId=a0rcr00001AchJO", "application_url_source_id": "ny-publicsector-application-link-review", "body": "The revised PON 6141 extends submissions to October 27, 2026. Public entities apply for large portfolios of publicly accessible Level 2 sites; this is separate from Charge Ready NY 2.0.", "bucket": "money", "candidate_states": ["NY"], "cap": "$15m per award; $20,000 new/$5,000 replacement port caps", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible new/replacement hardware and installation, customer-side make-ready not otherwise funded, charging signage/site restoration, allowed preliminary planning and prepaid qualifying network costs", "deadline": "October 27, 2026 at 3 p.m. Eastern (extended in revised solicitation)", "deadline_date": "2026-10-27", "disposition": "retained-current", "disposition_reason": "Current solicitation portal lists October 27,2026 Round 1; general funding listing/launch usedOctober 20. A revision attachment must establish the controlling change before advertising a definitive deadline.", "effective_status": "open", "eligibility": "Public/government entity owns or oversees EVSE and submits application; public-private operation may qualify. Publicly owned or qualifying leased sites with sufficient lease term; light-duty publicly accessible sites required.", "equipment_conditions": "Level 2 approved RFQL5312 equipment/network; at least four 6.2 kW+ ports at off-street site or two at on-street site; accessibility and long-term operation/data requirements apply.", "excluded_costs": "Pre-agreement costs, real estate, unrelated buildings/amenities, electricity/demand, general maintenance, utility-side or already-funded make-ready, unrelated administration, performance bonds/contingencies, hardware maintenance/extended warranties", "funding_limit": "Up to $35m program pool; live balance not stated", "geography_verified": true, "id": "ny-publicsector-6141", "kind": "grant", "level": "state", "matching_requirement": "At least 20% eligible project cost from non-NYSERDA sources", "name": "Charge Ready NY — Large Public Sector Project (PON6141)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Execute NYSERDA agreement before incurring eligible costs", "provider_id": "nyserda", "provider_unit": "NYSERDA", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://portal.nyserda.ny.gov/CORE_Solicitation_Detail_Page?SolicitationId=a0rcr00001AchJO"}], "required_documents": "Public-entity submission with Proposal Narrative, Budget, Gantt chart, site/project-area and siting details, cost-share support and solicitation certifications", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["public"], "source_grade": "PRIMARY", "source_ids": ["ny-publicsector-portal", "ny-publicsector-revisions-pdf", "ny-publicsector-summary-pdf", "ny-publicsector-application-link-review"], "source_url": "https://portal.nyserda.ny.gov/CORE_Solicitation_Detail_Page?SolicitationId=a0rcr00001AchJO", "stacking_rules": "No other NYSERDA charger incentive, including Charge Ready NY 2.0, for the same installed stations; costs paid by another incentive cannot also receive funding", "state": "NY", "states": ["NY"], "status": "open", "summary": "The revised PON 6141 extends submissions to October 27, 2026. Public entities apply for large portfolios of publicly accessible Level 2 sites; this is separate from Charge Ready NY 2.0.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible installation sites within NY; program-specific location and applicant criteria still apply.", "title": "Charge Ready NY — Large Public Sector Project (PON6141)", "unknown_fields": ["live remaining funding", "individual award", "project-specific lease/contract acceptance"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Maryland Energy Administration", "afdc_ids": [11423], "afdc_topics": ["Electric Vehicle (EV) Charging Station Rebate Program"], "amount": "50% of eligible costs up to $700 for one charger", "amount_formula": "min(50% eligible documented costs, $700)", "application_route_notes": "Current FY27 page and FOA give the My MEA submission instructions after installation/payment; no guessed portal URL is substituted.", "application_route_type": "instructions", "application_sequence": "Install/pay in full; submit complete My MEA application within six months of final payment and before the earlier program/budget close; answer missing-information request within 14 calendar days.", "application_url": "https://energy.maryland.gov/transportation/Pages/incentives_evserebate.aspx", "application_url_source_id": "md-energy-evse-alternative", "body": "FY27 residential program explicitly open; Level 2only, 50%eligible costs up to $700. Commercial installations are excluded fromthisprogram.", "bucket": "money", "candidate_states": ["MD"], "cap": "One rebate per Maryland resident; no repeat rebate for the same charger or previously incentivized replacement location", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Site design, new Level 2 equipment, installation/labor, permits, site preparation, utility connections, signage and necessary operating equipment", "deadline": "May 31, 2027 at 3 p.m. Eastern, or earlier budget closure; also within six months of payment in full", "deadline_date": "2027-05-31", "disposition": "retained-current", "disposition_reason": "FY27 residential program explicitly open; Level 2only, 50%eligible costs up to $700. Commercial installations are excluded fromthisprogram.", "effective_status": "open", "eligibility": "Maryland residential individual who directly buys the equipment, including a qualifying single-family or multifamily household; valid individual tax ID, Maryland site and licensed electrical work where claimed.", "equipment_conditions": "Level 2 240 V, mounted or plug-in; Maryland-licensed electrical contractor when installation expense claimed; ENERGY STAR is encouraged, not mandatory.", "excluded_costs": "Electricity, ongoing maintenance, taxes, shipping and payment convenience fees; Level 1/DCFC; business/government/nonprofit applicants; used equipment except certified refurbished equipment; unlicensed self-installation", "funding_limit": "$1.5manticipated; Oct 5,2026snapshot 36.86%requested/27.61%reserved; not a real-timebalance", "geography_verified": true, "id": "md-fy27-residential-evse", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "FY27 Residential EVSE Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "No upfront reservation. Apply only after equipment is acquired, installed, operating and paid in full.", "provider_id": "maryland-energy-administration", "provider_unit": "Maryland Energy Administration", "published_date": "2026-07-08", "references": [{"description": "Primary administrator source", "url": "https://energy.maryland.gov/transportation/Pages/incentives_evserebate.aspx"}], "required_documents": "My MEA application/attestations, signed W-9, equipment and installation paid invoices/receipts, installed-equipment photos and model/serial details; Maryland electrical license for qualifying self-installation.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["md-energy-evse-alternative", "md-fy27-evse-foa"], "source_url": "https://energy.maryland.gov/transportation/Pages/incentives_evserebate.aspx", "stacking_rules": "No multiple rebate for the same charger; no replacement rebate at a location previously supported by this or another MEA energy program", "state": "MD", "states": ["MD"], "status": "open", "summary": "FY27 residential program explicitly open; Level 2only, 50%eligible costs up to $700. Commercial installations are excluded fromthisprogram.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible installation sites within MD; program-specific location and applicant criteria still apply.", "title": "FY27 Residential EVSE Rebate", "unknown_fields": ["live remaining funding", "individual tax treatment"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Delaware DNREC", "afdc_ids": [11639, 13352], "afdc_topics": ["Electric Vehicle (EV) Charger Rebates for Multi-Family Dwellings", "Public, Fleet, and Workplace Electric Vehicle (EV) Charger Rebates"], "amount": "Standard: 75% of equipment and installation costs. Multifamily future-proofing: 80%. Qualifying priority multifamily: 90% equipment, 85% installation and 90% future-proofing. Government/nonprofit: 90% equipment and 85% installation.", "amount_formula": null, "application_route_notes": "Complete supplier registration and use this preapproval form before purchase/installation.", "application_route_type": "form", "application_sequence": "Register as a state supplier; submit the preapproval application; receive the approval letter; complete within one year; submit paid project documents for reimbursement.", "application_url": "https://documents.dnrec.delaware.gov/energy/transportation-program/EV-Charging-Station-Rebate-Pre-Application.pdf", "application_url_source_id": "de-official-agency-review", "body": "Segment-specific Level 2 equipment and installation rebates require preapproval. Multifamily, public, fleet and workplace projects may qualify; single-family projects are excluded.", "bucket": "money", "candidate_states": ["DE"], "cap": "$5,000 for a single-port station or $10,000 for a dual-port station; multifamily site cap $75,000; other categories limited to ten ports or five dual-port stations per site", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved equipment/installation and qualifying multifamily future-proofing", "deadline": "First come until funds are reserved; complete within one year of approval", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Segment-specific Level 2 equipment and installation rebates require preapproval. Multifamily, public, fleet and workplace projects may qualify; single-family projects are excluded.", "effective_status": "open", "eligibility": "New Delaware Level 2 equipment purchased/installed after May 1, 2026; multifamily sites with at least four units; public commercial, fleet and workplace sites. Higher percentages require the applicable guideline criteria.", "equipment_conditions": "Qualifying Level 2 under the current segment guidelines; required permits and inspection", "excluded_costs": "Single-family residential projects and costs outside the approved segment guidelines", "funding_limit": "$2 million program budget; real-time balance unknown", "geography_verified": true, "id": "de-dnrec-level2", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "DNREC Level 2 Charging Equipment Rebates (May 2026 program)", "next_review_date": "2026-11-12", "opens_date": "2026-05-01", "preapproval": "Approval letter required before eligible purchase or installation", "provider_id": "delaware-dnrec", "provider_unit": "Delaware DNREC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://dnrec.delaware.gov/climate-coastal-energy/clean-transportation/ev-charging-equipment-rebates/"}], "required_documents": "Supplier registration, preapplication/quotes and approval letter; final paid invoices, photos, equipment details and segment checklist", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["multifamily", "public", "business", "fleet"], "source_grade": "PRIMARY", "source_ids": ["de-official-agency-review", "de-dnrec-multifamily-guidelines", "de-dnrec-business-guidelines"], "source_url": "https://dnrec.delaware.gov/climate-coastal-energy/clean-transportation/ev-charging-equipment-rebates/", "stacking_rules": null, "state": "DE", "states": ["DE"], "status": "open", "summary": "Segment-specific Level 2 equipment and installation rebates require preapproval. Multifamily, public, fleet and workplace projects may qualify; single-family projects are excluded.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible installation sites within DE; program-specific location and applicant criteria still apply.", "title": "DNREC Level 2 Charging Equipment Rebates (May 2026 program)", "unknown_fields": ["real-time funding balance", "full guideline line-item cost exclusions"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Oregon Department of Transportation", "afdc_ids": [13458], "afdc_topics": ["Electric Vehicle (EV) Charger Rebates"], "amount": "Lesser of $8,000 per Level 2 port or $80,000 per DC fast port and 80% of eligible costs; 95% applies only in the ten designated counties", "amount_formula": null, "application_route_notes": "Use Round 5, not the legacy Round 3/4 forms still linked on the page.", "application_route_type": "form", "application_sequence": "Check the funding category, address priority and approved equipment; reserve if desired; install and activate; submit reimbursement within 270 days for Level 2 or 365 days for DC/mixed projects after reservation.", "application_url": "https://www.cognitoforms.com/ODOT2/CommunityChargingRebatesRound5Application", "application_url_source_id": "or-official-agency-review", "body": "Round 5 accepts rolling applications from October 1, 2026; depleted categories use waitlists. Reservation is optional but encouraged, and costs before launch are ineligible.", "bucket": "money", "candidate_states": ["OR"], "cap": "$249,000 per site; technology port caps and county percentage ceilings apply", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved equipment, installation, operation and maintenance under the Round 5 guidelines", "deadline": "Rolling until category funds are reserved; late eligible applications may be waitlisted. Designated-county set-aside through January 31, 2027.", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Round 5 accepts rolling applications from October 1, 2026; depleted categories use waitlists. Reservation is optional but encouraged, and costs before launch are ineligible.", "effective_status": "open", "eligibility": "Eligible Oregon business, nonprofit, public entity, tribe, EV service provider or multifamily owner must own or have authority over the site. Public parking must provide 60 hours of access weekly; tenant/resident charging must be commonly accessible.", "equipment_conditions": "Current ODOT/EPRI vetted equipment list; Level 2 maximum rated power of at least 9.6 kW; updated network conditions and required access/signage", "excluded_costs": "Costs before October 1, 2026; leasing; real estate; general building/parking construction or maintenance; disposal; overhead; electricity; utility-owned off-site upgrades; private homes/vacation rentals; dedicated individual multifamily units", "funding_limit": "Approximately $5.5 million divided by charger/location category; the live category tracker controls", "geography_verified": true, "id": "or-ccr-round5", "kind": "rebate", "level": "state", "matching_requirement": "Generally at least 20% of eligible costs; 5% in the ten designated counties, subject to port/site caps", "name": "Community Charging Rebates — Round 5", "next_review_date": "2026-11-12", "opens_date": "2026-10-01", "preapproval": "Reservation is optional but strongly encouraged; funds are not guaranteed until reserved.", "provider_id": "oregon-department-of-transportation", "provider_unit": "Oregon Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.oregon.gov/odot/climate/Pages/communitychargingrebates.aspx"}], "required_documents": "Online preapplication, site verification, recipient acknowledgement and independent itemized quote. Final application requires invoices/credits, paid-cost breakdown, equipment/serial/activation details, and site/installer photos and documentation.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public"], "source_grade": "PRIMARY", "source_ids": ["or-official-agency-review", "or-round5-guidelines"], "source_url": "https://www.oregon.gov/odot/climate/Pages/communitychargingrebates.aspx", "stacking_rules": null, "state": "OR", "states": ["OR"], "status": "open", "summary": "Round 5 accepts rolling applications from October 1, 2026; depleted categories use waitlists. Reservation is optional but encouraged, and costs before launch are ineligible.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible installation sites within OR; program-specific location and applicant criteria still apply.", "title": "Community Charging Rebates — Round 5", "unknown_fields": ["real-time category funding balance"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Minnesota Department of Transportation", "afdc_ids": [], "afdc_topics": [], "amount": "Up to 80% of eligible costs; at least 20% applicant match", "amount_formula": "80% of eligible approved costs within the selected project agreement", "application_route_notes": "The current Round 3a RFP supplies the complete submission instructions and required attachment list.", "application_route_type": "instructions", "application_sequence": "Select mapped cluster/site; coordinate utility and prepare complete application; submit before deadline; conditional award/agreement and task approvals; construct/commission; quarterly cost/data submissions and five-year O&M.", "application_url": "https://edocs-public.dot.state.mn.us/edocs_public/DMResultSet/download?docId=39204293", "application_url_source_id": "mn-nevi-rfp-3a", "body": "Round 3a is open with 74 eligible clusters and $41.184 million allocated. Submit one site per application and no more than one application per cluster by November 2, 2026 at 4 p.m.", "bucket": "money", "candidate_states": ["MN"], "cap": "Per-project cost proposal/agreement and district allocation; no universal site cap inferred", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible preconstruction/design/environmental work after agreement, NEVI equipment/installation and qualifying utility work, allowed operations/maintenance/data/cybersecurity and administrative costs", "deadline": "November 2, 2026 at 4 p.m.; the source page does not explicitly specify the time zone", "deadline_date": "2026-11-02", "disposition": "retained-current", "disposition_reason": "Round 3a is open with 74 eligible clusters and $41.184 million allocated. Submit one site per application and no more than one application per cluster by November 2, 2026 at 4 p.m.", "effective_status": "open", "eligibility": "Tribal, business, nonprofit, government, utility or teaming applicant not suspended/debarred; one site/application and one application per eligible cluster; no state-owned right-of-way.", "equipment_conditions": "At least four simultaneous 150 kW NEVI ports, each meeting the current attachment; minimum four permanently attached CCS1 and four NACS connectors across site. Accessible parking, cybersecurity/data, Buy America/wage rules, 97% uptime and five-year O&M apply; connector count is not port count.", "excluded_costs": "Pre-agreement costs, unrelated buildings/parking, major off-site grid work, Level 2/non-NEVI-only equipment, utility-funded duplicate costs, research/lobbying/indirect costs; electricity reimbursed only under the RFP's above-average-cost rule", "funding_limit": "Round 3a federal funds $41,184,000 across up to 74 district projects", "geography_verified": true, "id": "mn-nevi-round3a", "kind": "grant", "level": "state", "matching_requirement": "At least 20%; alternative match percentages are not accepted", "name": "MnDOT NEVI — Round 3a", "next_review_date": "2026-11-12", "opens_date": "2026-08-26", "preapproval": "Fully executed agreement required before eligible expenses; MnDOT issues task Notices to Proceed; NEPA review precedes final design/construction.", "provider_id": "minnesota-department-of-transportation", "provider_unit": "Minnesota Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dot.state.mn.us/ev-infrastructure/nevi.html"}], "required_documents": "General technical and site proposal forms, cost proposal, site-owner letter, layout/environmental questionnaire, non-collusion/conflict certifications, UEI/SWIFT registration and applicable federal certifications/financial security; optional utility coordination form", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["mn-nevi-current", "mn-nevi-rfp-3a", "mn-nevi-technical-3a"], "source_url": "https://www.dot.state.mn.us/ev-infrastructure/nevi.html", "stacking_rules": null, "state": "MN", "states": ["MN"], "status": "open", "summary": "Round 3a is open with 74 eligible clusters and $41.184 million allocated. Submit one site per application and no more than one application per cluster by November 2, 2026 at 4 p.m.", "superseded_by": null, "technologies": ["DC fast"], "territory": "Only eligible installation sites within MN; program-specific location and applicant criteria still apply.", "title": "MnDOT NEVI — Round 3a", "unknown_fields": ["individual project award/cap", "live remaining allocation", "project-specific approval timeline"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Wyoming Department of Transportation", "afdc_ids": [], "afdc_topics": [], "amount": "80% of eligible project costs; 20% owner match", "amount_formula": null, "application_route_notes": "Public Purchase RFP 216241; the full bid documents, registration and deadline govern the proposal.", "application_route_type": "portal", "application_sequence": "Read RFP 216241; select an eligible cluster/site; document ownership, match and equipment; submit by the deadline; begin funded work only after award and required approvals.", "application_url": "https://www.publicpurchase.com/gems/bid/bidView?bidId=216241", "application_url_source_id": "wy-nevi-first-rfp", "body": "WYDOT’s first RFP is open until November 18, 2026 at 11 a.m. Sites must be within eligible clusters and three driving miles of corridor exits; installation in state right-of-way is excluded.", "bucket": "money", "candidate_states": ["WY"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved acquisition/installation, signage, operation/maintenance for up to five years, and data sharing under the RFP", "deadline": "November 18, 2026 at 11 a.m.; the announcement does not specify the time zone", "deadline_date": "2026-11-18", "disposition": "retained-current", "disposition_reason": "WYDOT’s first RFP is open until November 18, 2026 at 11 a.m. Sites must be within eligible clusters and three driving miles of corridor exits; installation in state right-of-way is excluded.", "effective_status": "open", "eligibility": "Private-industry station owners and other eligible RFP applicants; mapped clusters include urban/rural corridors and existing station upgrades.", "equipment_conditions": "At least four charging ports, including at least two DC fast ports in the administrator announcement; the full RFP requirements control.", "excluded_costs": "Stations in state right-of-way, sites outside the mapped clusters, and other RFP-ineligible costs", "funding_limit": "State NEVI formula allocation is about $26.8 million; the current RFP pool was not expressly established.", "geography_verified": true, "id": "wy-nevi-first", "kind": "grant", "level": "state", "matching_requirement": "20% owner/nonfederal match", "name": "Wyoming NEVI — First RFP", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Competitive RFP and award required", "provider_id": "wyoming-department-of-transportation", "provider_unit": "Wyoming Department of Transportation", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dot.state.wy.us/news/first-wyoming-nevi-rfp-now-live"}], "required_documents": "Complete Public Purchase RFP proposal and required location, technical, cost and match documentation; the exact RFP checklist controls.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "public"], "source_grade": "PRIMARY", "source_ids": ["wy-nevi-first-rfp", "wy-official-agency-review"], "source_url": "https://www.dot.state.wy.us/news/first-wyoming-nevi-rfp-now-live", "stacking_rules": null, "state": "WY", "states": ["WY"], "status": "open", "summary": "WYDOT’s first RFP is open until November 18, 2026 at 11 a.m. Sites must be within eligible clusters and three driving miles of corridor exits; installation in state right-of-way is excluded.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible installation sites within WY; program-specific location and applicant criteria still apply.", "title": "Wyoming NEVI — First RFP", "unknown_fields": ["individual award cap", "full RFP checklist", "explicit deadline time zone", "current RFP funding pool"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Rhode Island Office of Energy Resources", "afdc_ids": [], "afdc_topics": [], "amount": "Multifamily: 90%, up to $12,000 per station/$100,000 per site. Public commercial Level 2: 80%, up to $10,000 per station/$60,000 per site. Public DC: 80%, up to $50,000 per station/$100,000 per site. Municipal Level 2 site cap: $80,000. Environmental-justice locations have separate increases.", "amount_formula": null, "application_route_notes": "Reservation portal first; the separate payment portal follows approved installation and inspection.", "application_route_type": "portal", "application_sequence": "Use Portal 1 to reserve; receive OER approval/reservation ID; purchase and install within six months; request OER inspection; submit Portal 2 final documents for payment.", "application_url": "https://drive.ri.gov/chargeri/reserve-your-funds", "application_url_source_id": "ri-chargeri-application-link-review", "body": "ChargeRI accepts reservation applications for new shared/community charging. OER approval must come before purchase or installation; segment caps and a three-year network requirement apply.", "bucket": "money", "candidate_states": ["RI"], "cap": "Sector/station/site caps apply; environmental-justice locations increase the specified rate and caps by 5%. Mixed technologies are calculated separately.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Equipment, installation/site-preparation labor, make-ready work and three-year network plan", "deadline": "Rolling while category funding is available; start within three months of application and complete within six months of approval", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "ChargeRI accepts reservation applications for new shared/community charging. OER approval must come before purchase or installation; segment caps and a three-year network requirement apply.", "effective_status": "open", "eligibility": "Eligible Rhode Island multifamily sites with at least five units, public commercial sites, municipal/education sites, workplaces, registered 501(c)(3) organizations and authorized representatives. Distinct entity/site requirements and a maximum of three active reservations apply.", "equipment_conditions": "New ENERGY STAR Level 2/DC equipment; Level 1 excluded; three-year network/cloud service, at least one ADA space, signage/striping and required permits", "excluded_costs": "Prior purchases/installations, NEVI-funded sites, real estate, unrelated capital, electricity/demand charges, general operations/maintenance and network service beyond three years", "funding_limit": null, "geography_verified": true, "id": "ri-chargeri-2026", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "ChargeRI (September 2026 guidelines)", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "OER Approval Letter required before purchase or installation", "provider_id": "rhode-island-office-of-energy-resources", "provider_unit": "Rhode Island Office of Energy Resources", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://drive.ri.gov/chargeri"}], "required_documents": "Reservation proposal, equipment and authorization. Final records require ENERGY STAR proof, three-year network agreement, invoices/proof of payment, photos/permits and approved site inspection.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["multifamily", "public", "business", "fleet"], "source_grade": "PRIMARY", "source_ids": ["ri-official-agency-review", "ri-charge-guidelines-2026", "ri-chargeri-application-link-review"], "source_url": "https://drive.ri.gov/chargeri", "stacking_rules": null, "state": "RI", "states": ["RI"], "status": "open", "summary": "ChargeRI accepts reservation applications for new shared/community charging. OER approval must come before purchase or installation; segment caps and a three-year network requirement apply.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Only eligible installation sites within RI; program-specific location and applicant criteria still apply.", "title": "ChargeRI (September 2026 guidelines)", "unknown_fields": ["real-time category funding balance", "workplace sector cap in this summary"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Rhode Island Office of Energy Resources / Rhode Island Infrastructure Bank", "afdc_ids": [], "afdc_topics": [], "amount": "Without electrical upgrade: lesser of charger purchase cost or $800. With qualifying upgrade: lesser of 50% of installation cost or $1,000 standard; income-qualified applicants may receive 75%, capped at $1,500.", "amount_formula": null, "application_route_notes": "Post-installation PowerUpRI rebate application, distinct from ChargeRI reservation.", "application_route_type": "form", "application_sequence": "Purchase and install eligible equipment after August 1, 2024; pay and gather documentation; apply within 180 days and before funds are exhausted; maintain operation for three years.", "application_url": "https://drive.ri.gov/powerupri/apply", "application_url_source_id": "ri-powerup-application-link-review", "body": "Residential reimbursement requires completed work and an application within 180 days. Standard and income-qualified limits differ; landlords qualify only for the standard category.", "bucket": "money", "candidate_states": ["RI"], "cap": "One rebate per household for life, or one per property for landlords; the alternatives are not additive maximum payments", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible charger purchase without an upgrade, or qualified installation with an electrical upgrade", "deadline": "Within 180 days of the electrician’s receipt and before fund exhaustion or termination", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Residential reimbursement requires completed work and an application within 180 days. Standard and income-qualified limits differ; landlords qualify only for the standard category.", "effective_status": "open", "eligibility": "Rhode Island residents age 18 or older owning/leasing a Rhode Island-registered BEV or PHEV; qualifying residential dwelling with one to four family housing units or qualifying individual condominium/cooperative units. The guidance excludes properties containing more than four units as commercial scale. Renters need signed installation permission; landlords may receive only standard, not income-qualified, rebates. One rebate per household or landlord property for program lifetime.", "equipment_conditions": "New retail residential Level 2/240V charger installed by a certified licensed electrician, with three-year ownership/operation. The current guidance mentions ENERGY STAR or UL but elsewhere requires ENERGY STAR-certified equipment and proof; confirm any UL-only product with OER before purchase.", "excluded_costs": "Purchases/installations before August 1, 2024; used/private-seller chargers; business, nonprofit and government applicants; income-qualified awards to landlords; duplicate lifetime household/property claims. Properties containing more than four family housing units or condominium/cooperative units are treated as commercial scale and excluded by the guidance.", "funding_limit": null, "geography_verified": true, "id": "ri-powerup-2026", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "PowerUpRI Residential Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Apply after installation and payment; obtain signed tenant installation permission where applicable.", "provider_id": "rhode-island-office-of-energy-resources-rhode-island-infrastructure-bank", "provider_unit": "Rhode Island Office of Energy Resources / Rhode Island Infrastructure Bank", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://drive.ri.gov/powerupri"}], "required_documents": "Rebate application; RI driver’s license/state ID; applicable EV registration and tenant permission; installed-charger photo; dated purchase receipt and electrician receipt showing installation date/cost/address; equipment serial/make/model specification and ENERGY STAR proof; signed W-9; qualifying-income participation document or income self-attestation for the enhanced award.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ri-powerup-home", "ri-powerup-application-link-review", "ri-powerup-guidance-2026"], "source_url": "https://drive.ri.gov/powerupri", "stacking_rules": "The source page’s federal 30C-through-2033 statement is stale. That federal credit ended for property placed in service after June 30, 2026.", "state": "RI", "states": ["RI"], "status": "open", "summary": "Residential reimbursement requires completed work and an application within 180 days. Standard and income-qualified limits differ; landlords qualify only for the standard category.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Only eligible installation sites within RI; program-specific location and applicant criteria still apply.", "title": "PowerUpRI Residential Charger Rebate", "unknown_fields": ["real-time funding balance"], "unresolved_conditions": ["The January 2026 guidance and current page contain both ENERGY STAR-or-UL wording and an ENERGY STAR-only purchase/document requirement. A UL-only charger’s acceptance is not established; confirm it with OER before buying."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "TCEQ", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The administrator explicitly says the program is currently closed. Surviving source forms are historical reference.", "bucket": "money", "candidate_states": ["TX"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The administrator explicitly says the program is currently closed. Surviving source forms are historical reference.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "tx-affp", "kind": "", "level": "state", "matching_requirement": null, "name": "Alternative Fueling Facilities Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "tceq", "provider_unit": "TCEQ", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.tceq.texas.gov/airquality/terp/affp"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["tx-official-agency-review"], "source_url": "https://www.tceq.texas.gov/airquality/terp/affp", "stacking_rules": null, "state": "TX", "states": ["TX"], "status": "closed", "summary": "The administrator explicitly says the program is currently closed. Surviving source forms are historical reference.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within TX; program-specific location and applicant criteria still apply.", "title": "Alternative Fueling Facilities Program", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Virginia Department of Energy", "afdc_ids": [13404], "afdc_topics": ["Electric Vehicle (EV) Charger Deployment Grants"], "amount": "Historical Round 2 award up to $510,000", "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications ended June 30, 2026. The current Round 2 FAQ has no minimum cost share; its earlier 20% requirement is not carried forward.", "bucket": "money", "candidate_states": ["VA"], "cap": "$510,000 historical award limit", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "June 30, 2026 (closed)", "deadline_date": "2026-06-30", "disposition": "retained-historical", "disposition_reason": "Applications ended June 30, 2026. The current Round 2 FAQ has no minimum cost share; its earlier 20% requirement is not carried forward.", "effective_status": "closed", "eligibility": "Historical public-access project with documented ownership/control, grid and operational requirements", "equipment_conditions": "BABA and specified accessible charging equipment; approved grid/case/data requirements", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "va-evcap-round2", "kind": "", "level": "state", "matching_requirement": "Current Round 2 FAQ states no minimum cost share", "name": "Electric Vehicle Charging Assistance Program — Round 2", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Competitive award/agreement and program approvals required; this round is closed", "provider_id": "virginia-department-of-energy", "provider_unit": "Virginia Department of Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.energy.virginia.gov/renewable-energy/EVC.shtml"}], "required_documents": "Historical application/FAQ checklist, site-control/grid analysis, itemized costs and maintenance/operations plan; quarterly reporting", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["va-official-agency-review"], "source_url": "https://www.energy.virginia.gov/renewable-energy/EVC.shtml", "stacking_rules": null, "state": "VA", "states": ["VA"], "status": "closed", "summary": "Applications ended June 30, 2026. The current Round 2 FAQ has no minimum cost share; its earlier 20% requirement is not carried forward.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within VA; program-specific location and applicant criteria still apply.", "title": "Electric Vehicle Charging Assistance Program — Round 2", "unknown_fields": ["future round", "future terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Illinois EPA", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications are no longer accepted; all available funding has been requested.", "bucket": "money", "candidate_states": ["IL"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Applications are no longer accepted; all available funding has been requested.", "effective_status": "funding-exhausted", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "il-ceja-round3", "kind": "", "level": "state", "matching_requirement": null, "name": "CEJA EV Charging Infrastructure — Round 3", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "illinois-epa", "provider_unit": "Illinois EPA", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://epa.illinois.gov/topics/air-quality/driving-a-cleaner-illinois.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["il-official-agency-review"], "source_url": "https://epa.illinois.gov/topics/air-quality/driving-a-cleaner-illinois.html", "stacking_rules": null, "state": "IL", "states": ["IL"], "status": "funding-exhausted", "summary": "Applications are no longer accepted; all available funding has been requested.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within IL; program-specific location and applicant criteria still apply.", "title": "CEJA EV Charging Infrastructure — Round 3", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Michigan EGLE", "afdc_ids": [12495], "afdc_topics": ["Charge Up Michigan Placement Project"], "amount": "Historical formula: at least 33.3% eligible cost/direct utility match, up to $70,000", "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The administrator says the program is currently closed and is not accepting applications.", "bucket": "money", "candidate_states": ["MI"], "cap": "$70,000 historical cap", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": "Administrator currently closed", "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The administrator says the program is currently closed and is not accepting applications.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "mi-charge-up", "kind": "", "level": "state", "matching_requirement": null, "name": "Charge Up Michigan", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "michigan-egle", "provider_unit": "Michigan EGLE", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.michigan.gov/egle/about/organization/materials-management/energy/rfps-loans/charge-up-michigan-program"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["mi-official-agency-review"], "source_url": "https://www.michigan.gov/egle/about/organization/materials-management/energy/rfps-loans/charge-up-michigan-program", "stacking_rules": null, "state": "MI", "states": ["MI"], "status": "closed", "summary": "The administrator says the program is currently closed and is not accepting applications.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within MI; program-specific location and applicant criteria still apply.", "title": "Charge Up Michigan", "unknown_fields": ["future round and terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Missouri DNR", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The round is closed; nearly all of its $6 million was committed, and the administrator does not expect another application round.", "bucket": "money", "candidate_states": ["MO"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The round is closed; nearly all of its $6 million was committed, and the administrator does not expect another application round.", "effective_status": "funding-exhausted", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "mo-vw-charging", "kind": "", "level": "state", "matching_requirement": null, "name": "Volkswagen Trust EV Charging", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "missouri-dnr", "provider_unit": "Missouri DNR", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://dnr.mo.gov/air/what-were-doing/volkswagen-trust-funds/electric-vehicle-charging"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["mo-official-agency-review"], "source_url": "https://dnr.mo.gov/air/what-were-doing/volkswagen-trust-funds/electric-vehicle-charging", "stacking_rules": null, "state": "MO", "states": ["MO"], "status": "funding-exhausted", "summary": "The round is closed; nearly all of its $6 million was committed, and the administrator does not expect another application round.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within MO; program-specific location and applicant criteria still apply.", "title": "Volkswagen Trust EV Charging", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Oklahoma DEQ", "afdc_ids": [12140], "afdc_topics": ["Electric Vehicle (EV) Charger Grant Program"], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "DEQ lists ChargeOK among its completed past programs.", "bucket": "money", "candidate_states": ["OK"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "DEQ lists ChargeOK among its completed past programs.", "effective_status": "ended", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ok-chargeok", "kind": "", "level": "state", "matching_requirement": null, "name": "ChargeOK VW Electric Vehicle Grant", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "oklahoma-deq", "provider_unit": "Oklahoma DEQ", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://oklahoma.gov/deq/divisions/air-quality/air-grants-funding-programs.html"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["ok-official-agency-review"], "source_url": "https://oklahoma.gov/deq/divisions/air-quality/air-grants-funding-programs.html", "stacking_rules": null, "state": "OK", "states": ["OK"], "status": "ended", "summary": "DEQ lists ChargeOK among its completed past programs.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within OK; program-specific location and applicant criteria still apply.", "title": "ChargeOK VW Electric Vehicle Grant", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Arkansas Energy Office", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The detailed program page says all funding is expended and the balance is $0. That current status controls over the older overview’s open wording.", "bucket": "money", "candidate_states": ["AR"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The detailed program page says all funding is expended and the balance is $0. That current status controls over the older overview’s open wording.", "effective_status": "funding-exhausted", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ar-level2-vw", "kind": "", "level": "state", "matching_requirement": null, "name": "Volkswagen Level 2 EVSE Reimbursement", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "arkansas-energy-office", "provider_unit": "Arkansas Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://adeq.state.ar.us/energy/opportunities/evse/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["ar-level2-administrator"], "source_url": "https://adeq.state.ar.us/energy/opportunities/evse/", "stacking_rules": null, "state": "AR", "states": ["AR"], "status": "funding-exhausted", "summary": "The detailed program page says all funding is expended and the balance is $0. That current status controls over the older overview’s open wording.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within AR; program-specific location and applicant criteria still apply.", "title": "Volkswagen Level 2 EVSE Reimbursement", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Arkansas Energy Office", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications closed April 30, 2022; this is historical program context.", "bucket": "money", "candidate_states": ["AR"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Applications closed April 30, 2022; this is historical program context.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ar-dcfc-vw", "kind": "", "level": "state", "matching_requirement": null, "name": "DC Fast Charge Financial Assistance 2022", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "arkansas-energy-office", "provider_unit": "Arkansas Energy Office", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://adeq.state.ar.us/energy/opportunities/dcfc/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["ar-dcfc-administrator"], "source_url": "https://adeq.state.ar.us/energy/opportunities/dcfc/", "stacking_rules": null, "state": "AR", "states": ["AR"], "status": "closed", "summary": "Applications closed April 30, 2022; this is historical program context.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within AR; program-specific location and applicant criteria still apply.", "title": "DC Fast Charge Financial Assistance 2022", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "District DOEE", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications closed September 22, 2025; the historical round had a $609,500 pool.", "bucket": "money", "candidate_states": ["DC"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Applications closed September 22, 2025; the historical round had a $609,500 pool.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "dc-public-charging-fy25", "kind": "", "level": "state", "matching_requirement": null, "name": "Public EV Charging RFA FY25", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "district-doee", "provider_unit": "District DOEE", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://doee.dc.gov/release/request-applications-public-electric-vehicle-charging"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["dc-official-agency-review"], "source_url": "https://doee.dc.gov/release/request-applications-public-electric-vehicle-charging", "stacking_rules": null, "state": "DC", "states": ["DC"], "status": "closed", "summary": "Applications closed September 22, 2025; the historical round had a $609,500 pool.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within DC; program-specific location and applicant criteria still apply.", "title": "Public EV Charging RFA FY25", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "South Dakota DANR", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications closed February 16, 2024; reimbursements were due October 31, 2025.", "bucket": "money", "candidate_states": ["SD"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "Applications closed February 16, 2024; reimbursements were due October 31, 2025.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "sd-vw-round3", "kind": "", "level": "state", "matching_requirement": null, "name": "VW Electric Vehicle Charging Station — Round 3", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "south-dakota-danr", "provider_unit": "South Dakota DANR", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://danr.sd.gov/Environment/AirQuality/VolkswagenTrust/VWEVCS.aspx"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["sd-official-agency-review"], "source_url": "https://danr.sd.gov/Environment/AirQuality/VolkswagenTrust/VWEVCS.aspx", "stacking_rules": null, "state": "SD", "states": ["SD"], "status": "closed", "summary": "Applications closed February 16, 2024; reimbursements were due October 31, 2025.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within SD; program-specific location and applicant criteria still apply.", "title": "VW Electric Vehicle Charging Station — Round 3", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Washington Commerce", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The administrator says WAEVCP has no current open funding opportunities; Rounds 1 and 2 have been awarded.", "bucket": "money", "candidate_states": ["WA"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The administrator says WAEVCP has no current open funding opportunities; Rounds 1 and 2 have been awarded.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "wa-waevcp", "kind": "", "level": "state", "matching_requirement": null, "name": "Washington Electric Vehicle Charging Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "washington-commerce", "provider_unit": "Washington Commerce", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.commerce.wa.gov/clean-transportation/wa-ev-charging-program/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["wa-official-agency-review"], "source_url": "https://www.commerce.wa.gov/clean-transportation/wa-ev-charging-program/", "stacking_rules": null, "state": "WA", "states": ["WA"], "status": "closed", "summary": "The administrator says WAEVCP has no current open funding opportunities; Rounds 1 and 2 have been awarded.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within WA; program-specific location and applicant criteria still apply.", "title": "Washington Electric Vehicle Charging Program", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Wisconsin DOT", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The July 24, 2026 proposal deadline passed; awards are now announced.", "bucket": "money", "candidate_states": ["WI"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The July 24, 2026 proposal deadline passed; awards are now announced.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "wi-wevi-connecting", "kind": "", "level": "state", "matching_requirement": null, "name": "WEVI Connecting Corridors 2026", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "wisconsin-dot", "provider_unit": "Wisconsin DOT", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://wisconsindot.gov/Pages/projects/multimodal/electrification.aspx"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["wi-official-agency-review", "wi-wevi-may2026"], "source_url": "https://wisconsindot.gov/Pages/projects/multimodal/electrification.aspx", "stacking_rules": null, "state": "WI", "states": ["WI"], "status": "closed", "summary": "The July 24, 2026 proposal deadline passed; awards are now announced.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within WI; program-specific location and applicant criteria still apply.", "title": "WEVI Connecting Corridors 2026", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Utah DAQ", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "DAQ says application and reimbursement forms are to be announced. This review did not establish a currently open application period.", "bucket": "money", "candidate_states": ["UT"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "DAQ says application and reimbursement forms are to be announced. This review did not establish a currently open application period.", "effective_status": "unverified", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ut-daq-standalone", "kind": "", "level": "state", "matching_requirement": null, "name": "DAQ Electric Vehicle Charger Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "utah-daq", "provider_unit": "Utah DAQ", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://deq.utah.gov/daq/electric-vehicle-charger"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "UNVERIFIED", "source_ids": ["ut-official-agency-review"], "source_url": "https://deq.utah.gov/daq/electric-vehicle-charger", "stacking_rules": null, "state": "UT", "states": ["UT"], "status": "unverified", "summary": "DAQ says application and reimbursement forms are to be announced. This review did not establish a currently open application period.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within UT; program-specific location and applicant criteria still apply.", "title": "DAQ Electric Vehicle Charger Program", "unknown_fields": ["current application acceptance", "future window and full terms"], "unresolved_conditions": ["Application and reimbursement forms are to be announced; current acceptance and complete future terms remain unverified."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}, {"administrator": "State of Vermont / Green Mountain Power", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The August 1, 2026 application date passed; public-attraction funding is fully subscribed.", "bucket": "money", "candidate_states": ["VT"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-historical", "disposition_reason": "The August 1, 2026 application date passed; public-attraction funding is fully subscribed.", "effective_status": "closed", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "vt-chargevermont", "kind": "", "level": "state", "matching_requirement": null, "name": "Charge Vermont", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "state-of-vermont-green-mountain-power", "provider_unit": "State of Vermont / Green Mountain Power", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.chargevermont.com/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["vt-chargevermont-administrator", "vt-chargevermont-news", "vt-official-agency-review"], "source_url": "https://www.chargevermont.com/", "stacking_rules": null, "state": "VT", "states": ["VT"], "status": "closed", "summary": "The August 1, 2026 application date passed; public-attraction funding is fully subscribed.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within VT; program-specific location and applicant criteria still apply.", "title": "Charge Vermont", "unknown_fields": ["future application period and terms", "future window/full terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Hawaii Energy / Hawaii PUC", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "Applications are accepted while additional state funding is pending. Payment occurs only after funding is received; an application does not guarantee a reservation.", "bucket": "money", "candidate_states": ["HI"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Applications are accepted while additional state funding is pending. Payment occurs only after funding is received; an application does not guarantee a reservation.", "effective_status": "waitlist", "eligibility": null, "equipment_conditions": null, "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "hi-energy-evcs", "kind": "", "level": "state", "matching_requirement": null, "name": "Hawaii Energy EV Charging Station Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": null, "provider_id": "hawaii-energy-hawaii-puc", "provider_unit": "Hawaii Energy / Hawaii PUC", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://hawaiienergy.com/for-business/rebates-incentives/electric-vehicle-charging-stations/"}], "required_documents": null, "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": [], "source_grade": "PRIMARY", "source_ids": ["hi-hawaii-energy-commercial", "hi-official-agency-review"], "source_url": "https://hawaiienergy.com/for-business/rebates-incentives/electric-vehicle-charging-stations/", "stacking_rules": null, "state": "HI", "states": ["HI"], "status": "waitlist", "summary": "Applications are accepted while additional state funding is pending. Payment occurs only after funding is received; an application does not guarantee a reservation.", "superseded_by": null, "technologies": [], "territory": "Only eligible installation sites within HI; program-specific location and applicant criteria still apply.", "title": "Hawaii Energy EV Charging Station Rebate", "unknown_fields": ["current funding release and balance", "future payment timing"], "unresolved_conditions": ["Additional state funding is pending; neither payment timing nor a funded reservation is guaranteed."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Efficiency Maine", "afdc_ids": [], "afdc_topics": [], "amount": "$200 purchase discount plus $200 setup bonus", "amount_formula": "$200 single-use store code; $200 after qualifying activation", "application_route_notes": "Request the single-use discount code first, then buy from the linked Emporia Off-Peak Charger Store.", "application_route_type": "form", "application_sequence": "Request code; buy approved charger; install in Maine; connect internet/app within six months; administrator pays setup bonus after activation confirmation.", "application_url": "https://cr102.my.salesforce-sites.com/efficiencyMaineIR/?id=a1GPi000002C3Af", "application_url_source_id": "me-offpeak-application-link-review", "body": "A $200 approved-charger discount plus a $200 internet/app activation bonus; installation labor is separate and the default off-peak schedule is required.", "bucket": "money", "candidate_states": ["ME"], "cap": "Two discounts per Maine residential/business address", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Approved charger purchase and completed activation", "deadline": "Activate within six months of purchase; no general end date stated", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "A $200 approved-charger discount plus a $200 internet/app activation bonus; installation labor is separate and the default off-peak schedule is required.", "effective_status": "open", "eligibility": "Approved Emporia off-peak charger shipped to and installed in Maine; residential/business address limit applies.", "equipment_conditions": "Approved off-peak charger, installed in Maine and connected to internet with Emporia app activation within six months. The default weekday charging pause is 5 to 9 p.m.; day-specific overrides are allowed, permanently removing the default schedule is not.", "excluded_costs": "Installation labor is not covered by this equipment discount", "funding_limit": null, "geography_verified": true, "id": "me-offpeak-charger", "kind": "equipment-discount", "level": "state", "matching_requirement": null, "name": "Off-Peak Charger Incentives", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Request code before buying through the administrator's approved store; activate within six months for the second payment.", "provider_id": "efficiency-maine", "provider_unit": "Efficiency Maine", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.efficiencymaine.com/off-peak-charger-incentives/"}], "required_documents": "Discount-code request and qualifying store purchase; Emporia activation confirmation for setup payment", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home", "business"], "source_grade": "PRIMARY", "source_ids": ["me-offpeak-current", "me-offpeak-application-link-review"], "source_url": "https://www.efficiencymaine.com/off-peak-charger-incentives/", "stacking_rules": null, "state": "ME", "states": ["ME"], "status": "open", "summary": "A $200 approved-charger discount plus a $200 internet/app activation bonus; installation labor is separate and the default off-peak schedule is required.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Maine installation and shipping address", "title": "Off-Peak Charger Incentives", "unknown_fields": ["current remaining funding", "general program end date", "any unpublished stacking terms"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Maryland Energy Administration", "afdc_ids": [], "afdc_topics": [], "amount": "Per-port formula: owner-operated MFH/curbside $8,500–$125,000; third-party MFH/curbside $6,000–$100,000. Parking-hub/workplace/fleet owner-operated $7,000–$100,000; third-party $5,500–$85,000, depending on 6–17, 18–49, 50–149 or 150+ kW bands.", "amount_formula": "Eligible reimbursable cost limited by the FOA Table 1 power/ownership port formula and Table 2 applicant cap", "application_route_notes": "Current community-program page and October 9 FOA give My MEA submission/workbook instructions; this is a competitive grant.", "application_route_type": "instructions", "application_sequence": "Confirm applicant/site; submit complete application/workbook by deadline; competitive selection and grant agreement; complete/report within approximately 24 months; request reimbursement with eligible-cost evidence and required ongoing performance reports.", "application_url": "https://energy.maryland.gov/Pages/CommunityEVSE.aspx", "application_url_source_id": "md-community-current-real", "body": "Competitive community Level 2/DCFC funding, due December 9, 2026; the revised October 9 FOA has power/ownership port formulas and applicant caps. Costs before the grant's effective date are generally ineligible.", "bucket": "money", "candidate_states": ["MD"], "cap": "$900,000 per business/nonprofit/eligible higher-education applicant across sites; $1.5m per municipal/county/tribal-government or local-education applicant", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Engineering/design/permits, utility/electrical upgrades, site preparation, new chargers/connectors/pedestals, warranty/network costs, ADA work, EV signage and necessary lighting", "deadline": "December 9, 2026 at 3 p.m. Eastern", "deadline_date": "2026-12-09", "disposition": "retained-current", "disposition_reason": "Competitive community Level 2/DCFC funding, due December 9, 2026; the revised October 9 FOA has power/ownership port formulas and applicant caps. Costs before the grant's effective date are generally ineligible.", "effective_status": "open", "eligibility": "Eligible Maryland businesses/nonprofits/local governments/education institutions; MFH at least five units. Third-party applicant and site host must both be eligible. Regulated utilities, state/federal/foreign agencies, specified public senior universities and individual homeowners are excluded.", "equipment_conditions": "At least four ports for MFH, two for other site types; new outdoor NEMA 3R hardware, minimum five-year warranty; OCPP 1.6+ if networked, multi-language interface, permitted connectors, accessibility/signage and 97% uptime reporting for five years.", "excluded_costs": "Level 1/individual residential; previously funded AOI1 design, CCTV/lightning protection/spares/high-end communications, travel/food/marketing, removal of old chargers, vehicles, site acquisition and leases; pre-effective-date expenses unless MEA approves otherwise in writing", "funding_limit": "Anticipated up to $16.5m; final awards may differ", "geography_verified": true, "id": "md-fy27-community-evse", "kind": "grant", "level": "state", "matching_requirement": "Formula covers eligible documented costs within caps; applicant funds uncovered costs. No universal percentage is substituted for the FOA formula.", "name": "FY27 Community EVSE Grant Program", "next_review_date": "2026-11-12", "opens_date": "2026-09-09", "preapproval": "Executed grant agreement before reimbursement; no prior expenses unless MEA agrees in writing. Award is competitive, not a purchase entitlement.", "provider_id": "maryland-energy-administration", "provider_unit": "Maryland Energy Administration", "published_date": "2026-10-09", "references": [{"description": "Primary administrator source", "url": "https://energy.maryland.gov/Pages/CommunityEVSE.aspx"}], "required_documents": "My MEA application, eligibility certification, EIN/W-9, nonprofit status if applicable, owner permission for leased sites, project narrative/site plans and photos, utility/equipment details, completed Project and Budget Workbook; larger requests may require financial statements. Paid costs and quarterly reports for reimbursement.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public", "fleet", "workplace"], "source_grade": "PRIMARY", "source_ids": ["md-community-current-real", "md-community-foa-oct9"], "source_url": "https://energy.maryland.gov/Pages/CommunityEVSE.aspx", "stacking_rules": "Cannot fund the same scope/location with another MEA or Maryland-administered funding program, including VW/NEVI and prior Community EVSE awards", "state": "MD", "states": ["MD"], "status": "open", "summary": "Competitive community Level 2/DCFC funding, due December 9, 2026; the revised October 9 FOA has power/ownership port formulas and applicant caps. Costs before the grant's effective date are generally ineligible.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "Eligible Maryland community installation site", "title": "FY27 Community EVSE Grant Program", "unknown_fields": ["live remaining funding", "project-specific award", "individual scoring/award outcome"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": false, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Austin Energy", "afdc_ids": [], "afdc_topics": [], "amount": "50% of purchase price up to $500", "amount_formula": "min(50% charger purchase price, $500)", "application_route_notes": "Home charging application; Power Partner EV enrollment must precede the rebate application.", "application_route_type": "portal", "application_sequence": "Enroll Power Partner EV; buy/install compatible system; account holder submits complete online rebate application; approval required for payment.", "application_url": "https://rebates.austinenergy.com/OnlineApp/#enrollment/?programId=1026", "application_url_source_id": "tx-austin-home", "body": "Austin Energy electricity customers can receive 50% of an eligible home charger purchase, up to $500, after installation and Power Partner EV enrollment.", "bucket": "money", "candidate_states": ["TX"], "cap": "One rebate per enrolled charging system/device", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible new charger purchase", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Austin Energy electricity customers can receive 50% of an eligible home charger purchase, up to $500, after installation and Power Partner EV enrollment.", "effective_status": "open", "eligibility": "Austin Energy electricity customer with a purchased/leased plug-in EV, Power Partner EV enrollment and eligible charger or qualifying telematics vehicle; installation at applicant's address", "equipment_conditions": "New Level 2 compatible charger; UL/ETL/cETL listed equipment/receptacles and compliant installation", "excluded_costs": "This formula does not promise reimbursement of installation labor", "funding_limit": null, "geography_verified": true, "id": "tx-austin-home-charger", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "Home EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Apply after completed installation; Power Partner EV enrollment required before rebate application", "provider_id": "austin-energy", "provider_unit": "Austin Energy", "published_date": "2026-10-01", "references": [{"description": "Primary administrator source", "url": "https://austinenergy.com/green-power/plug-in-austin/home-charging"}], "required_documents": "Electric account number, charger manufacturer/model, VIN and fully paid charger receipt", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["tx-austin-home"], "source_url": "https://austinenergy.com/green-power/plug-in-austin/home-charging", "stacking_rules": null, "state": "TX", "states": ["TX"], "status": "open", "summary": "Austin Energy electricity customers can receive 50% of an eligible home charger purchase, up to $500, after installation and Power Partner EV enrollment.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Austin Energy electricity service accounts; not all Austin ZIPs", "title": "Home EV Charger Rebate", "unknown_fields": ["live remaining funding", "general end date", "other unpublished exclusions/stacking"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Austin Energy", "afdc_ids": [], "afdc_topics": [], "amount": "50% eligible cost; up to $700 Level 1, $3,000 Level 2 or $5,000 DCFC per station", "amount_formula": "50% documented eligible cost within technology cap", "application_route_notes": "Commercial charging application after completion, inspection and activation.", "application_route_type": "portal", "application_sequence": "Confirm eligibility; purchase/install with permits; inspect/activate; submit rebate application within 180 days of completion.", "application_url": "https://rebates.austinenergy.com/OnlineApp/#enrollment/default?programId=1078", "application_url_source_id": "tx-austin-commercial-application-link-review", "body": "Austin Energy's commercial account offer reimburses 50% of eligible purchase/installation cost within technology caps, after completed installation/inspection/activation.", "bucket": "money", "candidate_states": ["TX"], "cap": "Six stations per service address per fiscal year; one application per address (October–September)", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible station purchase and installation", "deadline": "Within 180 days of completed installation/activation; fiscal-year station limit applies", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Austin Energy's commercial account offer reimburses 50% of eligible purchase/installation cost within technology caps, after completed installation/inspection/activation.", "effective_status": "open", "eligibility": "Austin Energy commercial account holder or authorized representative at eligible service address; qualified contractor/final permit and required equipment/network conditions", "equipment_conditions": "Compliant listed new charging station; specified OCPP/network conditions; DCFC public access required", "excluded_costs": "Station upgrades to a newer model, leases and make-ready are not eligible for the rebate.", "funding_limit": null, "geography_verified": true, "id": "tx-austin-commercial-charger", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "Commercial EV Charging Station Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Current application follows completed installation, permit inspection and activation", "provider_id": "austin-energy", "provider_unit": "Austin Energy", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://austinenergy.com/en/green-power/plug-in-austin/workplace-charging"}], "required_documents": "Active Austin Energy account, manufacturer/model/serial details, itemized paid-in-full station and installation invoice, electrician name/web address, applicable permit/final inspection, installed-site photos showing each station/signage, and certificate of property/general liability insurance.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public", "workplace"], "source_grade": "PRIMARY", "source_ids": ["tx-austin-commercial", "tx-austin-commercial-application-link-review"], "source_url": "https://austinenergy.com/en/green-power/plug-in-austin/workplace-charging", "stacking_rules": null, "state": "TX", "states": ["TX"], "status": "open", "summary": "Austin Energy's commercial account offer reimburses 50% of eligible purchase/installation cost within technology caps, after completed installation/inspection/activation.", "superseded_by": null, "technologies": ["Level 1", "Level 2", "DC fast"], "territory": "Austin Energy commercial electricity accounts only", "title": "Commercial EV Charging Station Rebate", "unknown_fields": ["live remaining funding", "general end date", "individual project final eligible cost"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Sacramento Municipal Utility District", "afdc_ids": [], "afdc_topics": [], "amount": "Charger up to $100; circuit-sharing/energy-management device up to $200; qualifying circuit installation up to $750", "amount_formula": "Actual paid cost limited by each applicable component cap; do not add mutually inapplicable components as guaranteed savings", "application_route_notes": "Standard Charge@Home application; circuit-installation incentives use the required SMUD Contractor Network route.", "application_route_type": "form", "application_sequence": "Confirm vehicle/account and eligible design/product; use equipment reimbursement or network installation route; complete work and supporting documents; SMUD reviews and pays approved incentive.", "application_url": "https://www.smud.org/Going-Green/Electric-Vehicles/Charge-at-Home-application-page/Charge-at-Home-application", "application_url_source_id": "ca-smud-home-apply", "body": "SMUD's eligible home equipment and contractor-network circuit installation incentives have separate caps; its advertised $850 combines a $100 charger with up to $750 qualifying circuit work.", "bucket": "money", "candidate_states": ["CA"], "cap": "One combined equipment/device and installation rebate per account/address for its lifetime", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Listed eligible new charger/device and qualifying circuit installation processed through SMUD Contractor Network", "deadline": "Eligible work after December 8, 2021; qualifying network circuit route effective May 1, 2023; no general end date stated", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "SMUD's eligible home equipment and contractor-network circuit installation incentives have separate caps; its advertised $850 combines a $100 charger with up to $750 qualifying circuit work.", "effective_status": "open", "eligibility": "SMUD residential customer; light-duty four-wheel plug-in vehicle DMV registration name/address match the utility account; owner permission where needed; eligible completed work", "equipment_conditions": "Listed new Level 2 charger, maximum 32A/7.7 kW on maximum 40A breaker, J1772 or NACS, ENERGY STAR/NRTL and three-year warranty; separate device/circuit specifications apply", "excluded_costs": "Motorcycles; ineligible products/circuit sizing; installation rebate outside the required network; costs above actual paid amount", "funding_limit": null, "geography_verified": true, "id": "ca-smud-charge-home", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "SMUD Charge@Home", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Equipment may be already purchased; use the SMUD Contractor Network route for installation incentive, confirm qualifying design before work", "provider_id": "sacramento-municipal-utility-district", "provider_unit": "Sacramento Municipal Utility District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.smud.org/Going-Green/Electric-Vehicles/Charge-at-Home-application-page/Charge-at-Home-Terms-and-Conditions"}], "required_documents": "Signed application, matching DMV registration, itemized equipment receipt; network contractor invoice with license, circuit/amperage/wire and installation details, plus permit", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ca-smud-home-terms", "ca-smud-home-apply", "ca-smud-home"], "source_url": "https://www.smud.org/Going-Green/Electric-Vehicles/Charge-at-Home-application-page/Charge-at-Home-Terms-and-Conditions", "stacking_rules": null, "state": "CA", "states": ["CA"], "status": "open", "summary": "SMUD's eligible home equipment and contractor-network circuit installation incentives have separate caps; its advertised $850 combines a $100 charger with up to $750 qualifying circuit work.", "superseded_by": null, "technologies": ["Level 2"], "territory": "SMUD residential electricity service account", "title": "SMUD Charge@Home", "unknown_fields": ["live funding balance", "any future program change", "individual project rebate"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Sacramento Municipal Utility District", "afdc_ids": [], "afdc_topics": [], "amount": "Non-equity Level 2 $2,500 (<6.6 kW) or $3,500 (6.6 kW+); non-public DCFC $7,500 (<50 kW), $15,000 (50–149.9 kW) or $30,000 (150 kW+) per handle. Current equity table doubles these amounts.", "amount_formula": "Applicable equipment/handle formula and project-size rules, no more than actual project cost after other funding", "application_route_notes": "Commercial EV program application and reservation of incentive before construction.", "application_route_type": "portal", "application_sequence": "Submit complete PowerClerk application and plans, project proof, Grid Capacity Evaluation and W-9s; resolve SMUD review; obtain the fully countersigned Reservation of Incentive before construction. Complete installation and AHJ sign-off; submit Project Documentation Form, paid costs and each charger’s identifiers/GPS/photos; complete any SMUD inspection/data-meter requirements before approved payment and ongoing obligations.", "application_url": "https://smudcev.powerclerk.com/MvcAccount/Login", "application_url_source_id": "ca-smud-business", "body": "SMUD's commercial program has equipment/power and equity-specific handle incentives, reserved funds before construction and separate metering/LCFS requirements.", "bucket": "money", "candidate_states": ["CA"], "cap": "Per site/year: low-power Level 2/smart outlets maximum 50 units; high-power Level 2 and low-power DCFC maximum ten handles; mid/high-power DCFC maximum two handles. Stub-outs maximum 40 and no more than ten per incentivized charger; onboard-storage DCFC maximum two units/handles. Combined funding cannot exceed 100% of actual project costs.", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Eligible EVSE engineering, construction, equipment, materials, removal/recycling, overhead, tax, permits, shipping and labor; listed qualifying panel/transformer upgrades, stub-outs and DCFC onboard storage. Total incentives cannot exceed actual project costs.", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "SMUD's commercial program has equipment/power and equity-specific handle incentives, reserved funds before construction and separate metering/LCFS requirements.", "effective_status": "open", "eligibility": "SMUD commercial electricity service customer/site, eligible equipment owner/applicant/payee and licensed contractor; equity designation must be confirmed under current requirements", "equipment_conditions": "Hardwired, UL-approved equipment at a SMUD commercial account, with minimum three-year warranty, eligible connector and required SMUD data/revenue metering and electrical standards T017/T004. Networked and non-networked equipment can qualify. All projects need AHJ-finalized building permits. Multifamily is limited to the 1.6-to-under-6.6 kW low-power Level 2/smart-outlet category; smart outlets need user charging/billing control. Current manual performance, site/year limits and equity rules govern.", "excluded_costs": "Public DCFC is not the listed non-public DCFC incentive; at multifamily sites only the low-power Level 2/smart-outlet category is available. New-construction code-minimum EVSE is ineligible; CALeVIP 1.0 Sacramento stacking is excluded. LCFS sharing separately excludes publicly facing DCFC over 50 kW, Level 2 projects with ten or fewer handles, and multifamily commercial-service equipment.", "funding_limit": null, "geography_verified": true, "id": "ca-smud-commercial-evse", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "SMUD Commercial EVSE Incentives", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Apply and receive SMUD Reservation of Incentive before construction", "provider_id": "sacramento-municipal-utility-district", "provider_unit": "Sacramento Municipal Utility District", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.smud.org/driveelectricbusiness"}], "required_documents": "Initial: completed PowerClerk application; electrical plan set with one-line/load calculations and EVSE site plan; signed installation contract or equipment purchase order, or qualifying eight-digit SMUD service notification; Grid Capacity Evaluation; incentive-payee W-9 and separate LCFS-payee W-9 if applicable. Applicant, host and payees sign the reservation before SMUD countersigns. Final: Project Documentation Form, revised plans if needed, paid final invoices, signed-off building permit, each charger make/model/serial and GPS coordinates, and installation/metering photos including vehicle VINs where applicable; disclose other funding.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "workplace", "fleet"], "source_grade": "PRIMARY", "source_ids": ["ca-smud-business", "ca-smud-business-manual"], "source_url": "https://www.smud.org/driveelectricbusiness", "stacking_rules": "Disclose other funding; incentives cannot exceed 100% of project costs; LCFS rights/sharing rules apply where eligible", "state": "CA", "states": ["CA"], "status": "open", "summary": "SMUD's commercial program has equipment/power and equity-specific handle incentives, reserved funds before construction and separate metering/LCFS requirements.", "superseded_by": null, "technologies": ["Level 2", "DC fast"], "territory": "SMUD commercial electricity accounts", "title": "SMUD Commercial EVSE Incentives", "unknown_fields": ["live funding balance", "individual project-size cap", "project-specific equity/LCFS qualification"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "PSEG Long Island", "afdc_ids": [], "afdc_topics": [], "amount": "Up to $100 standard or $400 enhanced, no more than charger purchase cost", "amount_formula": "min(actual eligible new charger cost, $100 or qualifying $400 cap)", "application_route_notes": "Current 2026 PDF includes the application and email/mail submission instructions.", "application_route_type": "form", "application_sequence": "Buy and install the qualifying listed charger on or after January 1, 2026; complete and sign the current application, select account credit or check, and attach the paid receipt plus installed-equipment and model/serial photos. Submit by the PDF’s stated email/mail instructions; administrator verifies eligibility and purchase/installation before approving the rebate.", "application_url": "https://www.psegliny.com/saveenergyandmoney/greenenergy/ev/-/media/E65F8958000443BA8A282EB79714F7F5.ashx", "application_url_source_id": "ny-pseg-home-2026-terms", "body": "PSEG Long Island offers up to $100 for an eligible 2026 Level 2 charger, or up to $400 for qualifying DAC/Household Assistance customers. Hardware purchase, electricity account and listed-product rules apply.", "bucket": "money", "candidate_states": ["NY"], "cap": "One rebate per residential electricity account", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "New qualifying Level 2 charger purchase", "deadline": "2026 calendar-year funding, until exhausted; no specific application date stated in reviewed terms", "deadline_date": null, "disposition": "retained-current", "disposition_reason": "PSEG Long Island offers up to $100 for an eligible 2026 Level 2 charger, or up to $400 for qualifying DAC/Household Assistance customers. Hardware purchase, electricity account and listed-product rules apply.", "effective_status": "open", "eligibility": "Existing PSEG Long Island active residential account; purchase/install January 1, 2026 or later; enhanced qualification through DAC location OR Household Assistance enrollment", "equipment_conditions": "New Level 2 on the PSEG-LI EPRI vetted list at purchase; licensed installation at account address", "excluded_costs": "Used/refurbished equipment, free vehicle-bundled charger without separate proof of payment; labor is not part of the equipment-cost formula", "funding_limit": null, "geography_verified": true, "id": "ny-pseg-home-charger", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "2026 Residential Charger Rebate", "next_review_date": "2026-11-12", "opens_date": "2026-01-01", "preapproval": "Current application follows purchase and installation; rebate is subject to review and annual funding", "provider_id": "pseg-long-island", "provider_unit": "PSEG Long Island", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.psegliny.com/saveenergyandmoney/greenenergy/ev/-/media/E65F8958000443BA8A282EB79714F7F5.ashx"}], "required_documents": "Completed signed application, sales receipt and installed charger/model/serial photos; online purchase delivery/purchaser must match account, in-store purchase within service area", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ny-pseg-home-2026-terms", "ny-pseg-home", "ny-pseg-application-link-review"], "source_url": "https://www.psegliny.com/saveenergyandmoney/greenenergy/ev/-/media/E65F8958000443BA8A282EB79714F7F5.ashx", "stacking_rules": null, "state": "NY", "states": ["NY"], "status": "open", "summary": "PSEG Long Island offers up to $100 for an eligible 2026 Level 2 charger, or up to $400 for qualifying DAC/Household Assistance customers. Hardware purchase, electricity account and listed-product rules apply.", "superseded_by": null, "technologies": ["Level 2"], "territory": "PSEG Long Island electricity accounts in its Long Island/Rockaways service area, not PSEG New Jersey", "title": "2026 Residential Charger Rebate", "unknown_fields": ["live remaining annual funding", "unpublished final application cutoff", "individual enhanced qualification"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Shrewsbury Electric and Cable Operations", "afdc_ids": [], "afdc_topics": [], "amount": "50% of charger cost up to $350", "amount_formula": "min(50% eligible charger cost, $350)", "application_route_notes": "NextZero application following qualifying Connected Homes enrollment; select SELCO/Shrewsbury.", "application_route_type": "portal", "application_sequence": "Confirm BEV/account and enrollment route; install; enroll; apply. Early removal triggers one-time recovery of rebated amount.", "application_url": "https://rebates.nextzero.org/", "application_url_source_id": "ma-selco-nextzero-current", "body": "SELCO's current NextZero administrator offers 50% of a qualifying charger up to $350 with 36-month Connected Homes participation; installation cost and plug-in hybrids are excluded.", "bucket": "money", "candidate_states": ["MA"], "cap": "$350 charger rebate; 36-month participation/recovery condition", "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Qualifying residential charger purchase", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "SELCO's current NextZero administrator offers 50% of a qualifying charger up to $350 with 36-month Connected Homes participation; installation cost and plug-in hybrids are excluded.", "effective_status": "open", "eligibility": "SELCO residential customer with qualifying fully electric vehicle; enroll compatible charger OR eligible vehicle telematics in Connected Homes for 36 months", "equipment_conditions": "ChargePoint/Emporia smart Level 2 charger for device enrollment; qualifying BEV telematics route may use other charger brands; licensed electrician/design and compliant installation", "excluded_costs": "Installation labor and plug-in hybrid vehicle participants; no Connected Homes device incentive for the rebated EV/charger during 36-month term", "funding_limit": null, "geography_verified": true, "id": "ma-selco-home-charger", "kind": "rebate", "level": "utility", "matching_requirement": null, "name": "SELCO Residential EV Charger Rebate", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Consult electrician, buy/install, enroll Connected Homes, then apply with dated receipt", "provider_id": "shrewsbury-electric-and-cable-operations", "provider_unit": "Shrewsbury Electric and Cable Operations", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://nextzero.org/shrewsbury/ev-charger-rebate-program/"}], "required_documents": "Administrator application, dated sales receipt and Connected Homes enrollment", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["home"], "source_grade": "PRIMARY", "source_ids": ["ma-selco-nextzero-current"], "source_url": "https://nextzero.org/shrewsbury/ev-charger-rebate-program/", "stacking_rules": "No separate Connected Homes EV/charger incentive during the 36-month rebate term", "state": "MA", "states": ["MA"], "status": "open", "summary": "SELCO's current NextZero administrator offers 50% of a qualifying charger up to $350 with 36-month Connected Homes participation; installation cost and plug-in hybrids are excluded.", "superseded_by": null, "technologies": ["Level 2"], "territory": "SELCO electricity accounts in Shrewsbury", "title": "SELCO Residential EV Charger Rebate", "unknown_fields": ["live funding balance", "general end date", "other unpublished document checks"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "Dominion Energy Virginia", "afdc_ids": [], "afdc_topics": [], "amount": "50% upfront incentive on qualifying make-ready construction/installation; remaining costs paid on bill", "amount_formula": "Site-specific approved make-ready cost share", "application_route_notes": "Program interest form starts the site assessment and customized proposal; it is not an immediate cash-rebate claim.", "application_route_type": "form", "application_sequence": "Request assessment; agree site/equipment/proposal and contracts; ready site/insurance/network; program installation/operation.", "application_url": "https://dominionenergycrm.my.site.com/evinterestform/s/", "application_url_source_id": "va-dominion-level2", "body": "Virginia commercial/industrial customers can request a site-specific Level 2 proposal with 50% make-ready support and remaining costs paid on bill over ten years; minimum two qualifying stations and a service contract apply.", "bucket": "money", "candidate_states": ["VA"], "cap": null, "change_trigger": "Primary terms, application status or deadline changes", "covered_costs": "Qualifying program make-ready construction/installation", "deadline": null, "deadline_date": null, "disposition": "retained-current", "disposition_reason": "Virginia commercial/industrial customers can request a site-specific Level 2 proposal with 50% make-ready support and remaining costs paid on bill over ten years; minimum two qualifying stations and a service contract apply.", "effective_status": "open", "eligibility": "Dominion Virginia commercial/industrial electricity customer, site decision authority, at least two qualifying stations, ready site and signed service contract", "equipment_conditions": "Utility installed/owned make-ready; approved utility-maintained hardware or compliant customer hardware, network/managed charging, ENERGY STAR/UL, outdoor durability and ten-year useful life", "excluded_costs": "This is not a guaranteed cash rebate for any independently purchased charger; customer's remaining charges are contractual", "funding_limit": null, "geography_verified": true, "id": "va-dominion-commercial-level2", "kind": "make-ready-and-financing", "level": "utility", "matching_requirement": null, "name": "Dominion Virginia Level 2 Charging Program", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Interest form, desktop/site assessment, customized proposal and executed contracts before installation", "provider_id": "dominion-energy-virginia", "provider_unit": "Dominion Energy Virginia", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/charging-on-the-go/level-2-charging-program"}], "required_documents": "Program interest/site details, proposal/contracts, insurance certificate, network account, permissions/easements and site-readiness evidence", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["business", "multifamily", "public", "workplace"], "source_grade": "PRIMARY", "source_ids": ["va-dominion-level2"], "source_url": "https://www.dominionenergy.com/virginia/save-energy/electric-vehicles/charging-on-the-go/level-2-charging-program", "stacking_rules": null, "state": "VA", "states": ["VA"], "status": "open", "summary": "Virginia commercial/industrial customers can request a site-specific Level 2 proposal with 50% make-ready support and remaining costs paid on bill over ten years; minimum two qualifying stations and a service contract apply.", "superseded_by": null, "technologies": ["Level 2"], "territory": "Dominion Energy Virginia electric commercial/industrial service accounts", "title": "Dominion Virginia Level 2 Charging Program", "unknown_fields": ["site-specific price/cap", "eligibility for underserved no-cost solution", "full participant contract", "available capacity"], "unresolved_conditions": [], "updated": "2026-10-13", "utility_customer_required": true, "utility_ids": [], "verified_date": "2026-10-13"}, {"administrator": "CALSTART / California Energy Commission", "afdc_ids": [], "afdc_topics": [], "amount": null, "amount_formula": null, "application_sequence": null, "application_url": null, "body": "The administrator announces Funding Wave 5 Coming Soon. Existing Wave4 amounts and readiness information are preparation context; a current open wave and its controlling terms are not confirmed.", "bucket": "money", "candidate_states": ["CA"], "cap": null, "change_trigger": "Publication of Wave5 manual, eligible equipment and application period.", "covered_costs": null, "deadline": null, "deadline_date": null, "disposition": "unresolved", "disposition_reason": "Actual current administrator status was reviewed; new-wave current terms and opening date are not published in the checked pages.", "effective_status": "unverified", "eligibility": "Current preparation context focuses on multifamily housing and related sites; property owner, authorized lessee or representative must incur eligible costs. Future wave eligibility may change.", "equipment_conditions": "Program context covers Level 1 smart outlets and Level 2 chargers; the next funding wave equipment list and caps remain unverified.", "excluded_costs": null, "funding_limit": null, "geography_verified": true, "id": "ca-communities-in-charge", "kind": "rebate", "level": "state", "matching_requirement": null, "name": "Communities in Charge", "next_review_date": "2026-11-12", "opens_date": null, "preapproval": "Review the next published implementation manual and application window before committing costs; the reviewed banner does not certify applications are open.", "provider_id": "calstart-communities-in-charge", "provider_unit": "CALSTART / California Energy Commission", "published_date": null, "references": [{"description": "Primary administrator source", "url": "https://thecommunitiesincharge.org/"}], "required_documents": "Preparation context lists site verification, final design/construction drawings, issued permit or permit application and eligible equipment selection according to readiness tier. Next-wave checklist remains unverified.", "retrieved_date": "2026-10-13", "reviewed_date": "2026-10-13", "segments": ["multifamily"], "source_grade": "UNVERIFIED", "source_ids": ["ca-community-charge-home", "ca-community-charge-eligibility"], "source_url": "https://thecommunitiesincharge.org/", "stacking_rules": null, "state": "CA", "states": ["CA"], "status": "unverified", "summary": "The administrator announces Funding Wave 5 Coming Soon. Existing Wave4 amounts and readiness information are preparation context; a current open wave and its controlling terms are not confirmed.", "superseded_by": null, "technologies": ["Level 1", "Level 2"], "territory": "Eligible California multifamily or related community site; next-wave site criteria control", "title": "Communities in Charge", "unknown_fields": ["next wave opening/deadline", "next wave amounts/caps", "next wave controlling terms"], "unresolved_conditions": ["The current banner says Funding Wave 5 Coming Soon; this review did not establish current application acceptance or Wave5 amounts."], "updated": "2026-10-13", "utility_customer_required": null, "utility_ids": [], "verified_date": null}], "reviewed_date": "2026-10-13", "rights": "Administrator facts attributed to each source; underlying source terms apply. No reproduction license for third-party prose or logos is granted.", "schema_version": "evreadyusa.verified-data.v1"}